Hainan Lingao
Hainan Lingao. GEM records phase 1 600 MW (2024) operating.
Status
Operationallifecycle stage
Ownership
CHChina Huaneng Group ◇
Location
South China Sea
Technology
Capacity
600 MW ◇
Turbines
60 ◆
Foundation
Fixed-bottom (structure not recorded) ◇
Site & conditions
Site rights
Seabed rights held ∴
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Taken · date not recorded ∴
COD
2025 ◇
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (9 Sep 2026).
Revenue & offtake the regime the project was built under
Offtake regime of the vintage — not a recorded contract
Post-subsidy era — provincial pricing (NDRC notice 2021)
Built after the national subsidy ended. From 2021, newly approved offshore wind projects are priced by the provincial price authority — through competitive allocation where conditions allow — with no central subsidy; the grid company settles the part within the local coal benchmark price. A project approved before 2021 that connected after the 2021 deadline takes the guide price of its connection year. Provincial top-ups (Guangdong, Shandong, Zhejiang and others) exist and are recorded on projects only where a source states them. · ◇
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2025
Sources & verification
2/9 fields verified · rests on 5 sources · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[4]
国家能源局 (National Energy Administration)2025-02-28◆ 逐梦“清洁能源岛” (海南首个海上风电项目华能临高CZ1并网)
“2024年12月27日,海南省首个海上风电项目——华能临高CZ1海上风电项目并网发出第一度海上绿电, 标志着海南清洁能源发展翻开崭新一页。这座位于临高县西北部海域的风电场,装备了60台单机容量为 10兆瓦的风力发电机组,每台机组在额定风速下每小时可生产1万度电。 [EN] On 27 December 2024, Hainan's first offshore wind project — the…”
supportsFirst powerTurbines
Trade press4
[1]
Global Energy Monitor2026◆ Hainan Lingao Offshore wind farm
supportsoperatorConsentFinal investment decisionCommercial operationSite rights+3 more
[2]
Global Energy Monitor◆ Global Wind Power Tracker Methodology
“Offshore hard mount: have wind turbines that are usually designed for installation in water no deeper than 60 meters [...] Offshore floating: are an emerging technology designed for installation in de…”
supportsFoundation
[3]
Global Energy Monitor2026◆ Hainan CZ1 Offshore wind farm
supportsCommercial operationTotal capacityFoundationCoordinates
[5]
海南日报 (Hainan Daily)2025-02-21◆ 华能临高海上风电项目全容量并网
Press report — cited, not quoted; read it at the source link.
supportsCommercial operation