Codling Wind Park

Located 13-22 km off Wicklow coast. Will deliver over 26% of Ireland's 2030 grid-connected offshore wind target.

Status
Advanced Developmentlifecycle stage
ExpectedHafrok completion outlook
Ownership
EDF Renewables — 50% 
FOFred. Olsen Seawind — 50% 
Location
Ireland
Irish Sea
Technology
Capacity 1,300 MW  Turbines 75 
Foundation
Site & conditions
Site rights Seabed rights held 
Origination ORESS 1 (Ireland's first offshore auction) · 2023 ·
Water depth 10–25 m  Distance from shore 13 km  Wind speed 9.8 m/s @ 150 m 
Revenue & grid
Offtake CfD · ORESS 1 · €89.82/MWh  Grid Offered  Connection EirGrid Full Connection Offer (FCO) issued; connection point at … 
Schedule
FID Not taken
COD · announced 2030 
COD · Hafrok 2030 expected

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2030
expected year of commercial operation
Chance of delivery
≈79% estimated chance this project reaches commercial operation
Advanced Development projects complete ≈75% of the time on Hafrok's record. A secured offtake contract lifts this one above that; a market with a thinner delivery record, its size and technical complexity pull the other way.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2029: 3.9% (conditional on completion) 2030: 50.2% (conditional on completion) 2031: 29.5% (conditional on completion) 2032: 10.6% (conditional on completion) 2033: 3.8% (conditional on completion) 2034: 1.4% (conditional on completion) 2035: 0.6% (conditional on completion)2026now202720282029203050%20312032203320342035 Developer-announced COD: 2030 — in line with Hafrok’s expected year ANNOUNCED = EXPECTED 2030
COD probability by year, conditional on completion
YearProbability
20293.9%
2030 (expected)50.2%
203129.5%
203210.6%
20333.8%
20341.4%
20350.6%
How Hafrok got this date
1
Starting point: the last dated milestone
Consent granted in 2026. From there Hafrok adds how long similar projects (in developing offshore-wind markets) took to reach commercial operation, measured on projects that have delivered.
2
Typical timing
Starting point plus the typical remaining time gives a middle estimate of 2031; the faster quarter of similar projects would be done by 2029, the slower quarter not until 2031.
3
Result
Expected commercial operation 2030, likely range 2029–2031 (the middle half of outcomes for similar projects). The developer's announced date falls inside that likely range, so the announced date is adopted.
4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Advanced Development projects that went on to complete — ≈75%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Consented projects have historically completed at very high rates, but the 2023–25 downturn showed consented-but-unfinanced projects can still fail — the estimate holds back for the offtake and financing gates still ahead. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈79%, which rates it Expected on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2024’25’26’27’28’29’30Developer-announced COD: 2030 announced COD 2030ORESS 1 (Ireland's first offshore auction) — awarded to Fred. Olsen Seawind + EDF RenewablesORESS 1 (Ireland's first offshore auction) Jun 2023 · auction recordView the source for Consent appliedConsent applied Sep 2024 Commercial operation 2030 ·Hafrok expectedORESS 1 (Ireland's first offshore auction) — awarded to Fred. Olsen Seawind + EDF Renewables 2023-06 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDHazel Shore (Johnny Ronan / Ronan Group) → EDF Renewables — 50.0% 2020-02 JV ENTRYTODAYFred. Olsen Seawind — 50% today · developer Fred. Olsen Seawind Fred. Olsen Seawind 50%Hazel Shore (Johnny Ronan / Ronan Group) Hazel Shore Hazel Shore exited 2020-02EDF Renewables — 50% today · operator EDF Renewables EDF Renewables 50%ORESS 1 (Ireland's first offshore auction) — awarded to Fred. Olsen Seawind + EDF Renewables Transfer(s) not in Hafrok's record — shown as a gap, never guessed. Hazel Shore (Johnny Ronan / Ronan Group) → EDF Renewables — 50.0% 50%
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageAdvanced Development
Offshore constructionnot started
Expected start of operation2030

Sources & verification

4/13 fields verified · rests on 10 sources (4 primary) · ◆ 4 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[12]
Department of the Environment, Climate and Communications (DECC)2024◆ 5612b93e F616 4881 8194 250656f0cea1
“Issue Full Phase 1 Connection Offers (including merchant projects) Q4 2024.”
supportsStatusConnection point
Operator3
[5]
EirGrid2023-06-14◆ ORESS 1 Final Auction Results (OR1FAR)
"Codling Wind Park Limited Codling Wind Park 1,300" [MW] listed as a Successful Applicant (Table 3); "Offshore Wind Average Price €86.05/MWh" (weighted average of all successful offers, Table 2).
supportsTotal capacity
[7]
An Coimisiún Pleanála2024-09-06◆ 320768 | An Coimisiún Pleanála -
“Case OA29N.320768 for Codling Wind Park, lodged 06/09/2024; case due to be decided by 01/04/2025; as of June 2026 remains undecided (developers requested to submit revised cumulative impact assessment…”
supportsConsentConsent applied
[9]
Bonheur ASA2023-08◆ Bonheur Q2 2023 Report Updated
"Codling Wind Park Ltd. (Ireland) has on 11th May 2023, received information on the final auction results from the auction administrator (Eirgrid) to the effect that Codling Wind Park Ltd. was a succe…
supportsoperatordeveloperMechanismStrike / priceDetail
Trade press5
[11]
Codling Wind Park (operator site)2024
"Subject to all necessary permits and consents being received, Codling Wind Park could begin construction in 2027. Construction is expected to take two to three years to complete." [Implies COD ~2029-…
supportsCommercial operation
[13]
Codling Wind Park2025
supportsTurbinesTotal capacityDistance from shore
[14]
Global Energy Monitor2026-07-02
supportsCoordinates
[15]
GEBCO Compilation Group2020
supportsWater depth
[16]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
supportsTurbinesTotal capacityWater depthDistance from shoreCoordinates