Nysted (Rodsand 1)

Located ~10 km south of Nysted, island of Lolland. Also known as Rodsand I. PensionDanmark acquired 50% from Ørsted in September 2010 for DKK 670m.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record

5 dated milestones on the spine, each with its source · 5 recorded ownership deals from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓

Revenue & offtake contract terms, price levels and the route to market

the FiT contract's terms · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓

Installation how the build is going · from sourced statements and Hafrok's registers

construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓

Sources & verification

Rests on 13 sources (9 primary) · ◆ 6 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator5
[1]
Energistyrelsen (Danish Energy Agency)2001-07-27◆ Energistyrelsens godkendelse - vindmoell…
"Energistyrelsen godkender Energi E2's ansøgning om etablering af en havbaseret demonstrations-vindmøllepark ved Rødsand." "Det ansøgte projekt består af en havvindmøllepark på 64-96 møller med en sam…
supportsConsentFoundationWater depthDistance from shoreConsent granted
[2]
Energistyrelsen (Danish Energy Agency)2003-06-10◆ Elproduktionsbevilling for Nysted
“Elproduktionsbevilling for Nysted Havvindmøllepark meddelt 10. juni 2003. Scanned document — no machine-readable text layer. Date 2003-06-10 per Energistyrelsen catalog and confirmed by the 2025 life-…”
supportsMechanismDetail
[3]
Energistyrelsen (Danish Energy Agency)2025-06-26◆ Tilladelse til forlaengelse af elprodukt…
"Energistyrelsen giver hermed tilladelse til forlængelse af Nysted I A/S' elproduktionstilladelse til Nysted Havvindmøllepark. Dette medfører, at Nysted I kan drive elproduktionsanlægget bestående af …
supportsBackground
[4]
Energistyrelsen (Danish Energy Agency)◆ Eksisterende havvindmølleparker
"Havvindmølleparken består af 72 møller (70 på nuværende tidspunkt) med en samlet effekt på cirka 165,6 MW (161 MW på nuværende tidspunkt)." "Anlægsarbejdet blev påbegyndt i 2002, og havvindmølleparke…
supportsOnshore constructionOffshore constructionSite rightsTurbinesTotal capacity+1 more
[12]
Energistyrelsen (Danish Energy Agency)2021-10-29
"Stamdataregister for vindkraftanlaeg" / "Master data register for wind turbines". Sheet "IkkeAfmeldte-Existing turbines", columns "Turbine identifier (GSRN) | Date of original connection to grid | Ca…
supportsTurbinesModelUnit capacity
Operator1
[5]
DONG Energy (now Ørsted)2010-09-30◆ Stadtwerke Lübeck and DONG Energy to swa…
“After the transaction DONG Energy and Stadtwerke Lübeck will through DONG Energy Nysted I A/S own 42.75 % and 7.25 % respectively of Nysted offshore wind farm. PensionDanmark owns the remaining 50 %.”
supportsoperatorowner
Financier1
[7]
European Investment Bank
"72 turbines of 2.3 MW each" for a total capacity of "approximately 166 MW." "expected to produce around 600 GWh of electricity per year." "should go into full operation in 2003." "132 kV, 150 MW subm…
supportsTurbinesUnit capacityTotal capacityStatusConnection point
OEM1
[13]
Siemens Gamesa Renewable Energy (conference deck)2018-01-25◆ SGRE offshore sales deck 2018 (installed…
“Installed offshore fleet list, Denmark: "Roedsand/Nysted: 72x SWT-2.3-82 2003". (SGRE retro-designation of the Bonus-built hardware; cited as corroboration of the machine, not of the brand — Siemens a…”
supportsTurbinesModel
Trade press5
[6]
FIH Partners (transaction adviser)2010-11
"Ørsted and PensionDanmark each own 50% of the Nysted offshore wind farm." [...] "a 50% stake" [...] "EUR 94 million" [...] "first ever direct investment by a Danish pension fund into offshore wind" […
supportsTurbinesTotal capacity
[8]
offshoreWIND.biz2025-06-27
Press report — cited, not quoted; read it at the source link.
supportsBackground
[9]
GS Seacon Group ApS
"The last wind turbine was mounted July 27th 2003 and the last 33 kV cables were covered up in December 2003. The wind farm officially started in normal operation December 1st 2003." "foundations were…
supportsBackground
[10]
Ingeniøren (Teknologiens Mediehus)2003-12-03
"Selve byggeriet af havmølleparken offshore begyndte i juni 2002." ... "Den første strøm blev taget i land i den 13. juli 2003." ... "12. september var alle møller i drift." ... "Mandag aften den 1. d…
supportsOnshore constructionOffshore constructionFirst powerCommercial operationSite rights
[11]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Early access

Follow the offshore wind projects that matter to you.

Hafrok's data and analysis. Free while in early access.

  • The data, in full: the project database as an Excel workbook, Hafrok's expected delivery outlook on every project still to build, the full project records, the transaction database and the developer profiles
  • Hafrok Monitor: follow projects, developers or countries, and Hafrok Monitor mails you what moved on your list, with the source and the date: every Monday morning, or as it happens
  • Hafrok Commentary: analysis of the offshore wind market, when there is something to say
Register, free.

Name and email, no password. Everything listed here opens across the site.

Registering includes news on the projects you follow (Hafrok Monitor), notices about your account, and the occasional question from me about how Hafrok works for you. Switch the Monitor off on your account page, or unsubscribe from any mail with one click. Privacy.