Huaneng Qidong Offshore

Located off Qidong, Nantong, at the Yangtze River mouth. 114.5 km2 site. Annual generation ~2.2 TWh.

Project timeline verified milestones only — each date carries its provenance mark

Dashed tick marks today (9 Sep 2026).

Revenue & offtake the regime the project was built under

Offtake regime: FIT (CNY 0.85/kWh)
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2021-12-25

Sources & verification

0/12 fields verified · rests on 6 sources
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press5
[2]
offshoreWIND.biz2021-12
Press report — cited, not quoted; read it at the source link.
supportsoperatorConstruction startCommercial operationSite rightsTurbines+3 more
[3]
Carbon Trust2014
supportsMechanismDetail
[4]
Global Energy Monitor2026
supportsCoordinates
[5]
GEBCO Compilation Group2020
supportsWater depth
[6]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
Press report — cited, not quoted; read it at the source link.
supportsTurbinesTotal capacity