Race Bank

Located 27km off North Norfolk coast in Greater Wash area. Round 2 development.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2004’05’06’07’08’09’10’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26Crown Estate Round 2 — awarded to CentricaCrown Estate Round 2 Dec 2003 · auction recordView the sources for Consent grantedConsent granted 5 Jul 2012 View the sources for Final investment decisionFinal investment decision 24 Jun 2015 View the source for Onshore constructionOnshore construction 2015 View the source for Offshore constructionOffshore construction 2016 View the sources for First powerFirst power May 2017 View the source for Commercial operationCommercial operation Feb 2018 Crown Estate Round 2 — awarded to Centrica 2003-12 ORIGINATIONCentrica → Ørsted — 100% · €61m 2013-12 ACQUISITIONØrsted → Macquarie (MEIF5 / Macquarie Capital) — 50% 2016-12 FARMDOWNMacquarie Capital → Sumitomo Corporation — 12.5% 2017 Macquarie Capital → Green Investment Group / Arjun Infrastructure Partners / Gravis Capital Management (advised funds) — 12.5% 2017 Sumitomo Corporation → Spring Infrastructure Capital (Sumitomo / SMBC / DBJ fund) — 12.5% 2019-02-14 Macquarie (MEIF5) / Spring Infrastructure → Norges Bank Investment Management (NBIM) — 37.5% · €390m · closed 2024-06 2024-04 TODAYCentrica Centrica Centrica exited 2013-12Ørsted — 50% today · operator Ørsted Ørsted 50%Macquarie (MEIF5 / Macquarie Capital) Macquarie Capital Macquarie Capital exited 2024-04Sumitomo Corporation Sumitomo Corporation Sumitomo Corporation exited 2019-02-14Green Investment Group Green Investment Group Green Investment Group exited 2017Arjun Infrastructure — 12.5% today · investor Arjun Infrastructure Arjun Infrastructure 12.5%Gravis Capital Management (advised funds) Gravis Capital Manageme… Gravis Capital Manageme… exited 2017Spring Infrastructure Capital (Sumitomo / SMBC / DBJ fund) Spring Infrastructure Spring Infrastructure exited 2024-04NBIM — 37.5% today · investor NBIM NBIM 37.5%Crown Estate Round 2 — awarded to Centrica Centrica → Ørsted — 100% · €61m 100%Ørsted → Macquarie (MEIF5 / Macquarie Capital) — 50% 50%Macquarie Capital → Sumitomo Corporation — 12.5% 12.5%Macquarie Capital → Green Investment Group / Arjun Infrastructure Partners / Gravis Capital Management (advised funds) — 12.5% Macquarie Capital → Green Investment Group / Arjun Infrastructure Partners / Gravis Capital Management (advised funds) — 12.5% Macquarie Capital → Green Investment Group / Arjun Infrastructure Partners / Gravis Capital Management (advised funds) — 12.5% 12.5% → consortiumSumitomo Corporation → Spring Infrastructure Capital (Sumitomo / SMBC / DBJ fund) — 12.5% 12.5%Macquarie (MEIF5) / Spring Infrastructure → Norges Bank Investment Management (NBIM) — 37.5% · €390m · closed 2024-06 Macquarie (MEIF5) / Spring Infrastructure → Norges Bank Investment Management (NBIM) — 37.5% · €390m · closed 2024-06 37.5% → consortium
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2018-Q12018-02 · 2 recorded revisions · held (announced 2018-Q1, unchanged)

