Ocean Wind 1

Would have been New Jersey first offshore wind farm. Located ~24 km off southern NJ coast (Cape May area). 98 turbines originally planned at 11-12 MW class.

Status
Cancelledlifecycle stage
Ownership
Ørsted — 100% 
Location
United States
Northwest Atlantic
Technology
Capacity 1,100 MW  Turbines 98 × 12 MW  Model GE Haliade X 12 MW  Foundation Monopile 
Site & conditions
Site rights Seabed rights held 
Origination BOEM Lease Sale 5 · 2015 ·
Water depth 18–28 m  Distance from shore 24 km 
Revenue & grid
Offtake OREC cancelled 
Grid
Schedule
COD

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2016’17’18’19’20’21’22’23’24’25’26BOEM Lease Sale 5 — awarded to RES America Developments, Inc.BOEM Lease Sale 5 Nov 2015 · auction recordView the source for Consent grantedConsent granted 21 Sep 2023 BOEM Lease Sale 5 — awarded to RES America Developments, Inc. 2015-11 ORIGINATIONRES America Developments, Inc. → Ørsted — 100% · closed 2016-05 2016-02-09 ACQUISITIONØrsted → PSEG — 25.0% · closed 2021-04 2020-12 FARMDOWNPSEG → Ørsted — 25.0% · closed 2023-05 2023-01 ACQUISITIONØrsted → None — stake not disclosed 2023-10 CANCELLATIONTODAYRES America Developments, Inc. RES America Development… RES America Development… exited 2016-02-09Ørsted — 100% today · operator Ørsted Ørsted 100%PSEG PSEG PSEG exited 2023-01BOEM Lease Sale 5 — awarded to RES America Developments, Inc. RES America Developments, Inc. → Ørsted — 100% · closed 2016-05 100%Ørsted → PSEG — 25.0% · closed 2021-04 25%PSEG → Ørsted — 25.0% · closed 2023-05 25%
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 202420252026-Q1 · 3 recorded revisions · slipped so far +1.6 yr (first announced 2024)

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageCancelled
Offshore constructionnot started
Expected start of operationnot stated

Sources & verification

4/16 fields verified · rests on 10 sources (7 primary) · ◆ 6 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[5]
Bureau of Ocean Energy Management2023-09-21◆ Ocean Wind 1 | Bureau of Ocean Energy Ma…
“On Sept. 21, 2023, BOEM approved the Construction and Operations Plan (COP) for the Ocean Wind 1 Offshore Wind Farm Project and its associated project easement.”
supportsConsentConsent granted
[19]
Bureau of Ocean Energy Management (BOEM)2026-08-23◆ US BOEM offshore-wind register (FR docum…
“Lease row OCS-A 0498: companies ['Ocean Wind LLC']; lease_dates ['03/01/2016']; lease_terms ['25 Years']; states ['New Jersey']; block_count 122.”
supportsRegister entry
Operator2
[2]
New Jersey Board of Public Utilities2019-06-21◆ Board of Public Utilities | Newsroom<br …
supportsMechanismDetail
[9]
Ørsted2023-10◆ document
supportsoperator
Trade press4
[11]
Tethys / PNNL2023
supportsTurbinesModelUnit capacity
[12]
Global Energy Monitor2026-07-02
supportsCoordinates
[13]
GEBCO Compilation Group2020
supportsWater depth
[16]
ROI-NJ2023-09-05◆ Ørsted official: Ocean Wind 1 remains on…
“Hina Kazmi, the Ocean Wind 1 program director for Ørsted ... “Ocean Wind 1 continues to advance, with onshore construction beginning in the next few weeks and offshore construction expected to ramp up…”
supportsCOD history
Unverified import1
[1]
unknown◆ document
supportsTurbinesModelUnit capacityTotal capacityFoundation+3 more
Encyclopaedic1
[10]
Wikipedia2023
supportsTotal capacityFoundationDistance from shore