Anholt

Located in the Kattegat between Djursland peninsula and Anholt island.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2011’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26Anholt Havmøllepark tender — awarded to DONG Energy A/SAnholt Havmøllepark tender Jun 2010 · auction recordView the source for Consent grantedConsent granted Jul 2010 View the source for Onshore constructionOnshore construction 2012 View the source for Offshore constructionOffshore construction 2012 View the source for First powerFirst power 21 Sep 2012 View the source for Commercial operationCommercial operation 2013-Q3 Anholt Havmøllepark tender — awarded to DONG Energy A/S 2010-06 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDØrsted → PensionDanmark — 30.0% · €483m · closed 2011-10 2011-03 FARMDOWNØrsted → PKA — 20.0% · €322m · closed 2011-10 2011-03 FARMDOWNTODAYDONG Energy A/S DONG Energy A/S DONG Energy A/S not among today’s recorded owners — no sale recordedØrsted — 50% today · operator Ørsted Ørsted 50%PensionDanmark — 30% today PensionDanmark PensionDanmark 30%PKA — 20% today PKA PKA 20%Anholt Havmøllepark tender — awarded to DONG Energy A/S Transfer(s) not in Hafrok's record — shown as a gap, never guessed. Ørsted → PensionDanmark — 30.0% · €483m · closed 2011-10 30%Ørsted → PKA — 20.0% · €322m · closed 2011-10 20%
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake contract duration and price levels · money of the day

400 MW contracted — tender award
Tender award · Anholt Havmøllepark tender
Price105.1 DKK_ore/kWh ·Capacity400 MWAwardedJun 2010

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing110111 turbines + 1 platform expected · 2 fewer than expected — a position the survey missed
Surveyed2026-09-02from 89 satellite passes
Built2012 → 2013-Q3offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-07Copernicus Sentinel-1 radar satellite, northbound pass · 2 newer passes skipped because the satellite’s track only caught part of the farm (the best of them 80%)
Farm covered100%the whole farm lies inside the image
Structures ringed110 confirmed · 0 not yet confirmedas counted on 2026-09-02 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortPort of Grenaa ·installation and om · quay 350 m
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (110)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Anholt, 2026-09-07
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationAnholt A Transformer Platform·33/220 kV · in service 2012 · owner Energinet (Danish TSO)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
201220132014201520162017201820192020202120222023202420252026developer’s stated start 2013-Q3nowAnholt A Transformer PlatformAnholt A Transformer Platformin service 2012in service 2012

Sources & verification

15/18 fields verified · rests on 11 sources (5 primary) · ◆ 5 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[1]
Energistyrelsen (Danish Energy Agency)2010-07-02◆ DEA: Anholt offshore wind farm will be l…
"This price is fixed for the delivery of the first 20 TWh, which approximates to 12-13 years of production" at 105.1 ore/kWh (~14 Ec/kWh). "DONG Energy was the sole bidder." Decision accepted by Minis…
supportsMechanismDetail
Operator1
[4]
Ørsted (DONG Energy)2014-09-04◆ Anholt Offshore Wind Farm reaches milest…
"The wind farm consists of a total of 111 wind turbines with a capacity of 3.6MW each. The total capacity is 400MW." "The wind farm has been erected during the period 2012-2013 and covers an area of 8…
supportsTurbinesUnit capacityTotal capacityFoundation
Financier1
[12]
PensionDanmark2024
supportsoperatorowner
Auction results1
[17]
Energistyrelsen2010-04-07◆ ens-anholt-bid-2010
"Fristen for bud på etablering af Anholt Havmøllepark på 400 MW udløb i dag den 7. april kl. 14. Energistyrelsen har modtaget et bud. DONG Energy A/S har i dag offentliggjort, at selskabet har indgive…
supportsTender award · Anholt Havmøllepark tender
Trade press7
[9]
offshoreWIND.biz2012-01-13◆ DONG Energy starts construction of Anhol…
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionOffshore constructionDistance from shore
[10]
offshoreWIND.biz2013-09-04
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionCommercial operation
[11]
Power Technology
Press report — cited, not quoted; read it at the source link.
supportsConsentModelStatusConnection pointCoordinates+2 more
[13]
GEBCO Compilation Group2020
supportsWater depth
[14]
offshoreWIND.biz2012-09-21
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[15]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[16]
Ørsted2025-03-31◆ Orsted — orsted factsheet asset book q1 …
“OFFSHORE - Asset Book updated as of 31 March 2025 ... Anholt (111 x SWT-3.6-120) | Pension Danmark, AIP Management | 399.6 | 399.6 | 199.8 | Pro rata | 50% | 50% | 2013 | Expired 2024, market price | …”
supportsTotal capacity