Oriel Wind Farm
Located 6-22 km off coast of Dundalk, County Louth. Ireland's most advanced Phase 1 project — originally conceived in the 2000s.
Status
Early Developmentlifecycle stage
ProspectiveHafrok completion outlook
Ownership
OWOriel Windfarm Limited — 100% ◆
Location
Irish Sea
Technology
Capacity
375 MW ◆
Turbines
25 × 15 MW ◆
Foundation
Monopile ◇
Site & conditions
Site rights
Application filed 2024-05 ◆
Water depth
5–25 m ◇
Distance from shore
6 km ◇
Wind speed
9.7 m/s @ 150 m ≈
Revenue & grid
Offtake
—
Grid
Offered ◇
Connection
EirGrid Full Connection Offer (FCO) in place; validity extended … ◇
Schedule
FID
Not taken
COD · announced
2028 ◆
COD · Hafrok
2034 expected
Delivery outlook modelled by Hafrok · calibrated on delivered projects
2034
expected year of commercial operation
The developer says 2028; Hafrok expects 2034 — 6 years later.
Chance of delivery
≈62%
estimated chance this project reaches commercial operation
Early Development projects complete ≈61% of the time on Hafrok's record. A secured offtake contract lifts this one slightly; a market with a thinner delivery record and technical complexity pull a little the other way.
COD outlook
If it completes, when — Hafrok’s probability by year (teal) · the developer’s COD guidance, by date stated (ink)
| Year | Probability |
|---|---|
| 2033 | 14.1% |
| 2034 (expected) | 28.0% |
| 2035 | 22.7% |
| 2036 | 14.6% |
| 2037 | 8.7% |
| 2038 | 5.1% |
| 2039 | 3.1% |
| 2040 | 1.8% |
| 2041 | 1.1% |
| 2042 | 0.7% |
| Stated | Announced COD |
|---|---|
| 2026-04-15 | 2029 |
| 2026-06-16 | 2028 |
How Hafrok got this date
1
No dated milestone yet
Nothing is consented or financed with a date, so the estimate starts from today (
2026), adds the time similar projects (in developing offshore-wind markets) took from consent to operation, plus an allowance for obtaining consent.2
Earliest credible date
Typical consent-to-operation time plus allowances means commercial operation before
2034 is not credible.3
Result
Expected commercial operation
2034, likely range 2034–2039 (the middle half of outcomes for similar projects). With no milestone to build from, the earliest credible date is the estimate, with a deliberately wide range.4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Early Development projects that went on to complete — ≈61%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). About three in four early-stage projects with a final outcome went on to operate — a record from an easier era. Most of today's early pipeline is still unresolved, so the estimate discounts it. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈62%, which rates it
Prospective on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
JV formation · 2019-01
Parkwind · ESB stake not disclosed
- Stake
- not disclosed
- Consideration
- not disclosed
- Announced
- 2019-01
- Project stage
- early development
Parkwind NV and ESB (Electricity Supply Board, Ireland's state energy company) announced a 50/50 joint venture agreement on 22 January 2019 to co-develop the Oriel offshore wind farm (up to 375 MW) and the neighbouring Clogherhead project off the Louth coast. Under the deal, ESB would acquire up to a 35% stake in Oriel (which Parkwind had originally entered in 2017), with the companies also exchanging stakes in Clogherhead. The JV structure settled at an effective 50/50 co-development arrangement for Oriel. ESB brought its Clogherhead foreshore licence rights; Parkwind brought the Oriel development platform. Deal value undisclosed. Project was at early development stage. Note: Parkwind was subsequently acquired by JERA in 2023 (see companion record below).
