Sceirde Rocks
Status
Cancelledlifecycle stage
Ownership
CGCorio Generation — 100% ◇
Location
Northeast Atlantic
Technology
Capacity
450 MW ◇
Turbines
30 ◇
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Origination
ORESS 1 (Ireland's first offshore auction) · 2023 ·
Water depth
9–35 m ≈
Distance from shore
6 km ◇
Wind speed
10.5 m/s @ 150 m ≈
Revenue & grid
Offtake
—
Grid
—
Schedule
COD
—
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageCancelled
Offshore constructionnot started
Expected start of operationnot stated
Sources & verification
0/11 fields verified · rests on 5 sources
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press5
[1]
[2]
The Wind Power2025
Press report — cited, not quoted; read it at the source link.
supportsDistance from shoreCoordinates
[3]
[4]
[5]