Teesside
Located 1.5km off Coatham Sands, Redcar. Very near-shore. Round 1 development.
Status
Operationallifecycle stage
Ownership
Location
North Sea
Technology
Capacity
62 MW ◆
Turbines
27 × 2.3 MW ◆
Model
Siemens Swt 2-3-93 ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Origination
Crown Estate Round 1 · 2001 ·
Water depth
10–10 m ◆
Distance from shore
2 km ◆
Wind speed
8.5 m/s @ 100 m ≈
Revenue & grid
Offtake
Other ◆
Grid
Secured · 2013-Q3 ◆
Connection
Grid connection at Lackenby (Northern Electric Distribution); … ◆
Schedule
FID
Taken · date not recorded ∴
COD
Aug 2013 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2001-04
Crown Estate Round 1
- Awarded to
- EDF
- Basis
- seabed award
From the auction results — the round that created the project.
Farmdown · 2018-07
EDF Renewables → Dalmore Capital / Pensions Infrastructure Platform 49%
- Stake
- 49%
- Consideration
- not disclosed
- Announced
- 2018-07
- Closed
- 2018-Q3
- Project stage
- operational
EDF Renewables sold 49% of a portfolio of 24 UK wind farms (onshore and offshore, 550 MW total including Teesside at 62 MW) to Dalmore Capital (24.5%) and Pensions Infrastructure Platform (24.5%) for GBP 701m aggregate. EDF retained 51%.
Evidence
From Hafrok’s transactions record
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2013-Q3→2013-Q3 · 2 recorded revisions · held (announced 2013-Q3, unchanged)
Revenue & offtake the regime the project was built under
Offtake regime: ROC 2.0 ROCs/MWh
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing12≈27 turbines + 0 platforms expected · 15 fewer than expected — small or closely spaced early turbines fall below the radar threshold or merge into one return
Surveyed2026-09-01≈from 114 satellite passes
Built2012-02 → 2013-08offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-07≈Copernicus Sentinel-1 radar satellite, northbound pass
Farm covered100%≈the whole farm lies inside the image
Structures ringed12 confirmed · 0 not yet confirmed≈as counted on 2026-09-01 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortPort of Hartlepool ◆construction hub
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (12)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary

Sources & verification
17/18 fields verified · rests on 13 sources (11 primary) · ◆ 6 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[9]
legislation.gov.uk (The Renewables Obligation Order 2009 (Amendment) Order 2010, SI 2010/1107)2010◆ The Renewables Obligation (Amendment) Or…
“Offshore wind generating stations using relevant wind turbines … a wind turbine which, in the Authority's view, forms part of the station from a date no earlier than 1st April 2010 and no later than 3…”
supportsMechanismDetail
[16]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2514: Site Name "Teeside Offshore Wind Farm", Development Status "Operational", Installed Capacity 62 MWelec, Operator "EDF Energy - Northern Offshore Windfarm …”
supportsRegister entry
Operator7
[1]
Offshore Wind Biz2013-04-29
Press report — cited, not quoted; read it at the source link.
supportsFirst powerTurbinesUnit capacityTotal capacityStatus+2 more
[2]
Offshore Wind Biz2012-07-04
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionOffshore constructionTurbinesTotal capacityFoundation+1 more
[3]
Offshore Wind Biz2013-06-20
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionCOD historyTurbinesUnit capacityTotal capacity
[4]
EDF Power Solutions (EDF Renewables UK)2026-06-12◆ Teesside wind farm - EDF power solutions…
“North East England's first large scale commercial wind farm … 62 MW … 27 turbines … capable of powering approximately 54,000 homes … 22 local companies were involved in the project development.”
supportsCommercial operationTurbinesTotal capacity
[7]
PD Ports2013◆ PD Ports appointed as construction logis…
“PD Ports was appointed as the main construction logistics hub at the Port of Hartlepool for the Teesside Offshore Windfarm Project. Over seven months, the Port of Hartlepool was the focal point for al…”
supportsconstruction hub
[11]
BAILII / High Court (Admin)2008-07-11◆ R (Redcar and Cleveland BC) v EDF Energy…
“The claimant did not, in its letter of objection dated 3rd August 2004, or at any other time before the consent was issued on 17th September 2007, ask the defendant to hold a public inquiry. ... the d…”
supportsConsentConsent granted
[13]
EDF (Group press kit, Teesside Offshore Wind Farm)2014-04-16
“Offshore construction started in 2012 and was completed in July 2013. Commissioning was completed in August 2013 and handover to the Operations and Management team took place in October 2013.”
supportsCommercial operation
Trade press4
[10]
The Wind Power2026-06-05
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityWater depthDistance from shore+1 more
[12]
offshoreWIND.biz2018-07◆ EDF Renewables' Teesside OWF Gets Co-Own…
Press report — cited, not quoted; read it at the source link.
supportsoperatorowner
[14]
Offshore Wind Biz2018-08-08
Press report — cited, not quoted; read it at the source link.
supportsCommercial operation
[15]