Market profile

Ireland

emerging * buildout: pending risk: pending outlook: pending

* maturity derived from capacity data; full assessment pending.

0
GW operational
0
GW in construction
4.7
GW pipeline
12
projects
Advanced Development · 3.5 GW (4)Early Development · 1.2 GW (2)Proposed · 3.1 GW (3)On Hold · 0.5 GW (1)
Progress to target
0%
0 GW operational of 37 GW by 2050
Future Framework for Offshore Renewable Energy
Next auction round
South Coast DMAP Area B (Lí Ban)
· tender · planned
1.5 GW offered
full auction outlook ↓

Assessment

Assessment pending

This market has a derived snapshot above but no in-depth assessment yet. Authored coverage rolls out market by market; the data here is live in the meantime.

State of the market

as of 2026-09-09
41%
of GW sited through contested rounds
delivered (COD actuals)unweighted dated pipeline (building / contracted / early)Expected Buildout (confidence-weighted)national target (range)superseded targettoday
010203040GW202520302035204020452050todayEXPECTED BUILDOUT → 3.5 GW+ early → 3.4+ contracted → 3.0+ building → 0.0 GW0.0 GW operational37 GW target · 2050

Teal line = the Hafrok Expected Buildout (confidence-weighted): 5.2 GW of live pipeline weights to 3.5 GW expected to complete, timed by each project's COD distribution (mass beyond 2051 not drawn). Bands are the unweighted dated pipeline — the Expected Buildout also models on-hold and undated projects, so it can sit above them. 1.3 GW of pipeline has no dated COD and is not in the bands.

How this line is made

The Expected Buildout line answers one question: of the pipeline announced today, how much actually gets built, and when? It is not a scenario and not a target tracker — it is the database's live pipeline, passed through two filters measured from the industry's own delivery record.

Whether a project completes. Every project in development carries a completion weight, banded Delivering / Expected / Prospective / Fragile. A proposal — a site where no authority has yet granted rights — carries none and sits outside this line entirely; it is listed, not counted. The starting point is the historical completion rate of its lifecycle stage — of projects that reached construction, 97% delivered; financed but not yet building, 92%; consented without financing, 75%; early development, 61%; on hold, 15%. That base rate is then adjusted by what the project has actually secured (offtake, grid, consents, investment decision) and decays if a project sits quiet past its stage's normal dwell time.

When it delivers. Each project also carries a completion-date distribution — a shape, not a single year, right-skewed because offshore wind slips late far more often than it runs early. The peak sits on a rule-based expected date chained from the project's latest achieved milestone; the width of the late tail is fitted to how far past their announced dates real projects actually landed: builders slip tight (68% on time, n=158), financed projects tighter still (72%, n=101), consented-only projects carry the fat tail — 25% land three or more years late (n=133). A stated date faster than any comparable project has ever achieved is floored to the achievable window and flagged, never taken at face value.

The line is the sum, across every live project, of capacity × completion weight × the probability it delivers in each year. For projects already under construction, a share of expected capacity is counted at first power — turbines start generating before a wind farm is fully commissioned — so a market's chart can show capacity arriving a year before a project's stated completion date. Delivered history is metered fact; the line inherits every assumption above and nothing else.

Honest limits. The weights are calibrated on a fleet whose failures have so far been overwhelmingly pre-financing — completion rates after FID rest on a record with few failures, so they are ceilings, not guarantees. The slip fitted on consented projects is the loosest (the "three or more years late" bucket spans many years). Policy shocks arrive faster than base rates move — the weights see a stop-work order only as its lifecycle consequences accrue. And the line redistributes as the database learns: it is re-derived on every data refresh, not frozen.

Full per-project workings — each project's weight, band, expected date and distribution — are on its project page. Calibration v2.0-phase0 · generated 2026-09-09; every figure above is read from the generated calibration file, never typed.

Auction outlook

forecast · 2 rounds tracked
Seabed leaseOfftake awardIntegrated tenderscheduled — bar spans the expected windowplanned (indicative)postponed / suspendedno date yet (off-axis)
202720282029today
NO DATE YETSouth Coast DMAP Area B (Lí Ban) · plannedIreland further DMAP auctions (remaining SC sites +… · planned
Integrated tender South Coast DMAP Area B (Lí Ban) planned
What the date rests on — indicative

Next plan-led South Coast DMAP auction after Tonn Nua; the most advanced of the 3 remaining sites (grid work advanced). ~1.4-2 GW is an EirGrid site-potential estimate (secondary), not a confirmed auction volume. No official date.

Integrated tender Ireland further DMAP auctions (remaining SC sites + National DMAP) planned
What the date rests on — indicative

The other 2 South Coast DMAP sites ("over the coming years") plus the National DMAP (announced under development Sept 2025) toward the 20 GW-by-2040 ambition. No dates, no volumes, no round names.

Origination ladder

settled rounds → projects
Seabed leaseOfftake awardIntegrated tenderbirth award (colour = round type)no auction award on record (the chapter names how the site originated)offtake / tender winterminated award / cancelledFIDCOD achievedCOD expected (dashed = still to run)on hold
202520252030203020352035OPEN DOOR — DEVELOPER-INITIATED SITESOriel Wind Farm · 375 MW · Early Development · outlook: Prospective · COD expected 2028 · No auction award on record · open doorOriel Wind Farm2028e375 MWArklow Bank Wind Park Phase 2 · 800 MW · Early Development · outlook: Prospective · No auction award on record · open doorArklow Bank Wind Park Phase 2800 MWClogherhead Offshore Wind Farm · 500 MW · On Hold · outlook: Fragile · No auction award on record · open doorClogherhead Offshore Wind Fa…500 MWEmerald · 1.3 GW · Proposed · No auction award on record · open doorEmerald1.3 GWInis Ealga Marine Energy Park · 1 GW · Cancelled · No auction award on record · open doorInis Ealga Marine Energy Park1 GWWestern Star · 1.35 GW · Proposed · No auction award on record · open doorWestern Star1.35 GWUNCLASSIFIED — ORIGINATION NOT YET ESTABLISHEDBore Array · 500 MW · Proposed · No auction award on record · origination unclassifiedBore Array500 MWORESS 1 (IRELAND'S FIRST OFFSHORE AUCTION) · 2023Codling Wind Park · 1.3 GW · Advanced Development · outlook: Expected · COD expected 2030 · Rounds: ie-oress-1-2023Codling Wind Park2030e1.3 GWDublin Array · 824 MW · Advanced Development · outlook: Expected · COD expected 2030 · Rounds: ie-oress-1-2023Dublin Array2030e824 MWNorth Irish Sea Array (NISA) · 500 MW · Advanced Development · outlook: Expected · Rounds: ie-oress-1-2023North Irish Sea Array (NISA)500 MWSceirde Rocks · 450 MW · Cancelled · Rounds: ie-oress-1-2023 (terminated)Sceirde Rocks450 MWORESS 2.1 (TONN NUA, SOUTH COAST) · 2025Tonn Nua · 900 MW · Advanced Development · outlook: Expected · COD expected 2035 · Rounds: ie-oress-2-1-tonn-nua-2025Tonn Nua2035e900 MW