West of Duddon Sands

Located 14km SW of Walney Island, East Irish Sea.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2004’05’06’07’08’09’10’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26Crown Estate Round 2 — awarded to Ørsted / ScottishPowerCrown Estate Round 2 Dec 2003 · auction recordView the source for Consent grantedConsent granted Sep 2008 View the source for Final investment decisionFinal investment decision 2011 View the source for Onshore constructionOnshore construction 2012 View the source for Offshore constructionOffshore construction 2013 View the source for Commercial operationCommercial operation 2014-Q4 Crown Estate Round 2 — awarded to Ørsted / ScottishPower 2003-12 ORIGINATIONØrsted, ScottishPower Renewables — 50% · closed 2012-Q1 2011-06 JV FORMATIONØrsted → Schroders Greencoat — 24.5% · €542m 2025-04 FARMDOWNTODAYØrsted — 25.5% today · operator Ørsted Ørsted 25.5%ScottishPower Renewables — 50% today · operator ScottishPower ScottishPower 50%Schroders Greencoat — 24.5% today Schroders Greencoat Schroders Greencoat 24.5%Crown Estate Round 2 — awarded to Ørsted / ScottishPower Ørsted, ScottishPower Renewables — 50% · closed 2012-Q1 Ørsted → Schroders Greencoat — 24.5% · €542m 24.5%
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake the regime the project was built under

Offtake regime: ROC 2.0 ROCs/MWh (subsidy expiry 2034)
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing108108 turbines + 1 platform expected · 1 fewer than expected — a position the survey missed
Surveyed2026-09-01from 120 satellite passes
Built2013 → 2014-Q4offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-07Copernicus Sentinel-1 radar satellite, southbound pass
Farm covered100%the whole farm lies inside the image
Structures ringed108 confirmed · 0 not yet confirmedas counted on 2026-09-01 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortBelfast Harbour ·turbine assembly and installation · quay 500 m · crane 840 t · draft 10 m
PortBarrow-in-Furness O&M base
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (108)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over West of Duddon Sands, 2026-09-07
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationWest of Duddon Sands Offshore Substation Platform·150/34 kV · in service 2014 · owner WoDS Transmission plc (OFTO; Macquarie Corporate Holdings Pty Ltd and 3i Infrastructure plc); developed by Ørsted (DONG Energy) and ScottishPower Renewables
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
2014201520162017201820192020202120222023202420252026developer’s stated start 2014-Q4nowWest of Duddon Sands Offshore Substation PlatformWest of Duddon Sands Offshore Sub…in service 2014in service 2014

Sources & verification

15/18 fields verified · rests on 12 sources (7 primary) · ◆ 10 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[4]
UK Department of Energy and Climate Change (DECC)2014-10-30◆ Edward Davey opens West of Duddon Sands …
“West of Duddon Sands wind farm ... officially opened by UK Energy Secretary Ed Davey ... 389 megawatt (MW) wind farm ... completed two months ahead of schedule ... Joint venture between ScottishPower …”
supportsBackground
[10]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2519: Site Name "West of Duddon Sands", Development Status "Operational", Installed Capacity 389 MWelec, Operator "Scottish Power Renewables & Orsted (formerly …”
supportsRegister entry
Operator4
[1]
Ørsted A/S2014-10-30◆ West of Duddon Sands is now officially o…
“Full power output has been achieved more than two months ahead of schedule from West of Duddon Sands Offshore Wind farm ... The news came on the day that the 389 megawatt (MW) wind farm was officially…”
supportsCommercial operationTurbinesUnit capacityTotal capacityFoundation+4 more
[2]
Ørsted A/S2014-06-19◆ Final turbine installed at West of Duddo…
“The team behind the West of Duddon Sands offshore wind farm are celebrating the successful installation of the final turbine at the 389MW project. The 108th turbine was hoisted into position by the Se…”
supportsTurbinesModelUnit capacityTotal capacity
[3]
Ørsted A/S2025-05-01◆ Orsted divests 24.5% stake in West of Du…
“Ørsted has completed a farm-down for a 24.5% stake in West of Duddon Sands Offshore Wind Farm to funds managed by Schroders Greencoat. The value of the transaction is GBP 456.1 million (approx. DKK 4 …”
supportsoperatorownerTotal capacityDistance from shore
[11]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-000210: "West of Duddon Sands Offshore Wind Farm", Status "Built", MW Connected 382, Effective From n/a, Customer "MORECAMBE WIND LIMITED"”
supportsRegister entry
Financier1
[5]
European Investment Bank2013-02-18◆ WEST OF DUDDON SANDS OFFSHORE WINDFARM
“a 389 MW offshore windfarm in the Irish Sea (Northwest England), comprising 108 turbines positioned 14 kilometers southwest of Barrow-in-Furness with water depths between 17-24 meters.”
supportsWater depthDistance from shoreCoordinates
Trade press5
[6]
Power Technology (GlobalData)
Press report — cited, not quoted; read it at the source link.
supportsConsentFinal investment decisionOnshore constructionOffshore constructionModel+5 more
[8]
Business News Today2025-06-23◆ What is the West of Duddon Sands Offshor…
“Ørsted has retained operational control and now holds a 25.5 percent stake in the project. ScottishPower Renewables maintains its 50 percent ownership.”
supportsoperator
[9]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[12]
Ørsted2025-Q2◆ Orsted — orsted factsheet asset book q2 …
“West of Duddon Sands (108 x SWT-3.6-120) | Scottish Power Renewables (Iberdrola), Schroders Greencoat | 388.8 | 388.8 | 99.1 | Pro rata | 0.255 | 0.255 | 2014 | ROC | 2034 | - | 2”
supportsMechanismDetail
[13]
Ørsted2025-03-31◆ Orsted — orsted factsheet asset book q1 …
“OFFSHORE - Asset Book updated as of 31 March 2025 ... West of Duddon Sands (108 x SWT-3.6-120) | Scottish Power Renewables (Iberdrola) | 388.8 | 388.8 | 194.4 | Pro rata | 0.5 | 0.5 | 2014 | ROC | 203…”
supportsTotal capacity