Revenue & offtake the regime the project was built under

Offtake regime: ROC 1.8 ROCs/MWh until March 2037
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing9391 turbines + 1 platform expected · 1 more than expected — a met mast, a platform not on the register, or a position the survey missed
Surveyed2026-09-01from 118 satellite passes
Built2016 → 2018-02offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-07Copernicus Sentinel-1 radar satellite, northbound pass
Farm covered100%the whole farm lies inside the image
Structures ringed93 confirmed · 0 not yet confirmedas counted on 2026-09-01 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortPort of Grimsby (Grimsby Fish Dock construction base; East Coast Hub O&M)construction and om
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (93)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Race Bank, 2026-09-07
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationRace Bank offshore substations (2, described collectively)·220 AC (export) kV · in service 2018 · owner Diamond Transmission Partners Race Bank (OFTO); built by Race Bank Wind Farm Ltd (Ørsted-led)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
201820192020202120222023202420252026developer’s stated start 2018-Q1nowRace Bank offshore substations (2, described collectively)Race Bank offshore substations (2…in service 2018in service 2018

Sources & verification

14/18 fields verified · rests on 13 sources (11 primary) · ◆ 9 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[1]
Ofgem2016-09◆ Race Bank - Preliminary Information Memo…
“The ROW01 Offshore Wind Farm will be situated 27km north of Blakeney Point off the coast of Norfolk ... Race Bank Wind Farm Limited ... holds the marine licence for the ROW01 Offshore Wind Farm under …”
supportsConsentStatusConnection pointDistance from shoreCoordinates+2 more
[14]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2515: Site Name "Race Bank (Phase 1)", Development Status "Operational", Installed Capacity 289.8 MWelec, Operator "Orsted (formerly Dong Energy)/ Macquarie Gro…”
supportsRegister entry
Operator7
[2]
Ørsted A/S2018-02◆ Full power at Race Bank Offshore Wind Fa…
“Consists of 91 Siemens Gamesa 6 megawatt (MW) wind turbines. Total capacity of 573MW ... Installation of the wind turbines at Race Bank first began in May 2017, and following successful completion of …”
supportsFirst powerCommercial operationCOD historyTurbinesModel+3 more
[3]
Ørsted A/S2017-05◆ First power at Race Bank Offshore Wind F…
"Race Bank consists of 91 Siemens 6 megawatt (MW) turbines ... Construction of Race Bank is being managed from DONG Energy's construction base in the Grimsby Fish Docks." ... Electricity has been gene…
supportsFirst powerTurbinesModelUnit capacityconstruction and om
[4]
Centrica2012-07-05◆ Centrica receives Government consent for…
“05 July 2012 Centrica receives Government consent for Race Bank wind farm ... Centrica, the parent company of British Gas, today announced that its proposed Race Bank offshore wind farm project has…”
supportsConsentConsent granted
[5]
DONG Energy A/S2015-06-24
“DONG Energy to build Race Bank Offshore Wind Farm in the UK ... under the UK's ROC scheme (1.8 ROC) ... expected to be fully commissioned in 2018 ... 91 Siemens 6MW wind turbines with performance enha…”
supportsFinal investment decisionMechanismDetail
[6]
DONG Energy A/S2016-12-21◆ DONG Energy divests 50pct of Race Bank O…
“A final investment decision regarding the wind farm was taken by DONG Energy in June 2015. DONG Energy has entered into an agreement to sell 50% of Race Bank, a 573 megawatt (MW) UK offshore wind farm…”
supportsFinal investment decisionOnshore constructionOffshore construction
[10]
Ørsted A/S2025-02◆ Ørsted Annual Report 2024
“Race Bank Wind Farm Limited [2] The UK JO 50% ... Orsted Race Bank (Holding) Ltd The UK S 100%”
supportsoperator
[15]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-000213: "Race Bank Wind Farm", Status "Built", MW Connected 565, Effective From n/a, Customer "RACE BANK WIND FARM LIMITED"”
supportsRegister entry
Trade press4
[11]
Macquarie Group2024-06
“divest a 37.5 per cent stake in Race Bank Offshore Wind Farm to Norges Bank Investment Management”
supportsinvestor
[12]
GEBCO Compilation Group2020
supportsWater depth
[13]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[16]
Offshore Wind (offshorewind.biz)2016-06-30◆ Innovation Installs First Foundation at …
Press report — cited, not quoted; read it at the source link.
supportsFoundation