Hywind Scotland

Located 25km off Peterhead, Aberdeenshire. Spar-buoy floating foundations anchored in 95-129m water depth. Batwind battery storage system also installed.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record

6 dated milestones on the spine, each with its source · 2 recorded ownership deals from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓

Revenue & offtake contract terms, price levels and the route to market

the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓

Installation how the build is going · from sourced statements and Hafrok's registers

construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓

Sources & verification

Rests on 13 sources (9 primary) · ◆ 8 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator4
[1]
Marine Scotland2015-10-30◆ Hywind Scotland Pilot Park - Marine Lice…
“Subject to the conditions set out in the Marine Licence (05515/15/0) the Licensing Authority grant a licence under Part 4 of the Marine (Scotland) Act 2010 and under Part 4 of the Marine and Coastal A…”
supportsConsentDistance from shoreConsent appliedConsent granted
[2]
Marine Scotland2015-10-30◆ Hywind Scotland Pilot Park - Marine Lice…
“The Development will involve the installation of five 6 MW wind turbine generator units [...] with a draught of no less than 70 m to no more than 85 m and a rotor diameter of 154 m. [...] The Licensee…”
supportsTurbinesUnit capacityTotal capacityFoundationStatus+4 more
[16]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2479: Site Name "Hywind Scotland Pilot Park (Hywind 2) Demonstrator", Development Status "Operational", Installed Capacity 30 MWelec, Operator "Statoil"”
supportsRegister entry
[17]
Scottish Government Marine Directorate (MD-LOT)2026-08-23◆ Scottish MD-LOT marine projects register…
“Register row "Hywind Scotland Pilot Park" (key ml/hywind-scotland-pilot-park): Application stage "Post-consent", type "Renewables - Wind".”
supportsRegister entry
Operator4
[4]
Equinor (Statoil)2017-10-18◆ World's first floating wind farm has sta…
"Hywind Scotland, the first floating wind farm in the world, has started to deliver electricity to the Scottish grid. Today the First Minister of Scotland, Nicola Sturgeon, officially opens the wind f…
supportsFirst powerCommercial operation
[7]
Equinor2024-10-01◆ Hywind Scotland - the world’s first floa…
“Hywind Scotland is the world's first floating offshore wind farm. [...] 30 MW. [...] Water depth 95-120 m. [...] Average wave height 1.8 m. [...] Export cable approximately 30 km.”
supportsWater depth
[8]
Equinor2022-10-18◆ Equinor marks 5 years of operations at w…
“Hywind Scotland, the world's first floating offshore wind farm [...] achieving a capacity factor of 54% over its five years of operations.”
supportsBackground
[13]
Masdar2023
“Masdar has a 25 per cent stake in the 30MW project, along with lead operator Equinor, which owns 75 per cent.”
supportsoperatorco-owner
Trade press5
[3]
offshoreWIND.biz2015-11-03◆ Statoil Sets Aside EUR 214 Million for H…
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionWater depth
[9]
offshoreWIND.biz2017-05-29
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionSite rightsassembly and tow-out
[10]
Renewable Energy Foundation2021-08-01
“two floating offshore wind farms, Hywind and Kincardine, which receive 3.5 ROCs per MWh”
supportsMechanismDetail
[14]
offshoreWIND.biz2017-07-24
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionSite rightsModel
[15]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Early access

Follow the offshore wind projects that matter to you.

Hafrok's data and analysis. Free while in early access.

  • The data, in full: the project database as an Excel workbook, Hafrok's expected delivery outlook on every project still to build, the full project records, the transaction database and the developer profiles
  • Hafrok Monitor: follow projects, developers or countries, and Hafrok Monitor mails you what moved on your list, with the source and the date: every Monday morning, or as it happens
  • Hafrok Commentary: analysis of the offshore wind market, when there is something to say
Register, free.

Name and email, no password. Everything listed here opens across the site.

Registering includes news on the projects you follow (Hafrok Monitor), notices about your account, and the occasional question from me about how Hafrok works for you. Switch the Monitor off on your account page, or unsubscribe from any mail with one click. Privacy.