15 yrs
In the waterfirst COD 2011
14
Projects1 country
2.39 GW
Delivered & operating10 projects, net of stake
Outlook
Strategic outlook pending
China Longyuan Power has a live portfolio below, but no authored strategic profile yet — stated targets, capital discipline, and the timeline of public statements. Strategic coverage rolls out developer by developer; the portfolio here is derived live in the meantime.
Portfolio
14 held · live stages first, exits lastCapacity is net of ownership stake — a 50% JV counts half. Gross exposure (full nameplate of every project held): 3.39 GW. Some stakes are undisclosed, so net GW is a floor.
| Project | Country | Stage | MW | Stake | Net MW |
|---|---|---|---|---|---|
| Putian Nanridao | China | Operational | 400 | 100% | 400 |
| Jiangjiasha H1 | China | Operational | 350 | 100% | 350 |
| Dafeng H4 Longyuan | China | Operational | 303 | 100% | 303 |
| Dafeng H6 Longyuan | China | Operational | 303 | 100% | 303 |
| Sheyang Southern H2 | China | Operational | 302 | 100% | 302 |
| Rudong C4 Longyuan | China | Operational | 200 | 100% | 200 |
| Dafeng H7 Longyuan | China | Operational | 200 | 100% | 200 |
| Rudong Longyuan Intertidal Demonstration | China | Operational | 195 | 100% | 195 |
| Sheyang Southern H2-1 | China | Operational | 104 | 100% | 104 |
| Rudong Intertidal Zone Experimental | China | Operational | 32 | 100% | 32 |
| Mazu Island | China | Under Construction | 300 | 100% | 300 |
| Jiangsu Dafeng H2 (Longyuan) | China | Under Construction | 300 | — | — |
| Jiangsu Dafeng H2-1 (Longyuan) | China | Under Construction | 100 | — | — |
| Sheyang Southern H4 | China | Proposed | 300 | 100% | 300 |