Dogger Bank B

Part of the 3.6 GW Dogger Bank Wind Farm complex (Phases A, B, C).

Delivery outlook modelled by Hafrok · calibrated on delivered projects

Near certainHafrok's delivery likelihood for Dogger Bank B
The developer says 2027. Hafrok's year agrees with that date; the year, the chance and the working are for registered readers.
Free for registered readers in early access · register below ↓

Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record

6 dated milestones on the spine, each with its source · 4 recorded ownership deals from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓

Revenue & offtake contract terms, price levels and the route to market

the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓

Installation how the build is going · from sourced statements and Hafrok's registers

construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓

Sources & verification

Rests on 22 sources (20 primary) · ◆ 15 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator4
[1]
legislation.gov.uk2015-02-17◆ The Dogger Bank Creyke Beck Offshore Win…
“Project B offshore works Work No. 1B — (a) an offshore wind turbine generating station with a gross electrical output capacity of up to 1.2 gigawatts comprising up to 200 wind turbine generators each …”
supportsConsentTotal capacityConsent appliedConsent granted
[3]
BEIS (gov.uk)2019-09-20◆ CfD Allocation Round 3 results
“Doggerbank Creyke Beck B P1 | DoggerbankOffshoreWindFarm Project2ProjcoLimited | Offshore Wind | 1200.00 | 41.611 | 2024/25 | 1,505,330 | England”
supportsTotal capacityMechanismStrike / priceDetailCfD · AR3
[17]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2541: Site Name "Dogger Bank A & B (was Creyke Beck A & B)", Development Status "Under Construction", Installed Capacity 2400 MWelec, Operator "SSE/Equinor (for…”
supportsRegister entry
[25]
The Planning Inspectorate (PINS)2026-08-23◆ PINS national infrastructure application…
“Project reference EN010021: "Dogger Bank Creyke Beck"; applicant "Forewind Limited"; Stage "Post-decision"; applied 2013-08-29; accepted 2013-09-25; decision 2015-02-17.”
supportsConsentConsent appliedConsent granted
Operator12
[4]
Dogger Bank Wind Farm (SSE Renewables / Equinor JV)2020-11-26◆ Dogger Bank Wind Farm A and B reaches fi…
“Dogger Bank A and B reach financial close on 26 November 2020, the largest offshore wind project financing to date globally. First power is expected in Summer 2023 and Summer 2024 for Dogger Bank A an…”
supportsFinal investment decisionTotal capacitymarshalling turbine installation
[5]
Dogger Bank Wind Farm (SSE Renewables / Equinor / Vårgrønn JV)2022-10-17◆ Vargronn acquires Plenitude's 20% intere…
“Vårgrønn has acquired Plenitude's 20% interest in the world's largest offshore wind farm — Dogger Bank. The wind farm is a joint venture between SSE Renewables (40%), Equinor (40%) and Vårgrønn (20%).”
supportsoperatorowner
[6]
Dogger Bank Wind Farm (SSE Renewables / Equinor / Vårgrønn JV)2020-01
“Onshore construction began in January 2020 when our contractors, Jones Bros, broke ground near the village of Ulrome in the East Ridings of Yorkshire.”
supportsOnshore constructionOffshore construction
[7]
SSE Renewables2024-05-14◆ Foundation installation campaign begins …
“Seaway7's vessels Seaway Strashnov and Seaway Alfa Lift have commenced installation of monopile foundations and transition pieces for the Dogger Bank B phase of the offshore wind farm project.”
supportsFoundationSeaway Strashnov — foundation installationSeaway Alfa Lift — foundation installation
[11]
Dogger Bank Wind Farm (SSE Renewables / Equinor / Vårgrønn JV)2026-06-10
“Dogger Bank A and B, with a combined generation capacity of 2.4GW, will connect in to the existing Creyke Beck substation. Around 131km from shore at its closest point. Dogger Bank B covers an area of…”
supportsStatusConnection pointDistance from shore
[15]
GE Renewable Energy2020-09◆ Haliade-X 13 MW Dogger Bank launch PR
“GE Renewable Energy to supply 190 Haliade-X turbines for Dogger Bank A and B. The project will be first in the world to feature the 13 MW variant of GE Renewable Energy’s Haliade-X platform ... GE Ren…”
supportsTurbinesModelUnit capacity
[18]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-000410: "Dogger Bank Project 4 (Dogger Bank B)", Status "Built", MW Connected 1200, Effective From n/a, Customer "DOGGERBANK OFFSHORE WIND FARM PROJECT 2 …”
supportsRegister entry
[19]
Equinor ASA2026-03-19◆ Equinor Annual Report 2025 (equinor.com …
"In 2026, Dogger Bank A will enter full production and first production at Dogger Bank B is expected to start up." ... "At Dogger Bank A, preparations are underway to complete commissioning. Construct…
supportsCommercial operationCOD history
[20]
SSE plc2026-07-16◆ SSE Renewables — sse plc q1 fy27 trading…
“Work is progressing strongly at Dogger Bank B with 30 turbines installed with the run-rate of installation significantly exceeding that achieved on the first phase.”
supportsStatus note
[21]
SSE plc2026-05-28◆ SSE plc preliminary results FY2026
“Turbine installation is progressing strongly at Dogger Bank B (1.2GW, SSE share 40%) with the installation run-rate far exceeding that achieved on the first phase, resulting in 20 turbines currently i…”
supportsFirst power
[22]
SSE plc2026◆ SSE Annual Report 2026 (FY to 31 March 2…
“Turbine installation is progressing strongly at Dogger Bank B (1.2GW, SSE share 40%) with the installation run-rate far exceeding that achieved on the first phase, resulting in 20 turbines currently i…”
supportsFirst power
[24]
SSE plc2026-10-01◆ Trading update
“Delivery at Dogger Bank offshore wind farm continues to progress well, and in line with expectations, with turbine installation on Dogger Bank B beyond the half-way point.”
supportsStatus note
Trade press6
[8]
offshoreWIND.biz2026-03-03◆ First turbine up at dogger bank b offsho…
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityVoltaire — turbine installation
[9]
offshoreWIND.biz2026-06-09
Press report — cited, not quoted; read it at the source link.
supportsStatus note
[10]
offshoreWIND.biz2026-05-12
Press report — cited, not quoted; read it at the source link.
supportsmarshalling turbine installation
[12]
4C Offshore (TGS)2026-07-02
Press report — cited, not quoted; read it at the source link.
supportsCoordinates
[13]
GEBCO Compilation Group2020
supportsWater depth
[14]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Early access

Follow the offshore wind projects that matter to you.

Hafrok's data and analysis. Free while in early access.

  • The data, in full: the project database as an Excel workbook, Hafrok's expected delivery outlook on every project still to build, the full project records, the transaction database and the developer profiles
  • Hafrok Monitor: follow projects, developers or countries, and Hafrok Monitor mails you what moved on your list, with the source and the date: every Monday morning, or as it happens
  • Hafrok Commentary: analysis of the offshore wind market, when there is something to say
Register, free.

Name and email, no password. Everything listed here opens across the site.

Registering includes news on the projects you follow (Hafrok Monitor), notices about your account, and the occasional question from me about how Hafrok works for you. Switch the Monitor off on your account page, or unsubscribe from any mail with one click. Privacy.