EnBW Baltic 1

Located 16km north of Darss-Zingst peninsula, Mecklenburg-Vorpommern.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record

5 dated milestones on the spine, each with its source · the ownership chain from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓

Revenue & offtake contract terms, price levels and the route to market

the Premium contract's terms · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓

Installation how the build is going · from sourced statements and Hafrok's registers

construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓

Sources & verification

Rests on 15 sources (14 primary) · ◆ 9 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[14]
Bundesnetzagentur — Marktstammdatenregister2026-08-23◆ Marktstammdatenregister (MaStR) offshore…
“Park row "Baltic 1": 21 units, 48.3 MW gross, statuses {'In Betrieb': 21}, operators ['EnBW Baltic 1 GmbH & Co. KG'], commissioned 2011-04-03..2011-05-01, planned None..None.”
supportsFirst power
Operator5
[1]
EnBW Energie Baden-Württemberg AG2025◆ EnBW Baltic 1
“On 2 May 2011, we inaugurated the EnBW Baltic 1 offshore wind farm [...] the Baltic 1 offshore wind farm is located in the Baltic Sea, 16 kilometres north of the Darss-Zingst peninsula. [...] The 21 w…”
supportsCommercial operationTurbinesTotal capacityDistance from shore
[3]
EnBW Energie Baden-Württemberg AG2021-05-02◆ EnBW Baltic 1 celebrates 10th anniversar…
“Ten years ago, EnBW took into operation what was then Germany's first commercial offshore wind farm, the 48.3 megawatt Baltic 1 in the Baltic Sea. [...] Baltic 1 is located 16 kilometres off the coast…”
supportsTotal capacityDistance from shore
[11]
EnBW2026◆ EnBW Baltic 1
supportsoperatorowner
[15]
Bundesanzeiger2012-12-31◆ EnBW Baltic 1 GmbH & Co. KG, Stuttgart -…
“Die Gesellschaft hat in 2012 unter Beauftragung der EEE die Möglichkeit der Direktvermarktung nach Marktprämienmodell (§33g EEG) für EnBW Baltic 1 genutzt. Dabei wird die Gesellschaft risikolos am Zus…”
supportsMechanismDetail
[16]
Unternehmensregister2025-09-24◆ EnBW Baltic 1 GmbH & Co. KG, Biberach an…
“Die EnBW Baltic 1 GmbH & Co. KG (EB 1) hat ihren Sitz in Biberach an der Riß und ist eingetragen in das Handelsregister beim Amtsgericht Ulm (Reg. Nr. HRA 727605).”
supportsMechanismDetail
Financier1
[9]
European Investment Bank (EIB)2011-03-08◆ Germany: EIB finances first offshore win…
“The European Investment Bank (EIB) is providing a EUR 80 million loan to finance the construction and operation of Germany's first commercial offshore windfarm. [...] The project involved the construc…”
supportsTurbinesUnit capacityTotal capacity
Trade press6
[2]
Offshore Wind Biz2011-05-02◆ EnBW Officially Opens Baltic 1 Offshore …
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationTurbinesUnit capacityTotal capacityStatus+2 more
[4]
Power Magazine2011
“The 48.3-MW EnBW Baltic 1—consists of 21 Siemens wind turbines, each with a capacity of 2.3 MW [...] rotor diameter of 93 meters [...] monopiles (foundations) for the platform and wind turbine units […”
supportsTurbinesModelUnit capacityTotal capacityFoundation+1 more
[5]
Power Technology2011
Press report — cited, not quoted; read it at the source link.
supportsFoundationStatusConnection pointWater depth
[7]
wpd AG2006-04-05◆ Genehmigung des Offshore-Windparks Balti…
“Börgerende, 05. April 2006. Der Staatssekretär im Umweltministerium des Landes Mecklenburg-Vorpommern, Dr. Harald Stegemann, hat gestern in Schwerin gemeinsam mit dem Leiter der Genehmigungsbehörde de…”
supportsConsentConsent granted
[8]
International Energy Agency (IEA)2009-01
“The initial tariff is set at EUR cent 15 /kWh until 2015. After that it is set to decrease to EUR cent 13/kWh for new turbines, decreasing by 5% per year.”
supportsMechanismDetail
[13]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Encyclopaedic2
[6]
Wikipedia (DE)2024
“Der Bund erteilte am 31. März 2006 die BImSchG-Genehmigung für den Windpark. [...] Die vorhandene Wassertiefe liegt zwischen 16 m und 19 m. [...] Von März bis September 2010 wurden alle 21 Windenergie…”
supportsOffshore constructionSite rightsWater depth
[12]
Wikipedia2026-07-02
supportsCoordinates
Early access

Follow the offshore wind projects that matter to you.

Hafrok's data and analysis. Free while in early access.

  • The data, in full: the project database as an Excel workbook, Hafrok's expected delivery outlook on every project still to build, the full project records, the transaction database and the developer profiles
  • Hafrok Monitor: follow projects, developers or countries, and Hafrok Monitor mails you what moved on your list, with the source and the date: every Monday morning, or as it happens
  • Hafrok Commentary: analysis of the offshore wind market, when there is something to say
Register, free.

Name and email, no password. Everything listed here opens across the site.

Registering includes news on the projects you follow (Hafrok Monitor), notices about your account, and the occasional question from me about how Hafrok works for you. Switch the Monitor off on your account page, or unsubscribe from any mail with one click. Privacy.