Developer profile

China Longyuan Power

outlook pending

About

No authored description yet — the figures below are derived live from the project records.

15 yrs
In the waterfirst COD 2011
14
Projects1 country
2.39 GW
Delivered & operating10 projects, net of stake

Outlook

Strategic outlook pending

China Longyuan Power has a live portfolio below, but no authored strategic profile yet — stated targets, capital discipline, and the timeline of public statements. Strategic coverage rolls out developer by developer; the portfolio here is derived live in the meantime.

Portfolio

14 held · live stages first, exits last
Operational · 2.39 GW (10)Under Construction · 0.30 GW (3)Proposed · 0.30 GW (1)

Capacity is net of ownership stake — a 50% JV counts half. Gross exposure (full nameplate of every project held): 3.39 GW. Some stakes are undisclosed, so net GW is a floor.

ProjectCountryStageMWStakeNet MW
Putian Nanridao China Operational 400 100% 400
Jiangjiasha H1 China Operational 350 100% 350
Dafeng H4 Longyuan China Operational 303 100% 303
Dafeng H6 Longyuan China Operational 303 100% 303
Sheyang Southern H2 China Operational 302 100% 302
Rudong C4 Longyuan China Operational 200 100% 200
Dafeng H7 Longyuan China Operational 200 100% 200
Rudong Longyuan Intertidal Demonstration China Operational 195 100% 195
Sheyang Southern H2-1 China Operational 104 100% 104
Rudong Intertidal Zone Experimental China Operational 32 100% 32
Mazu Island China Under Construction 300 100% 300
Jiangsu Dafeng H2 (Longyuan) China Under Construction 300
Jiangsu Dafeng H2-1 (Longyuan) China Under Construction 100
Sheyang Southern H4 China Proposed 300 100% 300