New England Wind 1

Lease area OCS-A 0534, ~48 km south of Barnstable, MA. Export cable landfall at Craigville Beach, Barnstable.

Status
Advanced Developmentlifecycle stage
ProspectiveHafrok completion outlook
Ownership
ALAvangrid Power, LLC — 100% 
Location
United States
Northwest Atlantic
Technology
Capacity 791 MW 
Turbines
Foundation Monopile 
Site & conditions
Site rights Seabed rights held 
Origination BOEM Massachusetts Lease Sale (ATLW-4A) · 2018 ·
Water depth 44–57 m  Wind speed 10.2 m/s @ 150 m 
Revenue & grid
Offtake PPA  Grid Secured · 2024-05  Connection Eversource ISO-NE grid, landfall at Craigville Beach, Barnstable 
Schedule
FID Not taken
COD · announced 2030 
COD · Hafrok 2034 expected

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2034
expected year of commercial operation
The developer says 2030; Hafrok expects 2034 — 4 years later.
Chance of delivery
≈38% estimated chance this project reaches commercial operation
Advanced Development projects complete ≈75% of the time on Hafrok's record. This one sits well below that: a market with a thinner delivery record, its size and technical complexity. A secured offtake contract helps only slightly. That figure is then halved while Hafrok reads the United States route as closed: a route that has to be won again is less likely to be won.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2033: 14.1% (conditional on completion) 2034: 28.0% (conditional on completion) 2035: 22.7% (conditional on completion) 2036: 14.6% (conditional on completion) 2037: 8.7% (conditional on completion) 2038: 5.1% (conditional on completion) 2039: 3.1% (conditional on completion) 2040: 1.8% (conditional on completion) 2041: 1.1% (conditional on completion) 2042: 0.7% (conditional on completion)2026now202820302032203428%EXPECTED2036203820402042 Developer-announced COD: 2030 ANNOUNCED 2030
COD probability by year, conditional on completion
YearProbability
203314.1%
2034 (expected)28.0%
203522.7%
203614.6%
20378.7%
20385.1%
20393.1%
20401.8%
20411.1%
20420.7%
How Hafrok got this date
1
Starting point: the last dated milestone
Consent granted in 2024. From there Hafrok adds how long similar projects (in developing offshore-wind markets) took to reach commercial operation, measured on projects that have delivered.
2
Route closed until 2029
Hafrok believes no approval that opens a route to build is likely to be issued in the United States before a new administration takes office, which cannot happen before January 2029. On that reading this project's consent is treated as re-issued no earlier than 2029, and every step below starts from there. This is Hafrok's judgment, not a fact on the record — what it rests on: United States market page.
3
Typical timing
Starting point plus the typical remaining time gives a middle estimate of 2034; the faster quarter of similar projects would be done by 2032, the slower quarter not until 2034.
4
Result
Expected commercial operation 2034, likely range 2032–2034 (the middle half of outcomes for similar projects). The developer's announced date (2030) is earlier than similar projects have managed — Hafrok's own date is used and the difference is flagged above.
5
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
6
Chance of delivery — separate from timing
Start from the share of Advanced Development projects that went on to complete — ≈75%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Consented projects have historically completed at very high rates, but the 2023–25 downturn showed consented-but-unfinanced projects can still fail — the estimate holds back for the offtake and financing gates still ahead. Then adjust for this project's own evidence — offtake, market, size, technical complexity — and halve the result while Hafrok reads the United States route as closed (a route that has to be won again is less likely to be won) — to ≈38%, which rates it Prospective on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2019’20’21’22’23’24’25’26’27’28’29’30’31’32’33’34Developer-announced COD: 2030 announced COD 2030BOEM Massachusetts Lease Sale (ATLW-4A) — awarded to Vineyard Wind, LLCBOEM Massachusetts Lease Sale (ATLW-4A) Dec 2018 · auction recordView the source for Consent grantedConsent granted 1 Jul 2024 Commercial operation 2034 ·Hafrok expectedBOEM Massachusetts Lease Sale (ATLW-4A) — awarded to Vineyard Wind, LLC 2018-12 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDCIP → Avangrid — 50.0% · closed 2022-01 2021-09 ACQUISITIONTODAYVineyard Wind, LLC Vineyard Wind, LLC Vineyard Wind, LLC not among today’s recorded owners — no sale recordedCIP CIP CIP exited 2021-09Avangrid Power, LLC — 100% today · operator Avangrid Avangrid 100%BOEM Massachusetts Lease Sale (ATLW-4A) — awarded to Vineyard Wind, LLC Transfer(s) not in Hafrok's record — shown as a gap, never guessed. CIP → Avangrid — 50.0% · closed 2022-01 50%
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake contract duration and price levels · money of the day

1,595 MW contracted — utility PPA
Utility PPA · Connecticut Offshore Wind Procurement (PA 19-71) abandoned
Priceprice undisclosed ·Capacity804 MWAwardedDec 2019
Utility PPA · New England Multi-State Offshore Wind Solicitation (MA + RI)
Priceprice undisclosed ·Capacity791 MWAwardedSep 2024

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageAdvanced Development
Offshore constructionnot started
Expected start of operation2030

Sources & verification

6/13 fields verified · rests on 12 sources (8 primary) · ◆ 5 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[2]
Bureau of Ocean Energy Management (BOEM)2024-07-01◆ BOEM Approves Construction and Operation…
“BOEM approved the Construction and Operations Plan authorizing the construction and operation of two offshore wind energy facilities, known as New England Wind 1 and New England Wind 2, which together…”
supportsConsentConsent granted
[14]
Bureau of Ocean Energy Management (BOEM)2026-08-23◆ US BOEM offshore-wind register (FR docum…
“Lease row OCS-A 0534: companies ['Park City Wind LLC']; lease_dates ['05/15/2024']; lease_terms ['25 Years']; states ['Massachussets']; block_count 94.”
supportsRegister entry
Operator3
[4]
Avangrid / BusinessWire2024-09-06
"Avangrid was awarded 791 Megawatts (MW) by the Commonwealth of Massachusetts in the multi-state regional offshore wind solicitation." "If a power purchase agreement is signed and approved, then the p…
supportsCommercial operationTotal capacityMechanismDetail
[6]
Avangrid / BusinessWire (via The Energy Data)2024-05
“The Large Generator Interconnection Agreement (LGIA), executed with Eversource and ISO-NE, details the terms and conditions for interconnection service administered by the regional grid operator, and …”
supportsStatusConnection point
[13]
Iberdrola2026-02-24◆ Iberdrola — gsm26 annual accounts consol…
“On 3 September, the Federal Government filed motion to move to remand and vacate the Construction and Operations Plan for previously permitted offshore wind projects, including New England Wind 1. On …”
supportsoperator↳ parent
Auction results2
[15]
Connecticut General Assembly2019◆ us-ct-pa-19-71
Connecticut Public Act 19-71 - up to 2,000 MW; authority for Park City Wind.
supportsUtility PPA · Connecticut Offshore Wind Procurement (PA 19-71)
[16]
MA DOER & EDCs + RI + CT2023◆ us-ma-83c-r4
Massachusetts/multi-state 83C Round 4 RFP (MA/RI/CT coordinated, up to 3,600 MW).
supportsUtility PPA · New England Multi-State Offshore Wind Solicitation (MA + RI)
Trade press4
[9]
PNNL Tethys2024
supportsTotal capacityFoundation
[10]
Global Energy Monitor2026-07-02
supportsCoordinates
[11]
GEBCO Compilation Group2020
supportsWater depth
[12]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
supportsTotal capacityFoundationWater depthCoordinates