C-Power

Thornton Bank, ~30 km off the West Flanders coast.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record

4 dated milestones on the spine, each with its source · 7 recorded ownership deals from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓

Revenue & offtake contract terms, price levels and the route to market

the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓

Installation how the build is going · from sourced statements and Hafrok's registers

construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓

Sources & verification

Rests on 14 sources (9 primary) · ◆ 6 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator5
[1]
C-Power NV2025-01-01
“54 wind turbines with a total capacity of 325 MW ... Thornton Bank, situated in the North Sea, 30 km from the Belgian shoreline ... obtained all permits and licenses in 2003 and finalised the construc…”
supportsTurbinesTotal capacityDistance from shore
[2]
C-Power NV2025-01-01◆ Concession | C-Power
“In 2003 C-Power obtained a domain concession and the permits to build and operate an offshore wind farm in the Exclusive Economical Zone on the Belgian Continental Shelf.”
supportsConsentConsent granted
[3]
C-Power NV2025-01-01◆ Cables | C-Power
“The (150 kV) land cables are buried underground and run over a distance of 3,3 km, to the 'Slijkens' high-voltage station in Bredene, where they are connected to the main high-voltage grid.”
supportsStatusConnection point
[9]
SOCOFE2024-02-15
“la part détenue par C-POWER HOLDCO en C-POWER est passée de 53,9% à 63,3% [...] l'Allemand RWE (pour 26,7%) [...] du Français EDF (10%) [...] DEME CONCESSION WIND et NUHMA en ont profité pour transfér…”
supportsowneroperator
[18]
Royal Belgian Institute of Natural Sciences (MUMM)2026-10-12◆ MUMM permit register: milestones for the…
"C-POWER" ... "Environmental permit" ... "Granted" ... "Minister responsible for the marine environment" ... "2004-04-14T02:00:00+02:00"
supportsConsentConsent granted
Auction results1
[19]
RBINS / MUMM (Brabant, Degraer & Rumes, 2011 — Offshore wind farms in the Belgian part of the North Sea, ch. 2)2011◆ rbins-mumm-2011-belgian-owf-ch2
Table 1, "Overview of the dates when the projects were granted a domain concession and an environmental permit": C-Power 27/06/03 · Belwind 5/6/2007 · Eldepasco 15/5/2006 · Norther 5/10/2009 · Rentel …
supportsConcession · Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank)
Trade press8
[4]
offshoreWIND.biz2010-11-26◆ EUR 1,289 M Investment Financing for the…
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionTurbinesModelUnit capacityFoundation+2 more
[5]
NS Energy Business2022-01-01
Press report — cited, not quoted; read it at the source link.
supportsConstruction startUnit capacityFoundationWater depth
[6]
offshoreWIND.biz2013-09-17
Press report — cited, not quoted; read it at the source link.
supportsCOD history
[8]
CMS Law2024-01-01◆ CMS Expert Guide - Offshore wind in Belg…
“Offshore wind farms with financial close prior to 1 May 2014 can sell their Green Certificates to the TSO at a fixed minimum price of EUR 107 per MWh for the electricity that is generated from the fir…”
supportsMechanismDetail
[11]
Global Energy Monitor2026-07-02
supportsCoordinates
[12]
Power Technology
Press report — cited, not quoted; read it at the source link.
supportsCommercial operation
[13]
offshoreWIND.biz2013-09-18
Press report — cited, not quoted; read it at the source link.
supportsCommercial operation
[14]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Early access

Follow the offshore wind projects that matter to you.

Hafrok's data and analysis. Free while in early access.

  • The data, in full: the project database as an Excel workbook, Hafrok's expected delivery outlook on every project still to build, the full project records, the transaction database and the developer profiles
  • Hafrok Monitor: follow projects, developers or countries, and Hafrok Monitor mails you what moved on your list, with the source and the date: every Monday morning, or as it happens
  • Hafrok Commentary: analysis of the offshore wind market, when there is something to say