MachairWind

ScotWind Fixed category. Located northwest of Islay and west of Colonsay. ScottishPower's first west coast offshore project.

Status
Early Developmentlifecycle stage
ProspectiveHafrok completion outlook
Ownership
Location
United Kingdom
Northeast Atlantic
Technology
Capacity 2,000 MW 
Turbines
Foundation
Site & conditions
Site rights Seabed rights held 
Origination ScotWind Leasing · 2022 ·
Water depth 18–74 m  Wind speed 10.8 m/s @ 150 m 
Revenue & grid
Offtake
Grid Applied  Connection Machair 275/66kV Offshore Substation — NESO TEC register entry … 
Schedule
FID Not taken
COD · announced 2033 
COD · Hafrok 2033 expected

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2033
expected year of commercial operation
Chance of delivery
≈54% estimated chance this project reaches commercial operation
Early Development projects complete ≈61% of the time on Hafrok's record. This one sits well below that: a very large build and technical complexity. A secured offtake contract helps only slightly.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2032: 14.1% (conditional on completion) 2033: 28.0% (conditional on completion) 2034: 22.7% (conditional on completion) 2035: 14.6% (conditional on completion) 2036: 8.7% (conditional on completion) 2037: 5.1% (conditional on completion) 2038: 3.1% (conditional on completion) 2039: 1.8% (conditional on completion) 2040: 1.1% (conditional on completion) 2041: 0.7% (conditional on completion)2026now202820302032203328%2034203620382040 Developer-announced COD: 2033 — in line with Hafrok’s expected year ANNOUNCED = EXPECTED 2033
COD probability by year, conditional on completion
YearProbability
203214.1%
2033 (expected)28.0%
203422.7%
203514.6%
20368.7%
20375.1%
20383.1%
20391.8%
20401.1%
20410.7%
How Hafrok got this date
1
No dated milestone yet
Nothing is consented or financed with a date, so the estimate starts from today (2026), adds the time similar projects (in established offshore-wind markets) took from consent to operation, plus an allowance for obtaining consent.
2
Earliest credible date
Typical consent-to-operation time plus allowances means commercial operation before 2033 is not credible.
3
Still needs an offtake award: UK-CFD-AR8
The project has no offtake contract yet. The next visible auction is around 2026 Q4; winners typically reach final investment decision about 2 years after an award (2028 Q4), then build time on top gives 2031 Q4. The milestone timing is already later than that, so it stands.
4
Result
Expected commercial operation 2033, likely range 2033–2039 (the middle half of outcomes for similar projects). With no milestone to build from, the earliest credible date is the estimate, with a deliberately wide range.
5
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
6
Chance of delivery — separate from timing
Start from the share of Early Development projects that went on to complete — ≈61%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). About three in four early-stage projects with a final outcome went on to operate — a record from an easier era. Most of today's early pipeline is still unresolved, so the estimate discounts it. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈54%, which rates it Prospective on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2022’23’24’25’26’27’28’29’30’31’32’33Developer-announced COD: 2033 announced COD 2033ScotWind Leasing — awarded to Scottish Power RenewablesScotWind Leasing Jan 2022 · auction recordView the source for Consent appliedConsent applied 2026 Commercial operation 2033 ·Hafrok expectedScotWind Leasing — awarded to Scottish Power Renewables 2022-01 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYScottish Power Renewables Scottish Power Renewabl… Scottish Power Renewabl… not among today’s recorded owners — no sale recordedScottishPower Renewables — 100% today · operator ScottishPower Renewables ScottishPower Renewables 100%ScotWind Leasing — awarded to Scottish Power Renewables Transfer(s) not in Hafrok's record — shown as a gap, never guessed.
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake route to market — open

No offtake secured — route to market open
The routes describe what exists in this market — not a prediction of which the project will take. Timing math for the auction gate lives in the delivery outlook above.
CfD allocation round
The UK's principal route — a 15-year, CPI-indexed, two-sided CfD awarded in annual competitive rounds.
Next visible round · from the auction calendar
CfD Allocation Round 8
expected H2 2026 · scheduled · the round’s published documents do not name this project
AR8 confirmed (gov update, Mar 2026) to OPEN July 2026 — brought forward from the earlier mid/late-2026 expectation
Corporate PPA
Bilateral long-term offtake with corporate buyers; can cover part of output alongside or ahead of a CfD.
Merchant
Uncontracted sale into the wholesale market — no price floor, full exposure to power prices.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageEarly Development
Offshore constructionnot started
Expected start of operation2033

Sources & verification

4/10 fields verified · rests on 14 sources (5 primary) · ◆ 5 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[16]
Scottish Government Marine Directorate (MD-LOT)2026-08-23◆ Scottish MD-LOT marine projects register…
“Register row "MachairWind project (Scotwind W1)" (key node/23854): Application stage "Licence", type "Renewables - Wind".”
supportsRegister entry
Operator2
[8]
NESO2026-06-12◆ NESO Transmission Entry Capacity (TEC) R…
“Machair Offshore Wind Farm,SCOTTISHPOWER RENEWABLES (UK) LIMITED,Machair 275/66kV Offshore Substation,,0,2000,2000,16/09/2033,Scoping,Direct Connection,SPT,Wind Offshore”
supportsTotal capacityStatusConnection point
[14]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-001392: "Machair Offshore Wind Farm", Status "Scoping", MW Connected 0, Effective From 2033-09-16, Customer "SCOTTISHPOWER RENEWABLES (UK) LIMITED"”
supportsRegister entry
Auction pipeline1
[17]
DESNZ (gov.uk)2026◆ govuk-cfd-ar8
gov.uk AR8 collection — Allocation Framework, statutory framework and CIB documents published ahead of the round.
supportsCfD Allocation Round 8
Trade press9
[5]
Offshore Wind Biz2023-04-17
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity
[6]
Renewable Energy Magazine2024-10-17
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity
[7]
Offshore Wind Biz2025-04-02
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity
[9]
Ocean Energy Resources2026-06
Press report — cited, not quoted; read it at the source link.
supportsoperator
[10]
Power Technology2026
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity
[11]
Global Energy Monitor2026-07-02
supportsCoordinates
[12]
GEBCO Compilation Group2020
supportsWater depth
[13]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[15]
Iberdrola2026-07◆ Iberdrola — report 26H1
“MachairWind has also submitted a consent application for the offshore wind farm area”
supportsConsentConsent applied
Unverified import1
[1]
unknown
supportsCommercial operationTotal capacityWater depthCoordinates