Walney Extension

Located 19km west of Cumbrian coast, adjacent to Walney 1 & 2.

Status
Operationallifecycle stage
Ownership
Ørsted — 37.55% 
BIBrookfield Infrastructure Fund V — 12.45% 
PKA (via AIP Management) — 18.75% 
PFAPFA — 18.75% 
OGOctopus Energy Generation — 12.5% 
Location
United Kingdom
Irish Sea
Technology
Capacity 659 MW  Turbines 87 × 7 MW  Model Siemens Swt 7-0-154  Foundation Monopile 
Site & conditions
Site rights Seabed rights held 
Origination Crown Estate Round 1 & 2 site extensions (2010) · 2010 ·
Water depth 19–23 m  Distance from shore 19 km  Wind speed 9.8 m/s @ 100 m 
Revenue & grid
Offtake CfD · FIDeR · £150/MWh  Grid Secured · 2018  Connection Middleton 400kV substation, Heysham (OFTO: Diamond Transmission … 
Schedule
FID 28 Oct 2015  COD 2018-Q3 

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2010’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26Crown Estate Round 1 & 2 site extensions (2010) — awarded to Dong Wind UKCrown Estate Round 1 & 2 site extensions (2010) May 2010 · auction recordView the source for Consent grantedConsent granted 7 Nov 2014 View the source for Onshore constructionOnshore construction Aug 2015 View the source for Final investment decisionFinal investment decision 28 Oct 2015 View the source for Offshore constructionOffshore construction 2016 View the source for First powerFirst power Sep 2017 View the source for Commercial operationCommercial operation 2018-Q3 Crown Estate Round 1 & 2 site extensions (2010) — awarded to Dong Wind UK 2010-05 ORIGINATIONØrsted → PKA / PFA — 50% 2017-11 FARMDOWNPKA / PFA (via AIP Management) → Octopus Energy Generation — 12.5% · closed 2024-02 2023-11 Ørsted → Brookfield — 12.45% · closed 2024-12 2024-10 PORTFOLIOTODAYØrsted — 37.55% today · operator Ørsted Ørsted 37.55%PKA (via AIP Management) — 18.75% today PKA PKA 18.75%PFA — 18.75% today PFA PFA 18.75%Octopus Energy Generation — 12.5% today Octopus Energy Generati… Octopus Energy Generati… 12.5%Brookfield Infrastructure Fund V — 12.45% today Brookfield Brookfield 12.45%Crown Estate Round 1 & 2 site extensions (2010) — awarded to Dong Wind UK Ørsted → PKA / PFA — 50% Ørsted → PKA / PFA — 50% 50% → consortiumPKA / PFA (via AIP Management) → Octopus Energy Generation — 12.5% · closed 2024-02 PKA / PFA (via AIP Management) → Octopus Energy Generation — 12.5% · closed 2024-02 12.5% → consortiumØrsted → Brookfield — 12.45% · closed 2024-12 12.45%
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake contract duration and price levels · money of the day

660 MW contracted — investment contract
Investment contract · FID Enabling for Renewables (FIDeR) investment contracts
Price£150/MWh ·
Basis2012 real · CPI-indexed
Capacity660 MWAwardedApr 2014
Term15 yrs · delivery 2016/17
Money-of-the-day values computed by Hafrok from the United Kingdom CPI index, 2012 real base — actual to 2026-07, then an assumed +2.0%/yr (central-bank target). Investment contract terms run 15 years from start of generation in the contracted delivery year.
Contract price over time · £/MWh
solid = actual CPI indexation · dashed = assumed +2.0%/yr
Investment contract · FID Enabling for Renewables (FIDeR) investment contracts
50100150200250nowInvestment contract · FID Enabling for Renewables (FIDeR) investment contracts — £150/MWh · 2012 real · CPI-indexedInvestment contract · FID Enabling for Renewables (FIDeR) investment contracts — £150/MWh · 2012 real · CPI-indexed · assumed indexationInvestment contract · FID Enabling for Renewables (FIDeR) …2014201720202023202620292032Investment contract · FID Enabling for Renewables (FIDeR) investment contracts — £150/MWh · 2012 real · CPI-indexed — 156.1 at award221.0 now

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing9087 turbines + 1 platform expected · 2 more than expected — a met mast, a platform not on the register, or a position the survey missed
Surveyed2026-09-01from 147 satellite passes
Built2016 → 2018-Q3offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-05Copernicus Sentinel-1 radar satellite, northbound pass · 3 newer passes skipped because the satellite’s track only caught part of the farm (the best of them 71%)
Farm covered100%the whole farm lies inside the image
Structures ringed90 confirmed · 0 not yet confirmedas counted on 2026-09-01 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortPort of Barrow-in-Furness construction
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-05
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (90)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Walney Extension, 2026-09-05
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationWalney Extension offshore substations (2, described collectively)·owner Diamond Transmission Partners Walney Extension (OFTO); built by Ørsted

Sources & verification

18/19 fields verified · rests on 11 sources (6 primary) · ◆ 5 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[1]
Planning Inspectorate2014-11-07◆ Walney Extension Offshore Wind Farm - Pr…
"This application was granted on 7 November 2014." The Secretary of State for Energy and Climate Change granted the Development Consent Order (DCO) for Walney Extension Offshore Wind Farm (EN010027), …
supportsConsentConsent granted
[13]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2533: Site Name "Walney 3", Development Status "Operational", Installed Capacity 659 MWelec, Operator "Orsted (formerly Dong Energy)"”
supportsRegister entry
Operator2
[8]
National Audit Office2014-06◆ Early contracts for renewable electricit…
"Administrative strike prices by commissioning date and technology (2012 GBP/MWh)" — Offshore wind: 2016-17 £150; 2017-18 £140; 2018-19 £140. FIDeR strikes are CPI-indexed; the same strike applies to …
supportsMechanismStrike / priceDetail
[14]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-000239: "Walney 3 Offshore Wind Farm", Status "Built", MW Connected 330, Effective From n/a, Customer "WALNEY EXTENSION LIMITED"; PRO-000240: "Walney 4 Of…”
supportsRegister entry
Auction results1
[15]
Low Carbon Contracts Company (LCCC)2026-07-31◆ lccc-portfolio-status-2026-07
Investment Contract units, all 'Live (Post-FIC)': INV-BUR-001 Burbo Bank Extension; INV-DUD-001/002/003 Dudgeon; INV-WAL-001/002 Walney Extension; INV-BEA-001/002 Beatrice; INV-HOR-001/002/003 Hornsea…
supportsInvestment contract · FID Enabling for Renewables (FIDeR) investment contracts
Trade press6
[2]
Offshore Engineer (OEDigital)2015-10-28
"Walney Extension, which had a final investment decision in October 2015" — DONG Energy announced FID for the 660 MW Walney Extension project on 28 October 2015, after securing all permits, completing…
supportsFinal investment decision
[3]
Offshore Wind Biz2018-09-06
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationTurbinesModelUnit capacityTotal capacity+2 more
[9]
Diamond Transmission Partners
“660 MW connection between the generators and onshore transmission system. Two undersea cables up to 76 km in length connecting offshore substations to shore at Heysham. Approximately 4 km of onshore c…”
supportsStatusConnection point
[10]
NS Energy Business
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionOffshore constructionFirst powerTurbinesModel+5 more
[11]
offshoreWIND.biz2024-10
Press report — cited, not quoted; read it at the source link.
supportsoperatorowner
[12]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed