Anholt
Located in the Kattegat between Djursland peninsula and Anholt island.
Status
Operationallifecycle stage
Ownership
Location
Kattegat
Technology
Capacity
399.6 MW ◆
Turbines
111 × 3.6 MW ◆
Model
Siemens Swt 3-6-120 ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Origination
Anholt Havmøllepark tender · 2010 ·
Water depth
16–19 m ≈
Distance from shore
15 km ◆
Wind speed
9.6 m/s @ 100 m ≈
Revenue & grid
Offtake
CfD ◆
Grid
Secured · 2010 ◆
Connection
Trige 400 kV substation near Aarhus (220 kV, 25 km submarine + … ◆
Schedule
FID
Taken · date not recorded ∴
COD
2013-Q3 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2010-06
Anholt Havmøllepark tender
- Awarded to
- DONG Energy A/S
- Basis
- integrated tender
From the auction results — the round that created the project.
Farmdown · 2011-03
Ørsted → PensionDanmark 30%
- Stake
- 30%
- Consideration
- €483m
- Implied 100% value
- €1,610m
- Implied
- €4.03m / MW
- Announced
- 2011-03
- Closed
- 2011-10
- Project stage
- pre-FID
DONG Energy sold 50% of the Anholt offshore wind farm (pre-FID, about to start construction) to a consortium of PensionDanmark (30%) and PKA (20%) for DKK ~6 billion combined (EUR ~805m). This record covers PensionDanmark's 30% share. Deal value is a pro-rata estimate: 30/50 × EUR 805m = EUR 483m. See companion record for PKA's 20% tranche. The DKK 6 billion headline figure is the equity purchase price paid in four instalments through end of 2013 (14%, 30%, 31%, 25% of price). Although payments overlapped with construction (first monopile placed 31 Dec 2011; full commission Sep 2013), independent sources confirm DKK 6bn is the equity acquisition price, not a capex-inclusive commitment. Total project cost was separately estimated at DKK ~10 billion; DONG retained construction responsibility under a fixed-price/fixed-date EPC commitment. Operating responsibility for proportionate interests transferred to pension funds on 1 April 2014. DONG retained operatorship. Transaction approval announced 10 Oct 2011 (Danish Energy Board of Appeal). Deal announced 28 March 2011 and closed Q4 2011. At closing the project was confirmed as pre-FID (FID taken 2012). Implied 100% = EUR 1,610m; EUR 4,025k/MW. Effectively priced as an operational-equivalent asset. DKK/EUR: 7.46 (pegged).
Evidence
- offshoreWIND.biz — PensionDanmark and PKA Acquire 50 pct of Anholt Offshore Wind Farm (Denmark) ↗ 2011-03 ◆ held
- orsted.com — Divestment of stakes in Anholt offshore wind farm has been approved ↗ 2011-03 ◆ held
- pensiondanmark.com ↗
From Hafrok’s transactions record
Farmdown · 2011-03
Ørsted → PKA 20%
- Stake
- 20%
- Consideration
- €322m
- Implied 100% value
- €1,610m
- Implied
- €4.03m / MW
- Announced
- 2011-03
- Closed
- 2011-10
- Project stage
- pre-FID
PKA acquired 20% of Anholt as part of the same consortium transaction with PensionDanmark (30%). Combined price was DKK ~6 billion (EUR ~805m) for 50%, paid in four instalments to end-2013. This record covers PKA's 20% tranche. Deal value is a pro-rata estimate: 20/50 × EUR 805m = EUR 322m. See companion PensionDanmark record.
Implied 100% = EUR 1,610m; EUR 4,025k/MW. Approaching operational range upper bound despite being pre-FID; explained by secured PSO offtake at 105.1 øre/kWh for first 20 TWh and DONG's fixed-price EPC wrapper transferring all construction risk. Effectively priced as an operational-equivalent asset. DKK/EUR: 7.46 (pegged).
Evidence
- offshoreWIND.biz — PensionDanmark and PKA Acquire 50 pct of Anholt Offshore Wind Farm (Denmark) ↗ 2011-03 ◆ held
- orsted.com — Divestment of stakes in Anholt offshore wind farm has been approved ↗ 2011-03 ◆ held
- realassets.ipe.com — PensionDanmark, PKA invest €800m in wind farm - News ↗ 2011-03 ◆ held
From Hafrok’s transactions record
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Revenue & offtake contract duration and price levels · money of the day
400 MW contracted — tender award
Installation how the build is going · from satellite counts and Hafrok’s registers
Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing110≈111 turbines + 1 platform expected · 2 fewer than expected — a position the survey missed
Surveyed2026-09-02≈from 89 satellite passes
Built2012 → 2013-Q3offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-07≈Copernicus Sentinel-1 radar satellite, northbound pass · 2 newer passes skipped because the satellite’s track only caught part of the farm (the best of them 80%)
Farm covered100%≈the whole farm lies inside the image
Structures ringed110 confirmed · 0 not yet confirmed≈as counted on 2026-09-02 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortPort of Grenaa ◆·installation and om · quay 350 m
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (110)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary

Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationAnholt A Transformer Platform·33/220 kV · in service 2012 · owner Energinet (Danish TSO)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
Sources & verification
15/18 fields verified · rests on 11 sources (5 primary) · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[1]
Energistyrelsen (Danish Energy Agency)2010-07-02◆ DEA: Anholt offshore wind farm will be l…
"This price is fixed for the delivery of the first 20 TWh, which approximates to 12-13 years of production" at 105.1 ore/kWh (~14 Ec/kWh). "DONG Energy was the sole bidder." Decision accepted by Minis…
supportsMechanismDetail
Operator1
[4]
Ørsted (DONG Energy)2014-09-04◆ Anholt Offshore Wind Farm reaches milest…
"The wind farm consists of a total of 111 wind turbines with a capacity of 3.6MW each. The total capacity is 400MW." "The wind farm has been erected during the period 2012-2013 and covers an area of 8…
supportsTurbinesUnit capacityTotal capacityFoundation
Financier1
[12]
Auction results1
[17]
Energistyrelsen2010-04-07◆ ens-anholt-bid-2010
"Fristen for bud på etablering af Anholt Havmøllepark på 400 MW udløb i dag den 7. april kl. 14. Energistyrelsen har modtaget et bud. DONG Energy A/S har i dag offentliggjort, at selskabet har indgive…
supportsTender award · Anholt Havmøllepark tender
Trade press7
[9]
offshoreWIND.biz2012-01-13◆ DONG Energy starts construction of Anhol…
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionOffshore constructionDistance from shore
[10]
[11]
[13]
[14]
offshoreWIND.biz2012-09-21
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[15]
[16]
Ørsted2025-03-31◆ Orsted — orsted factsheet asset book q1 …
“OFFSHORE - Asset Book updated as of 31 March 2025 ... Anholt (111 x SWT-3.6-120) | Pension Danmark, AIP Management | 399.6 | 399.6 | 199.8 | Pro rata | 50% | 50% | 2013 | Expired 2024, market price | …”
supportsTotal capacity