Beleolico (Taranto Offshore)

Located in the external roadstead of the Port of Taranto, Apulia. Turbines span 0.1-2.5 km from shore.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2014’15’16’17’18’19’20’21’22’23’24’25’26View the source for Consent grantedConsent granted Jun 2013 View the source for Final investment decisionFinal investment decision Feb 2019 View the source for Offshore constructionOffshore construction Sep 2021 View the source for First powerFirst power Jun 2022 View the source for Commercial operationCommercial operation 2022-Q2 No origination on record — who held the site before the first recorded deal is not known; shown as a gap, never guessed. UNRECORDEDBelex Holding (Belenergia Group) → Renexia — 100.0% ACQUISITIONTODAYBelex Holding (Belenergia Group) Belex Holding Belex Holding not among today’s recorded owners — no sale recordedRenexia SpA — 100% today · operator Renexia Renexia 100%Belex Holding (Belenergia Group) → Renexia — 100.0% 100%
Dashed tick marks today (9 Sep 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake contract duration and price levels · money of the day

30 MW contracted — feed-in tariff
Feed-in tariff · GSE reverse auction, offshore wind contingent (DM 23 giugno 2016)
Price€161.7/MWh ·Capacity30 MWAwardedDec 2016
Term25 yrs

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2022-Q2
Offshore construction2021-09 → 2022-Q2
Construction ports
PortPort of Taranto ·installation · quay 9995 m · draft 15.5 m

Sources & verification

16/16 fields verified · rests on 12 sources (7 primary) · ◆ 6 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator9
[1]
Offshore Wind Biz2022-04-22◆ First Mediterranean Offshore Wind Farm U…
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityTotal capacityCoordinates
[2]
Offshore Wind Biz2016-12-28◆ Italy Approves Fixed Price Tariff for Fi…
Press report — cited, not quoted; read it at the source link.
supportsMechanismStrike / priceDetail
[3]
Natixis CIB2019-02-26◆ Beleolico, first offshore windfarm in th…
"The approximately EUR 82 million debt package arranged by Natixis consists of a term loan, a VAT financing and a stand-by facility. The Borrower, Beleolico Srl, is owned by Renexia Spa, the renewable…
supportsFinal investment decisionWater depth
[5]
Offshore Wind Biz2021-09-24
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionSite rightsFoundationinstallation
[6]
Offshore Wind Biz2022-05-12
Press report — cited, not quoted; read it at the source link.
supportsStatusConnection point
[7]
Toto Holding2022-04-21
“The first offshore wind farm in the Mediterranean was inaugurated today in Taranto. This is Beleolico.”
supportsBackground
[8]
Renexia SpA2024
“The first marine wind farm in the Mediterranean. 10 turbines with 30MW installed power. Renexia S.p.A., subject to the management and coordination of toto holding s.p.a.”
supportsBackground
[9]
Renexia2022◆ Beleolico - Renexia
supportsoperator
[12]
Renexia S.p.A.2026-07-21◆ Beleolico - Renexia
“RENEXIA Società per Azioni (joint stock company) subject to the management and coordination of toto holding s.p.a. – Nominal capital 5.000.000 € fully paid up – VAT and Tax Code and company registry n…”
supports↳ parents
Auction results1
[13]
Gestore dei Servizi Energetici (GSE)2016-12-22◆ gse-graduatoria-eolico-offshore-2016
"Procedura competitiva d'Asta al ribasso ai sensi dell'art. 12 del D.M. 23 giugno 2016 ... Codice identificativo della Procedura d'Asta: EOLF_PA2016" and the single ranking row "1 FER102027 IM_0603701…
supportsFeed-in tariff · GSE reverse auction, offshore wind contingent (DM 23 giugno 2016)
Trade press2
[10]
IWR Online2022-06-15
“The Beleolico offshore wind farm has now reached a milestone in early June 2022, feeding the first wind power into the Italian grid, according to European grid operator (Entso-E) data.”
supportsFirst powerCommercial operation
[11]
Il Post2022-04-21
“La prima autorizzazione ministeriale risale al 13 giugno 2013, con la pubblicazione in Gazzetta ufficiale di un decreto del ministero dei Trasporti e delle Infrastrutture”
supportsConsentConsent granted