Rodsand 2
Located ~9 km southeast of Rodbyhavn, south of Lolland island. Adjacent to Nysted/Rodsand 1.
Technology
Capacity
207 MW ◆
Turbines
90 × 2.3 MW ◆
Model
Siemens Swt 2-3-93 ◆
Foundation
GBS ◆
Site & conditions
Site rights
Seabed rights held ∴
Origination
Rødsand 2 re-tender · 2008 ·
Water depth
5–13 m ◆
Distance from shore
9 km ◆
Wind speed
9.5 m/s @ 100 m ≈
Revenue & grid
Offtake
CfD · 62.9 DKK_ore_per_kWh ◆
Grid
Secured · 2010 ◆
Connection
Andel (formerly SEAS-NVE) 132 kV onshore grid ◆
Schedule
FID
2009 ∅
COD
2010-Q4 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record
5 dated milestones on the spine, each with its source · 4 recorded ownership deals from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓
Revenue & offtake contract terms, price levels and the route to market
the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓
Installation how the build is going · from sourced statements and Hafrok's registers
construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓
Sources & verification
Rests on 10 sources (5 primary) · ◆ 4 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[12]
Energistyrelsen (Danish Energy Agency)
"Afgørelsen er truffet i henhold til VE-lovens § 25, hvorefter Energistyrelsen skal give tilladelse til væsentlige ændringer af eksisterende elproducerende anlæg samt ud fra vilkår fastsat i etablerin…
supportsConsentConsent granted
Operator2
[1]
RWE (Denmark)2024◆ Rødsand 2 Offshore Wind Farm | RWE in De…
“installed capacity of 207 MW … 90 wind turbines with a capacity of 2.3 MW each … tower height of 68.5 metres and a rotor diameter of 93 metres … water depth of 5-13 metres … approximately nine kilomet…”
supportsoperatorTurbinesUnit capacityTotal capacityWater depth+2 more
[9]
Auction results1
[15]
Ingeniøren2008-04-25◆ ing-rodsand-2-retender-2008
"EON bød med 62,9 øre pr. kWh for 50.000 fuldlasttimer en lavere pris end Dong Energy, der var den eneste anden byder. ... Da EON og Dong oprindelig vandt koncessionen med en pris på 49,9 øre pr. kWh,…
supportsTender award · Rødsand 2 re-tender
Trade press6
[2]
Power Technology2010
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionTurbinesModelUnit capacityTotal capacity+3 more
[5]
Ingeniøren2008-04-25◆ EON vinder Rødsand havvindmøllepark | In…
"EON bød med 62,9 øre pr. kWh for 50.000 fuldlasttimer … svarer til 14 års elproduktion" — E.ON bid 62.9 øre/kWh for 50,000 full-load hours (approx. 14 years of production); E.ON's bid was lower than …
supportsMechanismStrike / priceDetail
[6]
Offshore Wind Biz2010-10-13
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationCOD history
[10]
[11]
Energy Supply DK2010-06-02
"I dag leverer ca. 25 vindmøller allerede el, og de øvrige bliver løbende koblet på. ... Samtlige 90 møller skal efter planen være rejst og i gang med at producere el i slutningen af sommeren" — ca. 2…
supportsFirst power
[13]