Located 23km off Suffolk coast. Inner Gabbard (56 turbines) and Galloper Sand (84 turbines) arrays. Round 2 development.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record

5 dated milestones on the spine, each with its source · 4 recorded ownership deals from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓

Revenue & offtake contract terms, price levels and the route to market

the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓

Installation how the build is going · from sourced statements and Hafrok's registers

construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓

Sources & verification

Rests on 10 sources (10 primary) · ◆ 7 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[10]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2510: Site Name "Greater Gabbard Wind Farm", Development Status "Operational", Installed Capacity 504 MWelec, Operator "Airtricity / Fluor Ltd"”
supportsRegister entry
Operator7
[1]
Fluor Corporation2007-02-19◆ Greater Gabbard Wind Farm Receives Conse…
“Greater Gabbard Offshore Winds Limited (GGOWL), an Airtricity and Fluor joint venture, today received planning permission for the construction of an offshore wind farm to be located 25km off the coast…”
supportsConsentTurbinesStatusConnection pointDistance from shore+1 more
[2]
RWE AG2022-06-20◆ RWE wins long term service & maintenance…
“Greater Gabbard Offshore Wind Farm is a joint venture between RWE Renewables (50%) and SSE Renewables (50%) and has been in operation since 2012, generating enough low-carbon renewable energy each yea…”
supportsTurbinesUnit capacityTotal capacity
[3]
RWE AG2022-09-07◆ A decade of clean energy celebrated at G…
“All 140 turbines of the joint venture between RWE Renewables (50%) and SSE Renewables (50%) have been operational since September 2012 [...] Located in the North Sea, around 20km off the coast of Suff…”
supportsCommercial operationCOD historyTurbinesTotal capacity
[5]
Fluor Corporation2013
“Onshore construction began in 2008 [...] offshore construction in summer 2009. 140 wind turbines total, each rated at 3.6 MW capacity. Steel monopiles: 84,000 tons total. Three 132-kilovolt subsea cab…”
supportsTurbinesModelUnit capacityFoundation
[6]
SSE Renewables2024◆ Greater Gabbard | SSE Renewables
“504MW offshore wind farm [...] 50:50 Joint Venture between SSE Renewables and RWE Renewables. A pioneering project for the UK offshore wind industry. Development rights were awarded in 2003, planning …”
supportsFirst powerTotal capacityCoordinates
[8]
SSE Renewables2024◆ Greater Gabbard | SSE Renewables
supportsoperatorowner
[11]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-000168: "Greater Gabbard Offshore Wind Farm", Status "Built", MW Connected 500, Effective From n/a, Customer "GREATER GABBARD OFFSHORE WINDS LIMITED"”
supportsRegister entry
Trade press2
[4]
Power Technology (GlobalData)2013
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionOffshore constructionFoundationWater depth
[9]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Early access

Follow the offshore wind projects that matter to you.

Hafrok's data and analysis. Free while in early access.

  • The data, in full: the project database as an Excel workbook, Hafrok's expected delivery outlook on every project still to build, the full project records, the transaction database and the developer profiles
  • Hafrok Monitor: follow projects, developers or countries, and Hafrok Monitor mails you what moved on your list, with the source and the date: every Monday morning, or as it happens
  • Hafrok Commentary: analysis of the offshore wind market, when there is something to say
Register, free.

Name and email, no password. Everything listed here opens across the site.

Registering includes news on the projects you follow (Hafrok Monitor), notices about your account, and the occasional question from me about how Hafrok works for you. Switch the Monitor off on your account page, or unsubscribe from any mail with one click. Privacy.