Market profile

Italy

emerging * buildout: pending risk: pending outlook: pending

* maturity derived from capacity data; full assessment pending.

0
GW operational
0
GW in construction
2.0
GW pipeline
18
projects
Operational · 0 GW (1)Early Development · 2 GW (4)Proposed · 13.5 GW (13)
Progress to target
0%
0 GW operational of 2 GW by 2030
PNIEC 2024 offshore wind
Next auction round
Italy first dedicated offshore auction (FER2 offshore contingent)
2027 · tender · planned
3.8 GW offered
full auction outlook ↓

Assessment

Assessment pending

This market has a derived snapshot above but no in-depth assessment yet. Authored coverage rolls out market by market; the data here is live in the meantime.

State of the market

as of 2026-09-09
0%
of GW sited through contested rounds
6 yr
median award → power
delivered (COD actuals)unweighted dated pipeline (building / contracted / early)Expected Buildout (confidence-weighted)national target (range)superseded targettoday
012GW202520302035todayEXPECTED BUILDOUT → 0.8 GW+ early → 0.5+ building → 0.0 GW+ contracted → 0.00.0 GW operational2.1 GW target · 2030

Teal line = the Hafrok Expected Buildout (confidence-weighted): 2.0 GW of live pipeline weights to 0.9 GW expected to complete, timed by each project's COD distribution (mass beyond 2037 not drawn). Bands are the unweighted dated pipeline — the Expected Buildout also models on-hold and undated projects, so it can sit above them. 1.5 GW of pipeline has no dated COD and is not in the bands.

How this line is made

The Expected Buildout line answers one question: of the pipeline announced today, how much actually gets built, and when? It is not a scenario and not a target tracker — it is the database's live pipeline, passed through two filters measured from the industry's own delivery record.

Whether a project completes. Every project in development carries a completion weight, banded Delivering / Expected / Prospective / Fragile. A proposal — a site where no authority has yet granted rights — carries none and sits outside this line entirely; it is listed, not counted. The starting point is the historical completion rate of its lifecycle stage — of projects that reached construction, 97% delivered; financed but not yet building, 92%; consented without financing, 75%; early development, 61%; on hold, 15%. That base rate is then adjusted by what the project has actually secured (offtake, grid, consents, investment decision) and decays if a project sits quiet past its stage's normal dwell time.

When it delivers. Each project also carries a completion-date distribution — a shape, not a single year, right-skewed because offshore wind slips late far more often than it runs early. The peak sits on a rule-based expected date chained from the project's latest achieved milestone; the width of the late tail is fitted to how far past their announced dates real projects actually landed: builders slip tight (68% on time, n=158), financed projects tighter still (72%, n=101), consented-only projects carry the fat tail — 25% land three or more years late (n=133). A stated date faster than any comparable project has ever achieved is floored to the achievable window and flagged, never taken at face value.

The line is the sum, across every live project, of capacity × completion weight × the probability it delivers in each year. For projects already under construction, a share of expected capacity is counted at first power — turbines start generating before a wind farm is fully commissioned — so a market's chart can show capacity arriving a year before a project's stated completion date. Delivered history is metered fact; the line inherits every assumption above and nothing else.

Honest limits. The weights are calibrated on a fleet whose failures have so far been overwhelmingly pre-financing — completion rates after FID rest on a record with few failures, so they are ceilings, not guarantees. The slip fitted on consented projects is the loosest (the "three or more years late" bucket spans many years). Policy shocks arrive faster than base rates move — the weights see a stop-work order only as its lifecycle consequences accrue. And the line redistributes as the database learns: it is re-derived on every data refresh, not frozen.

Full per-project workings — each project's weight, band, expected date and distribution — are on its project page. Calibration v2.0-phase0 · generated 2026-09-09; every figure above is read from the generated calibration file, never typed.

