9 yrs
In the waterfirst COD 2017
19
Projects1 country
4.58 GW
Delivered & operating13 projects, net of stake

Outlook

Strategic outlook pending

Huaneng Group has a live portfolio below, but no authored strategic profile yet — stated targets, capital discipline, and the timeline of public statements. Strategic coverage rolls out developer by developer; the portfolio here is derived live in the meantime.

Portfolio

19 held · live stages first, exits last
Operational · 4.58 GW (13)Under Construction · 1.82 GW (4)Early Development · 0 GW (1)Proposed · 2.05 GW (1)

Capacity is net of ownership stake — a 50% JV counts half. Gross exposure (full nameplate of every project held): 9.04 GW. Some stakes are undisclosed, so net GW is a floor.

ProjectCountryStageMWStakeNet MW
Huaneng Qidong Offshore China Operational 802 100% 802
Hainan Lingao China Operational 600
Bandaobei BW China Operational 510 100% 510
Rudong H3 Huaneng China Operational 500 100% 500
Dafeng Huaneng China Operational 406 100% 406
Huaneng Dalian Zhuanghe IV1 China Operational 350 100% 350
Guanyun Huaneng China Operational 303 100% 303
Rudong Baxianjiao China Operational 302 100% 302
Sheyang Southern H1 China Operational 302 100% 302
Bandaonan 4 China Operational 302 100% 302
Cangnan 2 China Operational 301 100% 301
Jiaxing 2 China Operational 300 100% 300
Dalian Zhuanghe Site IV-2 China Operational 200 100% 200
Yuhuan No.2 China Under Construction 504 100% 504
Huaneng Peninsula North L Area China Under Construction 504 100% 504
Huaneng Peninsula South K Area China Under Construction 504 100% 504
Daishan 1 China Under Construction 304 100% 304
Jiangsu Yancheng Offshore Wind Cluster (Phase 1) China Early Development 100% 0
Liaodong Bay Huaneng China Proposed 2050 100% 2050