Huaneng Qidong Offshore
Located off Qidong, Nantong, at the Yangtze River mouth. 114.5 km2 site. Annual generation ~2.2 TWh.
Status
Operationallifecycle stage
Ownership
CHChina Huaneng Group — 100% ◇
Location
East China Sea
Technology
Capacity
802 MW ◇
Turbines
134 ◇
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Water depth
1–4 m ≈
Wind speed
7.2 m/s @ 100 m ≈
Revenue & grid
Offtake
FiT ◇
Grid
Not recorded ◇
Connection
220 kV offshore booster station to Qidong onshore substation ◇
Schedule
COD
25 Dec 2021 ◇
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (9 Sep 2026).
Revenue & offtake the regime the project was built under
Offtake regime: FIT (CNY 0.85/kWh)
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2021-12-25
Sources & verification
0/12 fields verified · rests on 6 sources
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press5
[2]
offshoreWIND.biz2021-12
Press report — cited, not quoted; read it at the source link.
supportsoperatorConstruction startCommercial operationSite rightsTurbines+3 more
[3]
[4]
[5]
[6]
Unverified import1
[1]
unknown
Press report — cited, not quoted; read it at the source link.
supportsTurbinesTotal capacity