Evidence
- esb.ie — Parkwind and ESB to develop two offshore wind farms at Oriel and Clogherhead ↗ 2019-01 ◆ held
- offshoreWIND.biz — Ireland: Parkwind, ESB to Jointly Develop Oriel and Clogherhead OWFs ↗ 2019-01 ◆ held
- parkwind.eu — JERA Nex bp Parkwind | Parkwind and ESB to develop two offshore wind… ↗ 2019-01 ◆ held
From Hafrok’s transactions record
Acquisition · 2023-03
Virya Energy → JERA 100%
- Stake
- 100%
- Consideration
- not disclosed
- Announced
- 2023-03
- Closed
- 2023-07
- Project stage
- early development
JERA Co., Inc. acquired 100% of the shares of Parkwind NV from Virya Energy NV, announced 22 March 2023 and closed 26 July 2023. The Parkwind platform transaction implied an equity value of approximately EUR 1.55 billion for the entire Parkwind portfolio, including four operational Belgian projects (771 MW combined), Arcadis Ost 1 in Germany (257 MW), and a 4.5+ GW development pipeline spanning Belgium, Germany, Ireland and other markets. The Oriel and Irish pipeline assets formed only a fraction of the total portfolio value. The portfolio-level record is in Batch 3 (JERA/Parkwind). Following the acquisition, Parkwind became wholly owned by JERA and rebranded as part of JERA Nex. ESB's 50% JV interest in Oriel was unaffected by the transaction.
Evidence
- offshoreWIND.biz — BREAKING: JERA Buys Parkwind, Belgium's Leading Offshore Wind Developer ↗ 2023-03 ◆ held
- offshoreWIND.biz — JERA Completes Acquisition of Belgium's Leading Offshore Wind Developer ↗ 2023-03 ◆ held
- parkwind.eu — JERA Nex bp Parkwind | JERA and Virya Energy reach an agreement for… ↗ 2023-03 ◆ held
From Hafrok’s transactions record
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced COD: pulled forward -1.0 yr (first announced 2029) · the full guidance history is in the delivery chart above
Revenue & offtake route to market — open
No offtake secured — route to market open
The routes describe what exists in this market — not a prediction of which the project will take. Timing math for the auction gate lives in the delivery outlook above.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageEarly Development
Offshore constructionnot started
Expected start of operation2028
Sources & verification
7/17 fields verified · rests on 8 sources (6 primary) · ◆ 7 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator5
[1]
Minister for the Environment, Climate and Communications (Ireland)2022-12-23◆ 2022 MAC 001 Oriel
“Maritime Area Consent No. 2022-MAC-001. Holder: Oriel Windfarm Limited, Company Registration Number: 318186. Commencement Date: 23 December 2022. Permitted Maritime Usage: The construction and operati…”
supportsoperator
[2]
An Coimisiun Pleanala2024-05-24◆ 319799 | An Coimisiún Pleanála -
“Case 319799 (OA15.319799): Applicant - Oriel Windfarm Limited; application lodged 24/05/2024; further information submitted 15/01/2026; decision due 21/09/2026. Proposed development known as Oriel Win…”
supportsConsentSite rightsConsent applied
[3]
JERA Nex2024-05◆ Casibom Giriş 2026 | Casibom Güncel Resm…
“Oriel, which is being developed by JERA Nex through its wholly owned subsidiary Parkwind, and ESB ... 25 wind turbines, with a combined generating capacity of up to 375 megawatts (MW) ... Maritime Are…”
supportsCommercial operationCOD historyTurbinesUnit capacityTotal capacity
[7]
JERA Nex bp / Oriel Windfarm Limited2024-05◆ JERA Nex bp Oriel windfarm | Home
“The project is jointly developed by Parkwind NV and ESB. The Oriel windfarm will have a capacity of up to 375 MW and is located in the Irish Sea off the coast of County Louth, to the East of Dundalk B…”
supportsFoundationWater depthDistance from shoreCoordinates
[9]
JERA Nex2024-05◆ Casibom Giriş 2026 | Casibom Güncel Resm…
“Oriel, which is being developed by JERA Nex through its wholly owned subsidiary Parkwind, and ESB.”
supports↳ parents
Auction pipeline1
[10]
Government of Ireland (gov.ie)2024-05◆ govie-future-framework
Future Framework — plan-led DMAP auctions; South Coast DMAP sites beyond Tonn Nua to be brought to market.
supportsSouth Coast DMAP Area B (Lí Ban)
Trade press2
[5]
Commission for Regulation of Utilities (CRU)◆ Offshore Grid Connection | CRU.ie
“The CRU decided to extend the FCO validity period for Oriel Windfarm, North Irish Sea Array, Dublin Array, Codling Wind Park, and Arklow Bank Wind Park 2 by two years ... The new longstop date for the…”
supportsStatusConnection point
[8]