Hywind Scotland

Located 25km off Peterhead, Aberdeenshire. Spar-buoy floating foundations anchored in 95-129m water depth. Batwind battery storage system also installed.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2016’17’18’19’20’21’22’23’24’25’26View the source for Consent grantedConsent granted 30 Oct 2015 View the source for Final investment decisionFinal investment decision Nov 2015 View the sources for Offshore constructionOffshore construction Jul 2017 View the source for First powerFirst power Oct 2017 View the source for Commercial operationCommercial operation 18 Oct 2017 No origination on record — who held the site before the first recorded deal is not known; shown as a gap, never guessed. UNRECORDEDEquinor → Masdar — 25% · €62m · closed 2017-Q2 2017-01 FARMDOWNTODAYEquinor — 75% today · operator Equinor Equinor 75%Masdar — 25% today · co-owner Masdar Masdar 25%Equinor → Masdar — 25% · €62m · closed 2017-Q2 25%
Dashed tick marks today (9 Sep 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake the regime the project was built under

Offtake regime: ROC 3.5 ROCs/MWh (floating demonstrator)
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing55 turbines + 0 platforms expected · every expected structure seen
Surveyed2026-09-01from 91 satellite passes
Built2017-07 → 2017-10-18offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-07Copernicus Sentinel-1 radar satellite, northbound pass
Farm covered100%the whole farm lies inside the image
Structures ringed5 confirmed · 0 not yet confirmedas counted on 2026-09-01 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortStord ·assembly and tow-out · quay 800 m · crane 1050 t · draft 16 m
PortPeterhead operations base
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (5)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Hywind Scotland, 2026-09-07

Sources & verification

17/18 fields verified · rests on 13 sources (8 primary) · ◆ 8 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator4
[1]
Marine Scotland2015-10-30◆ Hywind Scotland Pilot Park - Marine Lice…
“Subject to the conditions set out in the Marine Licence (05515/15/0) the Licensing Authority grant a licence under Part 4 of the Marine (Scotland) Act 2010 and under Part 4 of the Marine and Coastal A…”
supportsConsentDistance from shoreConsent granted
[2]
Marine Scotland2015-10-30◆ Hywind Scotland Pilot Park - Marine Lice…
“The Development will involve the installation of five 6 MW wind turbine generator units [...] with a draught of no less than 70 m to no more than 85 m and a rotor diameter of 154 m. [...] The Licensee…”
supportsTurbinesUnit capacityTotal capacityFoundationStatus+4 more
[16]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2479: Site Name "Hywind Scotland Pilot Park (Hywind 2) Demonstrator", Development Status "Operational", Installed Capacity 30 MWelec, Operator "Statoil"”
supportsRegister entry
[17]
Scottish Government Marine Directorate (MD-LOT)2026-08-23◆ Scottish MD-LOT marine projects register…
“Register row "Hywind Scotland Pilot Park" (key ml/hywind-scotland-pilot-park): Application stage "Post-consent", type "Renewables - Wind".”
supportsRegister entry
Operator4
[4]
Equinor (Statoil)2017-10-18◆ World's first floating wind farm has sta…
"Hywind Scotland, the first floating wind farm in the world, has started to deliver electricity to the Scottish grid. Today the First Minister of Scotland, Nicola Sturgeon, officially opens the wind f…
supportsFirst powerCommercial operation
[7]
Equinor2024-10-01◆ Hywind Scotland - the world’s first floa…
“Hywind Scotland is the world's first floating offshore wind farm. [...] 30 MW. [...] Water depth 95-120 m. [...] Average wave height 1.8 m. [...] Export cable approximately 30 km.”
supportsWater depth
[8]
Equinor2022-10-18◆ Equinor marks 5 years of operations at w…
“Hywind Scotland, the world's first floating offshore wind farm [...] achieving a capacity factor of 54% over its five years of operations.”
supportsBackground
[13]
Masdar2023
“Masdar has a 25 per cent stake in the 30MW project, along with lead operator Equinor, which owns 75 per cent.”
supportsoperatorco-owner
Trade press5
[3]
offshoreWIND.biz2015-11-03◆ Statoil Sets Aside EUR 214 Million for H…
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionWater depth
[9]
offshoreWIND.biz2017-05-29
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionSite rightsassembly and tow-out
[10]
Renewable Energy Foundation2021-08-01
“two floating offshore wind farms, Hywind and Kincardine, which receive 3.5 ROCs per MWh”
supportsMechanismDetail
[14]
offshoreWIND.biz2017-07-24
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionSite rightsModel
[15]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed