New England Wind 2
Lease area OCS-A 0534 (same lease as NEW 1, different phase). Located ~50 km south of Cape Cod. Will use same Salem Harbor port as NEW 1.
Status
Early Developmentlifecycle stage
FragileHafrok completion outlook
Ownership
AVAvangrid Renewables — 100% ◆
Location
Northwest Atlantic
Technology
Capacity
1,259 MW ◇
Turbines
—
Foundation
Monopile ◇
Site & conditions
Site rights
Seabed rights held Seabed lease · Bureau of Ocean Energy Management (BOEM) · 2015-04 ◆
Water depth
49–59 m ≈
Wind speed
10.2 m/s @ 150 m ≈
Revenue & grid
Offtake
Other terminated ◇
Grid
—
Schedule
FID
Not taken
COD · announced
2031 ○
COD · Hafrok
2037 expected
Delivery outlook modelled by Hafrok · calibrated on delivered projects
2037
expected year of commercial operation
The developer says 2031; Hafrok expects 2037 — 6 years later.
Chance of delivery
≈28%
estimated chance this project reaches commercial operation
Early Development projects complete ≈61% of the time on Hafrok's record. This one sits well below that: a market with a thinner delivery record, its size and technical complexity. A secured offtake contract helps only slightly. That figure is then halved while Hafrok reads the United States route as closed: a route that has to be won again is less likely to be won.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
| Year | Probability |
|---|---|
| 2036 | 14.1% |
| 2037 (expected) | 28.0% |
| 2038 | 22.7% |
| 2039 | 14.6% |
| 2040 | 8.7% |
| 2041 | 5.1% |
| 2042 | 3.1% |
| 2043 | 1.8% |
| 2044 | 1.1% |
| 2045 | 0.7% |
How Hafrok got this date
1
No dated milestone yet
Nothing is consented or financed with a date, so the estimate starts from today (
2026), adds the time similar projects (in developing offshore-wind markets) took from consent to operation, plus an allowance for obtaining consent.2
Route closed until 2029
Hafrok believes no approval that opens a route to build is likely to be issued in the United States before a new administration takes office, which cannot happen before
January 2029. On that reading the clock for this project starts in 2029, not today: what it holds is kept, but Hafrok does not expect the process that turns it into a consent to begin before then. This is Hafrok's judgment, not a fact on the record — what it rests on: United States market page.3
Earliest credible date
Typical consent-to-operation time plus allowances, counted from
2029, means commercial operation before 2037 is not credible.4
Still needs an offtake award: US-NY-SOLICITATION-6
The project has no offtake contract yet. The next visible auction is pencilled for
2027 Q3, but on Hafrok's reading no round can award a route to build before 2029, so it is counted from then; winners typically reach final investment decision about 2 years after an award (2031), then build time on top gives 2034. The milestone timing is already later than that, so it stands.5
Result
Expected commercial operation
2037, likely range 2037–2042 (the middle half of outcomes for similar projects). With no milestone to build from, the earliest credible date is the estimate, with a deliberately wide range.6
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
7
Chance of delivery — separate from timing
Start from the share of Early Development projects that went on to complete — ≈61%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). About three in four early-stage projects with a final outcome went on to operate — a record from an easier era. Most of today's early pipeline is still unresolved, so the estimate discounts it. Then adjust for this project's own evidence — offtake, market, size, technical complexity — and halve the result while Hafrok reads the United States route as closed (a route that has to be won again is less likely to be won) — to ≈28%, which rates it
Fragile on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Acquisition · 2021-09
CIP → Avangrid 50%
- Stake
- 50%
- Consideration
- not disclosed
- Announced
- 2021-09
- Closed
- 2022-01
- Project stage
- early development
Companion record to New England Wind 1 (see above). Same Avangrid-CIP restructuring announced 21 September 2021, closed January 2022. OCS-A 0534 contained both the 804 MW Park City Wind (now New England Wind 1) and the 1,200 MW Commonwealth Wind (now New England Wind 2, at 1,259 MW in current configuration). Pro-rata allocation: 1,200 / 2,004 × USD 167.5m × 0.85 ≈ EUR 85m (indicative only; not recorded to prevent double-count). Avangrid is wholly owned by Iberdrola (merger completed December 2024, with Iberdrola acquiring remaining 18.4% for USD 2.55bn). Avangrid terminated the original Commonwealth Wind PPA with Massachusetts utilities in late 2022, citing cost escalation, and rebid under the New England Wind 2 name; contract status uncertain as of 2026.
Evidence
- avangrid.com — Avangrid Renewables and Copenhagen Infrastructure Partners Announce Strategic Transaction to Advance Offshore Wind Development ↗ 2021-09 ◆ held
- businesswire.com — Avangrid Renewables and Copenhagen Infrastructure Partners Announce Strategic Transaction to Advance Offshore Wind Development ↗ 2021-09 ◆ held
- offshoreWIND.biz — Avangrid and CIP Divvy Up 5.3 GW Wind Portfolio Offshore USA ↗ 2021-09 ◆ held
From Hafrok’s transactions record
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Revenue & offtake route to market — open
No offtake secured — route to market open
Utility PPA · Massachusetts Section 83C Round 3 awarded 2021-12, terminated. No live offtake on record. ◇
The routes describe what exists in this market — not a prediction of which the project will take. Timing math for the auction gate lives in the delivery outlook above.
Next visible round · from the auction calendar
NYSERDA Offshore Wind Solicitation 6 (NY6) ◇
design/RFI stage only; no timetable, conditioned on the federal market improving
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageEarly Development
Offshore constructionnot started
Expected start of operation2031
Sources & verification
2/11 fields verified · rests on 12 sources (2 primary) · ◆ 4 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[9]
Bureau of Ocean Energy Management (BOEM)2026-08-23◆ US BOEM offshore-wind register (FR docum…
“Lease row OCS-A 0561: companies ['Commonwealth Wind LLC']; lease_dates ['05/15/2024']; lease_terms ['25 Years']; states ['Massachusetts']; block_count 127.”
supportsRegister entry
[10]
Bureau of Ocean Energy Management (BOEM)2026◆ New England Wind 1 and 2 — BOEM state ac…
“Through a competitive leasing process (30 CFR 585.211), BOEM awarded Lease OCS-A 0501 to Vineyard Wind, LLC on April 1, 2015. [...] On May 15, 2024, the New England Wind project was segregated into tw…”
supportsSite rights
Auction results1
[11]
MA DOER / EDCs2021◆ us-ma-83c-r3
Massachusetts 83C Round 3 RFP - Commonwealth Wind (Avangrid terminated 2023).
supportsOfftake history
Auction pipeline1
[12]
Offshore Wind (offshorewind.biz)2026-02◆ ny-ny5-ended-2026
Press report — cited, not quoted; read it at the source link.
supportsNYSERDA Offshore Wind Solicitation 6 (NY6)
Trade press7
[2]
offshoreWIND.biz2024-04
Press report — cited, not quoted; read it at the source link.
supportsoperator
[3]
[4]
[5]
[6]
[7]
Utility Dive
Press report — cited, not quoted; read it at the source link.
supportsMechanismDetail
[8]
Unverified import1
[1]