Rudong Intertidal Zone Experimental

Project timeline verified milestones only — each date carries its provenance mark

2012’13’14’15’16’17’18’19’20’21’22’23’24’25’26View the source for Commercial operationCommercial operation 2011
Dashed tick marks today (9 Sep 2026).

Revenue & offtake the regime the project was built under

Offtake regime not on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
built before satellite radar could be used to count it (the archive begins in 2014)
Installation · on record
StageOperational
In operation since2011

Sources & verification

0/10 fields verified · rests on 4 sources · ◆ 2 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press4
[1]
Global Energy Monitor2026◆ Jiangsu Rudong Intertidal Zone Experimen…
supportsownerConsentFinal investment decisionCommercial operationSite rights+3 more
[2]
GEBCO Compilation Group2020
supportsWater depth
[3]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[4]
Global Energy Monitor◆ Global Wind Power Tracker Methodology
“Offshore hard mount: have wind turbines that are usually designed for installation in water no deeper than 60 meters [...] These turbines are mounted directly onto the sea floor. Offshore floating: ar…”
supportsFoundation