Auction outlook

forecast · 1 round tracked
Seabed leaseOfftake awardIntegrated tenderscheduled — bar spans the expected windowplanned (indicative)postponed / suspendedno date yet (off-axis)
202720282029todayPLANNED — INDICATIVEItaly first dedicated offshore auction (FER2 offshore contingent) · 2027 · planned · 3.8 GW offeredItaly first dedicated offshore auction (FER… · 3.8 GW
Integrated tender Italy first dedicated offshore auction (FER2 offshore contingent) planned
What the date rests on — stated by industry at Seanergy (May 2026) after informal MASE–Commission talks — strike-price revision by end-2026, auction "at the latest in 2027"; no MASE notice

dated 2027 (planned). At Seanergy (20 May 2026) Nadara's offshore analyst reported the government "involved in an informal discussion with the European Commission to revise the regulatory mechanism" of FER2 — a separate floating tariff instead of the single EUR 185/MWh cap — with the revision hoped "by the end of this year and after that we are expecting an auction at the latest in 2027"; 2.3 GW already consented could apply. An industry statement of the government's timetable, not a MASE notice: hence planned, a bare year. Earlier: Italy has held NO dedicated offshore auction. […]

Origination ladder

settled rounds → projects
Seabed leaseOfftake awardIntegrated tenderbirth award (colour = round type)no auction award on record (the chapter names how the site originated)offtake / tender winterminated award / cancelledFIDCOD achievedCOD expected (dashed = still to run)on hold
2015201520202020202520252030203020352035OPEN DOOR — DEVELOPER-INITIATED SITES7SeasMed · 250 MW · Early Development · outlook: Prospective · COD expected 2031 · No auction award on record · open door7SeasMed2031e250 MWAgnes Romagna 1 · 200 MW · Early Development · outlook: Prospective · COD expected 2032 · No auction award on record · open doorAgnes Romagna 12032e200 MWKailia Energia · 1.17 GW · Proposed · developer's date 2032 · not forecast · No auction award on record · open doorKailia Energia2032e1.17 GWMedWind · 2.8 GW · Proposed · developer's date 2032 · not forecast · No auction award on record · open doorMedWind2032e2.8 GWTibula Energia · 975 MW · Proposed · developer's date 2033 · not forecast · No auction award on record · open doorTibula Energia2033e975 MWAgnes Romagna 2 · 400 MW · Early Development · outlook: Prospective · No auction award on record · open doorAgnes Romagna 2400 MWBarium Bay · 1.11 GW · Early Development · outlook: Prospective · No auction award on record · open doorBarium Bay1.11 GWEnergia Wind 2020 Rimini · 330 MW · Proposed · No auction award on record · open doorEnergia Wind 2020 Rimini330 MWIchnusa Wind Power · 504 MW · Proposed · No auction award on record · open doorIchnusa Wind Power504 MWNereus · 1.8 GW · Proposed · No auction award on record · open doorNereus1.8 GWNora Energia 1 · 795 MW · Proposed · No auction award on record · open doorNora Energia 1795 MWNora Energia 2 · 600 MW · Proposed · No auction award on record · open doorNora Energia 2600 MWOdra Energia · 1.3 GW · Proposed · No auction award on record · open doorOdra Energia1.3 GWUNCLASSIFIED — ORIGINATION NOT YET ESTABLISHEDCivitavecchia Divento · 540 MW · Proposed · No auction award on record · origination unclassifiedCivitavecchia Divento540 MWManfredonia · 1.02 GW · Proposed · No auction award on record · origination unclassifiedManfredonia1.02 GWMinervia Energia · 675 MW · Proposed · No auction award on record · origination unclassifiedMinervia Energia675 MWOlbia Divento · 1 GW · Proposed · No auction award on record · origination unclassifiedOlbia Divento1 GWGSE REVERSE AUCTION, OFFSHORE WIND CONTINGENT (DM 2… · 2016Beleolico (Taranto Offshore) · 30 MW · Operational · COD 2022 · Rounds: it-gse-asta-2016Beleolico (Taranto Offshore)202230 MW