Located off the Kent coast in the outer Thames Estuary, approximately 8.8 km north of Herne Bay and 9.5 km north of Whitstable.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2001’02’03’04’05’06’07’08’09’10’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26Crown Estate Round 1 — awarded to VattenfallCrown Estate Round 1 Apr 2001 · auction recordView the sources for Consent grantedConsent granted Mar 2003 View the source for Final investment decisionFinal investment decision 2004 View the sources for Offshore constructionOffshore construction 2004 View the source for First powerFirst power 2005-Q3 View the sources for Commercial operationCommercial operation 2005-Q4 Crown Estate Round 1 — awarded to Vattenfall 2001-04 ORIGINATIONTODAYVattenfall — 100% today · operator Vattenfall Vattenfall 100%Crown Estate Round 1 — awarded to Vattenfall
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake the regime the project was built under

Offtake regime on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing3030 turbines + 0 platforms expected · every expected structure seen
Surveyed2026-09-01from 118 satellite passes
Built2004 → 2005-Q4offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-07Copernicus Sentinel-1 radar satellite, northbound pass
Farm covered100%the whole farm lies inside the image
Structures ringed30 confirmed · 0 not yet confirmedas counted on 2026-09-01 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortWhitstable Harbour O&M base
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (30)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Kentish Flats, 2026-09-07

Sources & verification

17/18 fields verified · rests on 8 sources (5 primary) · ◆ 5 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator3
[1]
Companies House (UK)2018-08-23◆ KENTISH FLATS LIMITED persons with signi…
“Vattenfall Wind Power Ltd holds ownership of shares – 75% or more, voting rights – 75% or more. Notified on August 23, 2018. Ceased PSC: Vattenfall Vindkraft Ab (same date — corporate restructuring wi…”
supportsoperator
[2]
European Commission (DG Competition)2005-12-22◆ M3867 20051222 20310 En
“Only a very small amount of this, all wind power, is situated outside Denmark: Sweden [20-30]MW, Germany [30-40]MW, UK [80-90] MW, Poland [25-35] MW.”
supportsBackground
[8]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2492: Site Name "Kentish Flats", Development Status "Operational", Installed Capacity 90 MWelec, Operator "Vattenfall"”
supportsRegister entry
Operator2
[3]
Vattenfall2025◆ Power plants: Kentish Flats - Vattenfall
“Kentish Flats is a 90 MWe offshore wind farm with 30 turbines. The average water depth is five metres. The site can be easily accessed from the local maintenance port at Whitstable, which is only 30 m…”
supportsTurbinesTotal capacityMechanismDetailO&M base
[4]
Vattenfall2025◆ Celebrating 20 years of wind power in Ke…
“It's been 20 years since Vattenfall's Kentish Flats Wind Farm began generating power off the coast of Thanet on the South-East coast of England.”
supportsFirst power
Trade press3
[5]
Modern Power Systems2006
“Take-over certificate for Kentish Flats was signed on 8 December 2005, marking its entry into commercial operation. Fully consented in March 2003. Site work commenced summer 2004. Foundation installat…”
supportsConsentFinal investment decisionOffshore constructionCommercial operationTurbines+7 more
[6]
NS Energy Business2006
Press report — cited, not quoted; read it at the source link.
supportsConsentOffshore constructionCommercial operationTurbinesModel+6 more
[7]
DTU Wind Energy / World Bank (Global Wind Atlas)2026