Odra Energia

Located in the Ionian Sea off Lecce, southeastern Puglia. Will produce ~4 TWh/year, enough for 1.1 million homes.

Technology
Capacity 1,300 MW  Turbines 87  Foundation Floating 
Site & conditions
Site rights Not established we have not found a document granting or refusing rights over this seabed — a gap in our research, not a finding about the project 
Water depth 100–200 m  Distance from shore 12 km  Wind speed 7.7 m/s @ 150 m 
Revenue & grid
Offtake
Grid No agreement 
Schedule
FID Not taken
COD · developer

Delivery outlook not forecast

We don't put a delivery estimate on this project yet. No authority has granted rights to this site, so there is nothing to date a schedule from. That changes the moment the seabed is awarded, a consent application is filed, or the project is named in an auction.

Revenue & offtake route to market — open

No offtake secured — route to market open
The routes describe what exists in this market — not a prediction of which the project will take.
Next visible round · from the auction calendar
Italy first dedicated offshore auction (FER2 offshore contingent)
expected 2027 · planned · the round’s published documents do not name this project
stated by industry at Seanergy (May 2026) after informal MASE–Commission talks — strike-price revision by end-2026, auction "at the latest in 2027"; no MASE notice

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageProposed
Offshore constructionnot started
Expected start of operationnot stated

Sources & verification

1/15 fields verified · rests on 6 sources (2 primary) · ◆ 4 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator2
[1]
Nadara2024-01-15◆ Odra floating offshore wind project: Env…
“about 1,300 megawatts (MW) ... 90 floating wind turbines ... about 4 TWh/year ... more than 4 billion euros ... off the southern coast of the province of Lecce ... floating platforms ... first product…”
supportsTurbinesTotal capacityFoundation
[2]
Odra Energia (project website)2024-11◆ Il parco - Odra Energia
“747 MW ... 43 floating turbines ... 2,3 TWh ... 100 m e 200 m circa ... 16 a 24 km offshore ... between Santa Cesarea Terme and Santa Maria di Leuca ... galleggianti (floating platforms) ... VIA depos…”
supportsConsentTurbinesTotal capacityFoundationStatus+2 more
Auction pipeline1
[6]
reNEWS2026-05-20◆ renews-seanergy-fer2-strike-2026-05
Press report — cited, not quoted; read it at the source link.
supportsItaly first dedicated offshore auction (FER2 offshore contingent)
Trade press3
[3]
offshoreWIND.biz2025-11-28◆ Nadara acquires BlueFloat JV stakes in 1…
Press report — cited, not quoted; read it at the source link.
supportsoperator
[4]
4C Offshore2026-07-02
Press report — cited, not quoted; read it at the source link.
supportsCoordinates
[5]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed