Beleolico (Taranto Offshore)
Located in the external roadstead of the Port of Taranto, Apulia. Turbines span 0.1-2.5 km from shore.
Status
Operationallifecycle stage
Ownership
RSRenexia SpA — 100% ◆
Location
Ionian Sea
Technology
Capacity
30 MW ◆
Turbines
10 × 3 MW ◆
Model
Mingyang Myse3 0-135 ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Water depth
4–18 m ◆
Revenue & grid
Offtake
FiT · €161.7/MWh ◆
Grid
Not recorded ◆
Connection
Torre Triolo substation ◆
Schedule
FID
Feb 2019 ◆
COD
2022-Q2 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Acquisition ·
Belex Holding (Belenergia Group) → Renexia 100%
- Stake
- 100%
- Consideration
- not disclosed
- Project stage
- consented
Renexia S.p.A. (a subsidiary of TOTO Holding Group), through its subsidiary Renexia Wind Offshore S.p.A., acquired 100% of the share capital of Beleolico S.r.l. from Belex Holding S.A., a vehicle of the Belenergia Group. Beleolico S.r.l. held the development rights, permits, and planning consents for Italy's first offshore wind farm — a 30 MW (10 × 3 MW) fixed-bottom near-shore array in front of the Port of Taranto in the Gulf of Taranto. The project had obtained a 25-year seabed concession lease via a 2016 Italian maritime authority auction. The date of the acquisition is not publicly confirmed; Renexia first proposed the project in 2008 and the acquisition appears to have been completed after the 2016 concession award and before the financial close in 2019-2020. The acquisition was for a consented, fully permitted project (all permits in place at deal time). Renexia invested approximately EUR 80 million to construct the project; the acquisition price was separate and undisclosed. The project achieved financial close (EUR 82m project financing from Natixis) in 2020 and was inaugurated in April 2022. This is the Mediterranean's first offshore wind farm.
Evidence
- totoholding.it — Toto Group to construct the first wind farm offshore the Mediterranean ↗ ◆ held
- home.cib.natixis.com — Beleolico, first offshore windfarm in the Mediterranean Sea - Natixis CIB ↗ ◆ held
- renexia.it — Beleolico ↗ ◆ held
From Hafrok’s transactions record
Dashed tick marks today (9 Sep 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Revenue & offtake contract duration and price levels · money of the day
30 MW contracted — feed-in tariff
● Feed-in tariff · GSE reverse auction, offshore wind contingent (DM 23 giugno 2016)
Price€161.7/MWh ·Capacity30 MWAwardedDec 2016Term25 yrs
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2022-Q2
Offshore construction2021-09 → 2022-Q2
Construction ports
PortPort of Taranto ◆·installation · quay 9995 m · draft 15.5 m
Sources & verification
16/16 fields verified · rests on 12 sources (7 primary) · ◆ 6 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator9
[1]
[2]
[3]
Natixis CIB2019-02-26◆ Beleolico, first offshore windfarm in th…
"The approximately EUR 82 million debt package arranged by Natixis consists of a term loan, a VAT financing and a stand-by facility. The Borrower, Beleolico Srl, is owned by Renexia Spa, the renewable…
supportsFinal investment decisionWater depth
[5]
[6]
[7]
[8]
[9]
[12]
Renexia S.p.A.2026-07-21◆ Beleolico - Renexia
“RENEXIA Società per Azioni (joint stock company) subject to the management and coordination of toto holding s.p.a. – Nominal capital 5.000.000 € fully paid up – VAT and Tax Code and company registry n…”
supports↳ parents
Auction results1
[13]
Gestore dei Servizi Energetici (GSE)2016-12-22◆ gse-graduatoria-eolico-offshore-2016
"Procedura competitiva d'Asta al ribasso ai sensi dell'art. 12 del D.M. 23 giugno 2016 ... Codice identificativo della Procedura d'Asta: EOLF_PA2016" and the single ranking row "1 FER102027 IM_0603701…
supportsFeed-in tariff · GSE reverse auction, offshore wind contingent (DM 23 giugno 2016)
Trade press2
[10]
IWR Online2022-06-15
“The Beleolico offshore wind farm has now reached a milestone in early June 2022, feeding the first wind power into the Italian grid, according to European grid operator (Entso-E) data.”
supportsFirst powerCommercial operation
[11]
Il Post2022-04-21
“La prima autorizzazione ministeriale risale al 13 giugno 2013, con la pubblicazione in Gazzetta ufficiale di un decreto del ministero dei Trasporti e delle Infrastrutture”
supportsConsentConsent granted