Anholt
Located in the Kattegat between Djursland peninsula and Anholt island.
Status
Operationallifecycle stage
Ownership
Location
Kattegat
Technology
Capacity
399.6 MW ◆
Turbines
111 × 3.6 MW ◆
Model
Siemens Swt 3-6-120 ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Origination
Anholt Havmøllepark tender · 2010 ·
Water depth
16–19 m ≈
Distance from shore
15 km ◆
Wind speed
9.6 m/s @ 100 m ≈
Revenue & grid
Offtake
CfD ◆
Grid
Secured · 2010 ◆
Connection
Trige 400 kV substation near Aarhus (220 kV, 25 km submarine + … ◆
Schedule
FID
Taken · date not recorded ∴
COD
2013-Q3 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record
5 dated milestones on the spine, each with its source · 4 recorded ownership deals from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓
Revenue & offtake contract terms, price levels and the route to market
the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓
Installation how the build is going · from sourced statements and Hafrok's registers
construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓
Sources & verification
Rests on 11 sources (7 primary) · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[1]
Energistyrelsen (Danish Energy Agency)2010-07-02◆ DEA: Anholt offshore wind farm will be l…
"This price is fixed for the delivery of the first 20 TWh, which approximates to 12-13 years of production" at 105.1 ore/kWh (~14 Ec/kWh). "DONG Energy was the sole bidder." Decision accepted by Minis…
supportsMechanismDetail
Operator1
[4]
Ørsted (DONG Energy)2014-09-04◆ Anholt Offshore Wind Farm reaches milest…
"The wind farm consists of a total of 111 wind turbines with a capacity of 3.6MW each. The total capacity is 400MW." "The wind farm has been erected during the period 2012-2013 and covers an area of 8…
supportsTurbinesUnit capacityTotal capacityFoundation
Financier1
[12]
Auction results1
[19]
Energistyrelsen2010-04-07◆ ens-anholt-bid-2010
"Fristen for bud på etablering af Anholt Havmøllepark på 400 MW udløb i dag den 7. april kl. 14. Energistyrelsen har modtaget et bud. DONG Energy A/S har i dag offentliggjort, at selskabet har indgive…
supportsTender award · Anholt Havmøllepark tender
Trade press7
[9]
offshoreWIND.biz2012-01-13◆ DONG Energy starts construction of Anhol…
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionOffshore constructionDistance from shore
[10]
[11]
[13]
[14]
offshoreWIND.biz2012-09-21
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[15]
[16]
Ørsted2025-03-31◆ Orsted — orsted factsheet asset book q1 …
“OFFSHORE - Asset Book updated as of 31 March 2025 ... Anholt (111 x SWT-3.6-120) | Pension Danmark, AIP Management | 399.6 | 399.6 | 199.8 | Pro rata | 50% | 50% | 2013 | Expired 2024, market price | …”
supportsTotal capacity

