Block Island Wind Farm

Located in Rhode Island state waters, 6 km from Block Island. 34 km submarine cable to mainland Narragansett, RI. Project cost ~$290M.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2015’16’17’18’19’20’21’22’23’24’25’26View the source for Consent grantedConsent granted 2014 View the source for Final investment decisionFinal investment decision Mar 2015 View the source for Onshore constructionOnshore construction 2015 View the source for Offshore constructionOffshore construction Jul 2015 View the source for First powerFirst power 2016-Q4 View the source for Commercial operationCommercial operation 2016-Q4 No origination on record — who held the site before the first recorded deal is not known; shown as a gap, never guessed. UNRECORDEDDeepwater Wind (D.E. Shaw Group) → Ørsted — 100.0% · closed 2018-11 2018-10 PORTFOLIOTODAYDeepwater Wind (D.E. Shaw Group) Deepwater Wind Deepwater Wind exited 2018-10Ørsted — 100% today · operator Ørsted Ørsted 100%Deepwater Wind (D.E. Shaw Group) → Ørsted — 100.0% · closed 2018-11 100%
Dashed tick marks today (9 Sep 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2016-Q42016-Q4 · 2 recorded revisions · held (announced 2016-Q4, unchanged)

Revenue & offtake contract duration and price levels · money of the day

30 MW contracted — utility PPA
Utility PPA · Rhode Island Block Island Wind Farm PPA (Deepwater Wind / National Grid)
Price$244/MWh ·Capacity30 MWAwarded2010

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2016-Q4
Offshore construction2015-07 → 2016-Q4
Construction ports
PortPort of Providence turbine assembly and staging

Sources & verification

15/18 fields verified · rests on 12 sources (6 primary) · ◆ 7 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator4
[1]
Ørsted A/S2018-12◆ Connecticut Regulators Approve Revolutio…
“Block Island, America's first offshore wind farm, comprises five General Electric 6MW turbines with a total capacity of 30MW. The Block Island wind farm, located 3 miles from Block Island, Rhode Islan…”
supportsCommercial operationCOD historyTurbinesUnit capacityTotal capacity+2 more
[2]
Ørsted A/S2021-02◆ Ørsted Annual Report 2020
“Deepwater Wind Block Island, LLC, Delaware, the US S 100 % Deepwater Wind Block Island Holdings, LLC, Delaware, the US S 100 % Deepwater Wind Block Island Transmission, LLC, Delaware, the US S 100 %”
supportsoperator
[4]
U.S. Department of the Interior2015-07-27◆ Secretary Jewell, Director Hopper Laud C…
"Steel in the water milestone for America's first commercial scale offshore wind farm. Five-turbine, 30-megawatt wind farm in state waters about three nautical miles southeast of Block Island. Turbine…
supportsConsentOnshore constructionOffshore constructionSite rightsConsent granted
[6]
U.S. Energy Information Administration2016-12◆ Federal leasing for offshore wind grows …
“The first commercial U.S. offshore wind farm, Block Island, is scheduled to come online in late 2016. Block Island consists of five wind turbines that will produce 30 megawatts (MW) of electricity. Al…”
supportsBackground
Auction results1
[13]
Wikipedia (citing RI PUC docket)2017◆ ri-block-2010-puc
In 2009 Deepwater signed a PPA with National Grid to sell power at an initial 24.4 c/kWh, with a guaranteed 3.5% annual increase.
supportsUtility PPA · Rhode Island Block Island Wind Farm PPA (Deepwater Wind / National Grid)
Trade press7
[3]
Ørsted A/S (via GlobeNewswire)2018-10-08◆ Ørsted acquires Deepwater Wind and creat…
“Block Island, America's first offshore wind farm, comprises five General Electric 6MW turbines with a total capacity of 30MW. The Block Island wind farm, located 3 miles from Block Island, Rhode Islan…”
supportsBackground
[5]
Offshore Energy2010-08-13
Press report — cited, not quoted; read it at the source link.
supportsMechanismDetail
[7]
Pacific Northwest National Laboratory (PNNL / Tethys)2024◆ Block Island Wind Farm | Tethys
“Installed capacity: 30 MW. Number of turbines: 5. Turbine model: Haliade 150-6 MW. Support structure: Jacket foundation (pile-driven). Distance from shore: 6.1 km. Water depth: 22-31 m. Construction s…”
supportsModelFoundationWater depthDistance from shoreCoordinates
[8]
Clean Energy States Alliance2018
“Deepwater Wind used four Rhode Island ports – Block Island, Galilee, Quonset Point and ProvPort – to complete construction and staging.”
supportsturbine assembly and staging
[9]
GlobalData / Power Technology2017
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decision
[10]
Marine Log2016-12-13
“DECEMBER 13, 2016 — America's first offshore wind farm is up and running. Deepwater Wind reported yesterday that the Block Island Wind Farm has completed its commissioning and testing phases and has b…”
supportsFirst power
[11]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed