Dublin Array

Located on Kish and Bray Banks, approximately 10 km off Dublin/Wicklow coast. 39-50 turbines with tip heights of 270-310 metres.

Status
Advanced Developmentlifecycle stage
ExpectedHafrok completion outlook
Ownership
RIRWE Renewables Ireland — 50% 
SLSaorgus Energy Ltd — 50% 
Location
Ireland
Irish Sea
Technology
Capacity 824 MW 
Turbines
Foundation
Site & conditions
Site rights Seabed rights held 
Origination ORESS 1 (Ireland's first offshore auction) · 2023 ·
Water depth 4–32 m  Wind speed 9.6 m/s @ 150 m 
Revenue & grid
Offtake CfD · ORESS 1  Grid Offered · 2025-11-10  Connection Phase 1 ORESS project on the EirGrid grid-connection pathway; … 
Schedule
FID Not taken
COD · announced 2030 
COD · Hafrok 2030 expected

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2030
expected year of commercial operation
Chance of delivery
≈80% estimated chance this project reaches commercial operation
Advanced Development projects complete ≈75% of the time on Hafrok's record. A secured offtake contract puts this one well above that; a market with a thinner delivery record, its size and technical complexity weigh only slightly against it.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2029: 3.9% (conditional on completion) 2030: 50.2% (conditional on completion) 2031: 29.5% (conditional on completion) 2032: 10.6% (conditional on completion) 2033: 3.8% (conditional on completion) 2034: 1.4% (conditional on completion) 2035: 0.6% (conditional on completion)2026now202720282029203050%20312032203320342035 Developer-announced COD: 2030 — in line with Hafrok’s expected year ANNOUNCED = EXPECTED 2030
COD probability by year, conditional on completion
YearProbability
20293.9%
2030 (expected)50.2%
203129.5%
203210.6%
20333.8%
20341.4%
20350.6%
How Hafrok got this date
1
Starting point: the last dated milestone
Consent granted in 2026. From there Hafrok adds how long similar projects (in developing offshore-wind markets) took to reach commercial operation, measured on projects that have delivered.
2
Typical timing
Starting point plus the typical remaining time gives a middle estimate of 2031; the faster quarter of similar projects would be done by 2029, the slower quarter not until 2031.
3
Result
Expected commercial operation 2030, likely range 2029–2031 (the middle half of outcomes for similar projects). The developer's announced date falls inside that likely range, so the announced date is adopted.
4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Advanced Development projects that went on to complete — ≈75%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Consented projects have historically completed at very high rates, but the 2023–25 downturn showed consented-but-unfinanced projects can still fail — the estimate holds back for the offtake and financing gates still ahead. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈80%, which rates it Expected on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2024’25’26’27’28’29’30Developer-announced COD: 2030 announced COD 2030ORESS 1 (Ireland's first offshore auction) — awarded to RWE (with Saorgus Energy)ORESS 1 (Ireland's first offshore auction) Jun 2023 · auction recordView the source for Consent appliedConsent applied Feb 2025 Commercial operation 2030 ·Hafrok expectedORESS 1 (Ireland's first offshore auction) — awarded to RWE (with Saorgus Energy) 2023-06 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDSaorgus Energy → RWE — 50.0% 2018-03 JV ENTRYTODAYRWE Renewables Ireland — 50% today · operator RWE RWE 50%Saorgus Energy Ltd — 50% today Saorgus Energy Saorgus Energy 50%ORESS 1 (Ireland's first offshore auction) — awarded to RWE (with Saorgus Energy) Transfer(s) not in Hafrok's record — shown as a gap, never guessed. Saorgus Energy → RWE — 50.0% 50%
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageAdvanced Development
Offshore constructionnot started
Expected start of operation2030

Sources & verification

5/12 fields verified · rests on 9 sources (9 primary) · ◆ 4 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[12]
Department of the Environment, Climate and Communications (DECC)2024◆ 5612b93e F616 4881 8194 250656f0cea1
“Issue Full Phase 1 Connection Offers (including merchant projects) Q4 2024.”
supportsStatusConnection point
Operator4
[5]
EirGrid2023-06-14◆ ORESS 1 Final Auction Results (OR1FAR)
"ORESS1-0310 Kish Offshore Wind Limited and Bray Offshore Wind Limited Dublin Array 824" [MW listed as Successful Applicant, Table 3]. "Offshore Wind Average Price €86.05/MWh" (GWh-weighted average …
supportsTotal capacityMechanismDetail
[7]
RWE AG2023-05-11◆ RWE delighted with provisional Contract …
“RWE is developing Dublin Array in partnership with Saorgus Energy, both partners hold a 50 percent share in the project. … The provisional offer is for RWE's Dublin Array Offshore Wind Farm, which wou…”
supportsoperatorowner
[9]
An Coimisiún Pleanála2025-02-28◆ 321992 | An Coimisiún Pleanála -
“Case Reference: OA06D.321992. Applicant: Bray Offshore Wind Ltd and Kish Offshore Wind Ltd. Date Lodged: 28/02/2025. Decision Due Date: 09/09/2025. Case Type: Marine Development - Application.”
supportsConsentConsent applied
[16]
RWE AG2025-02-26
“Subject to obtaining planning permission and a financial investment decision, construction of Dublin Array could begin as early as 2027, with operations projected to start in 2030.”
supportsCommercial operation
Trade press3
[13]
Global Energy Monitor2026
supportsTotal capacityCoordinates
[14]
GEBCO Compilation Group2020
supportsWater depth
[15]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
supportsTotal capacityWater depthCoordinates