South Fork Wind

Located 56 km (35 miles) east of Montauk Point, Long Island, in BOEM lease OCS-A 0517. First utility-scale offshore wind farm in US federal waters.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2014’15’16’17’18’19’20’21’22’23’24’25’26BOEM Lease Sale 2 — awarded to Deepwater Wind New England, LLCBOEM Lease Sale 2 Jul 2013 · auction recordView the source for Consent grantedConsent granted Nov 2021 View the source for Final investment decisionFinal investment decision Feb 2022 View the source for Onshore constructionOnshore construction Feb 2022 View the source for First powerFirst power Dec 2023 View the source for Commercial operationCommercial operation Mar 2024 BOEM Lease Sale 2 — awarded to Deepwater Wind New England, LLC 2013-07 ORIGINATIONDeepwater Wind (D.E. Shaw Group) → Ørsted — 100.0% · closed 2018-11 2018-10 PORTFOLIOØrsted → Eversource — 50.0% · closed 2019-Q2 2019-02 FARMDOWNEversource → GIP (Skyborn Renewables) — 50.0% · closed 2024-09 2024-02 DIVESTMENTTODAYDeepwater Wind (D.E. Shaw Group) Deepwater Wind New Engl… Deepwater Wind New Engl… exited 2018-10Ørsted — 50% today · operator Ørsted Ørsted 50%Eversource Eversource Eversource exited 2024-02Skyborn Renewables (GIP) — 50% today · partner Skyborn Renewables Skyborn Renewables 50%BOEM Lease Sale 2 — awarded to Deepwater Wind New England, LLC Deepwater Wind (D.E. Shaw Group) → Ørsted — 100.0% · closed 2018-11 100%Ørsted → Eversource — 50.0% · closed 2019-Q2 50%Eversource → GIP (Skyborn Renewables) — 50.0% · closed 2024-09 50%
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2023-H22024-Q1 · 2 recorded revisions · held (announced 2023-H2, unchanged)

Revenue & offtake the regime the project was built under

Offtake regime on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2024-03
Construction ports
PortState Pier turbine staging

Sources & verification

15/18 fields verified · rests on 10 sources (10 primary) · ◆ 8 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[1]
Bureau of Ocean Energy Management (BOEM)2021-11-24◆ South Fork Wind Record of Decision
“The Project will be located in the Lease Area (area of BOEM's Renewable Energy Lease Number OCS-A 0517), which is approximately 19 miles southeast of Block Island, Rhode Island, and 35 miles east of M…”
supportsConsentFoundationMechanismDetailDistance from shore+2 more
[15]
Bureau of Ocean Energy Management (BOEM)2026-08-23◆ US BOEM offshore-wind register (FR docum…
“Lease row OCS-A 0517: companies ['South Fork Wind, LLC']; lease_dates ['10/01/2013']; lease_terms ['25 Years']; states ['New York', 'Rhode Island / Massachusetts']; block_count 53.”
supportsRegister entry
Operator4
[3]
Ørsted A/S2023-02-01◆ Orsted Annual Report 2022
“11 Feb. Ørsted and Eversource joint venture approves final investment decision on New York's South Fork Wind Offshore Wind Farm”
supportsFinal investment decision
[4]
Ørsted A/S2025-02-01◆ Ørsted Annual Report 2024
“The offshore installation vessel Aeolus played a crucial role in installing the 12 turbines that make up South Fork Wind, off the coast of New York State in the US. Construction concluded in March 202…”
supportsTurbinesUnit capacityTotal capacity
[7]
NYSERDA / Governor's Office2023-12-06◆ South Fork Wind Delivers First Offshore …
“South Fork Wind Becomes First Utility-Scale Offshore Wind Farm in Federal Waters to Begin Powering Up in the United States. ... Governor Kathy Hochul today announced the successful delivery of clean p…”
supportsFirst power
[8]
NYSERDA / Governor's Office2024-03-14◆ Completion of South Fork Wind, First Uti…
“South Fork Wind began construction in February 2022, beginning with the onshore export cable system. ... South Fork Wind began construction in February 2022, beginning with the onshore export cable sy…”
supportsOnshore constructionCommercial operationCOD historyStatusConnection point+1 more
Trade press4
[6]
offshoreWIND.biz2021-10-01◆ Siemens Gamesa Receives Firm Order for T…
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityTotal capacity
[10]
offshoreWIND.biz2024-10◆ Skyborn Renewables Now Ørsted's Joint Ve…
Press report — cited, not quoted; read it at the source link.
supportsoperatorpartner
[11]
GEBCO Compilation Group2020
supportsWater depth
[12]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed