New England Aqua Ventus I
New England Aqua Ventus I (Maine, Monhegan state waters), floating pilot; UMaine + Cianbro; DOE grant halted 2025.
Status
On Holdlifecycle stage
FragileHafrok completion outlook
Ownership
NENew England Aqua Ventus — 100% ◇
Location
Northwest Atlantic
Technology
Capacity
11 MW ◇
Turbines
1 ◇
Foundation
Floating ◇
Site & conditions
Site rights
Not established we have not found a document granting or refusing rights over this seabed — a gap in our research, not a finding about the project ∅
Water depth
89–97 m ≈
Distance from shore
19.3 km ◇
Wind speed
9.7 m/s @ 150 m ≈
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Not taken
COD · Hafrok
—
Delivery outlook modelled by Hafrok · calibrated on delivered projects
—
on hold — no credible date; the chart shows when a restarted project might complete
Chance of delivery
≈6%
estimated chance this project reaches commercial operation
Projects put on hold complete ≈15% of the time on Hafrok's record. This one sits well below that: a market with a thinner delivery record, technical complexity and no offtake contract yet. Only a restart would change that — there is no dated schedule to judge against. That figure is then halved while Hafrok reads the United States route as closed: a route that has to be won again is less likely to be won.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
| Year | Probability |
|---|---|
| 2033 | 20.0% |
| 2034 | 20.0% |
| 2035 | 20.0% |
| 2036 | 20.0% |
| 2037 | 20.0% |
How Hafrok got this date
1
On hold — no dated schedule
The project is recorded as On Hold, so no sequence of milestones can be trusted. Hafrok publishes no expected year; the chart instead spreads the remaining chance of completion over the years a restarted project might finish in.
2
Route closed until 2029
Hafrok believes a held project in the United States is unlikely to resume before a route to build exists again, and does not expect one before
January 2029. On that reading the years the chart spreads the remaining chance over begin after 2029, not after today. This is Hafrok's judgment, not a fact on the record — what it rests on: United States market page.3
Chance of delivery — separate from timing
Start from the share of On Hold projects that went on to complete — ≈15%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Historically only a minority of projects put on hold returned to delivery — the estimate reflects that. Then adjust for this project's own evidence — offtake, market, size, technical complexity — and halve the result while Hafrok reads the United States route as closed (a route that has to be won again is less likely to be won) — to ≈6%, which rates it
Fragile on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).Installation how the build is going · from satellite counts and Hafrok’s registers
Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageOn Hold
Offshore constructionnot started
Expected start of operationnot stated
Sources & verification
0/12 fields verified · rests on 5 sources (4 primary)
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press5
[1]
[2]
[3]
[4]
[5]