Dudgeon
Located 32km north of Cromer, Norfolk.
Status
Operationallifecycle stage
Location
North Sea
Technology
Capacity
402 MW ◆
Turbines
67 × 6 MW ◆
Model
Siemens Swt 6-0-154 ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Origination
Crown Estate Round 2 · 2003 ·
Water depth
18–25 m ◆
Distance from shore
32 km ◆
Wind speed
9.8 m/s @ 100 m ≈
Revenue & grid
Offtake
CfD · FIDeR · £150/MWh ◆
Grid
Secured · 2016 ◆
Connection
Necton substation, Breckland, Norfolk (132 kV → 400 kV National … ◆
Schedule
FID
Jul 2014 ◆
COD
Oct 2017 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2003-12
Crown Estate Round 2
- Awarded to
- Equinor / Masdar / Statkraft
- Basis
- seabed award
From the auction results — the round that created the project.
Farmdown · 2014-09
Equinor → Masdar 35%
- Stake
- 35%
- Consideration
- not disclosed
- Announced
- 2014-09
- Project stage
- pre-FID
Masdar acquired 35% (half of Statoil's 70% holding). Announced at UN Climate Summit, Sep 2014. The GBP 525m headline figure described as "investment" — includes equity + project funding commitment, not separable. Statoil and Statkraft had acquired 100% from Warwick Energy in Oct 2012 (70/30 split). FID taken Mar 2015. Ownership after: Statoil 35%, Masdar 35%, Statkraft 30%.
Evidence
From Hafrok’s transactions record
Divestment · 2017-12
Statkraft → China Resources 30%
- Stake
- 30%
- Consideration
- €633m
- Implied 100% value
- €2,109m
- Implied
- €5.25m / MW
- Announced
- 2017-12
- Closed
- 2018-03
- Project stage
- operational
Statkraft's complete exit from offshore wind. GBP 555m for 30% of operational Dudgeon. Fully commissioned Oct 2017 (67x Siemens 6MW). Statkraft booked gain of NOK 5,106m. High implied EUR/MW reflects ROC subsidy regime (1.8 ROCs/MWh) which provides higher effective revenue than CfD. Originally reported GBP 555m, converted at GBP/EUR ~1.14 (2017). Ownership after: Equinor 35%, Masdar 35%, China Resources 30%.
Evidence
From Hafrok’s transactions record
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Revenue & offtake contract duration and price levels · money of the day
402 MW contracted — investment contract
● Investment contract · FID Enabling for Renewables (FIDeR) investment contracts
Price£150/MWh ·Basis2012 real · CPI-indexed
Capacity402 MWAwardedApr 2014Term15 yrs · delivery 2016/17
Money-of-the-day values computed by Hafrok from the United Kingdom CPI index, 2012 real base — actual to 2026-07, then an assumed +2.0%/yr (central-bank target). Investment contract terms run 15 years from start of generation in the contracted delivery year.
Contract price over time · £/MWh
solid = actual CPI indexation · dashed = assumed +2.0%/yr
Investment contract · FID Enabling for Renewables (FIDeR) investment contracts
Installation how the build is going · from satellite counts and Hafrok’s registers
Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing68≈67 turbines + 1 platform expected · every expected structure seen
Surveyed2026-09-01≈from 114 satellite passes
Built2016 → 2017-10offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-07≈Copernicus Sentinel-1 radar satellite, northbound pass
Farm covered100%≈the whole farm lies inside the image
Structures ringed68 confirmed · 0 not yet confirmed≈as counted on 2026-09-01 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortGreen Port Hull ◆turbine staging
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (68)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary

Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationDudgeon Offshore Substation·132 kV · in service 2017 · owner TC Dudgeon OFTO Plc (Transmission Capital Partners — International Public Partnerships, Amber Infrastructure, Transmission Investment); built by Equinor / Masdar / China Resources
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
Sources & verification
17/18 fields verified · rests on 16 sources (14 primary) · ◆ 7 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator3
[2]
Dudgeon Offshore Wind (referencing DECC consent)2012-07
“The Dudgeon Offshore Wind Farm was consented under a Department of Energy and Climate Change Section 36 consent (Electricity Act 1989). The operator site notes that "by late 2012 all these consents we…”
supportsConsentConsent granted
[13]
DECC / UK Government2014◆ FIDeR Successful Projects offered an inv…
“Dudgeon listed among successful FIDeR projects awarded an investment contract under the FID Enabling for Renewables scheme, confirming the CfD mechanism and commissioning target band.”
supportsMechanismDetail
[17]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2538: Site Name "Dudgeon East", Development Status "Operational", Installed Capacity 402 MWelec, Operator "Statoil / Statkraft"”
supportsRegister entry
Operator8
[3]
Dudgeon Offshore Wind2014-07-01
"Statoil and Statkraft have decided to start building the Dudgeon Offshore Wind Farm off the coast of Norfolk, UK." The total investment was estimated at £1.5 billion. The decision was made on 1 July …
supportsFinal investment decision
[4]
Dudgeon Offshore Wind2015-03-26
"Work has now commenced in Norfolk to install the underground cables and construct the substations that will enable electricity produced by the Dudgeon Offshore Wind Farm to be distributed into the UK…
supportsOnshore constructionOffshore construction
[5]
Dudgeon Offshore Wind2017-01-08
“Saturday night the first of 67 wind turbines was installed at the Dudgeon offshore Windfarm off Norfolk, UK. The turbine was installed by the vessel Sea Challenger from A2Sea, that sailed away from th…”
supportsturbine staging
[6]
Equinor (then Statoil)2017-02-07◆ First electricity delivered from Dudgeon…
"This is a significant milestone for one of the largest offshore wind farms in Europe." First electricity delivered from the initial wind turbine to the UK National Grid on February 9, 2017 — the firs…
supportsFirst power
[8]
Equinor2017-11-21◆ Dudgeon offshore wind farm officially op…
"All 67 turbines at the 402MW Dudgeon offshore wind farm are now delivering electricity to the UK grid, providing renewable energy to around 410,000 homes." Official opening ceremony held 21 November …
supportsCommercial operation
[11]
Dudgeon Offshore Wind2017
"The site at Necton also includes the National Grid infrastructure which enables the 402MW of electricity generated by the wind farm to enter the National Grid distribution network." Substation built …
supportsStatusConnection point
[12]
National Audit Office2014-06◆ Early contracts for renewable electricit…
"Administrative strike prices by commissioning date and technology (2012 GBP/MWh)" - Offshore wind: 2016-17 150; 2017-18 140; 2018-19 140. FIDeR strikes are CPI-indexed; the same strike applies to all…
supportsMechanismStrike / priceDetail
[18]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-000132: "Dudgeon Offshore Wind Farm", Status "Built", MW Connected 400, Effective From n/a, Customer "DUDGEON OFFSHORE WIND LIMITED"”
supportsRegister entry
Auction results1
[19]
Low Carbon Contracts Company (LCCC)2026-07-31◆ lccc-portfolio-status-2026-07
Investment Contract units, all 'Live (Post-FIC)': INV-BUR-001 Burbo Bank Extension; INV-DUD-001/002/003 Dudgeon; INV-WAL-001/002 Walney Extension; INV-BEA-001/002 Beatrice; INV-HOR-001/002/003 Hornsea…
supportsInvestment contract · FID Enabling for Renewables (FIDeR) investment contracts
Trade press4
[1]
NS Energy Business2017
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityTotal capacityFoundation+3 more
[7]
Offshore Wind Biz2017-10-12
Press report — cited, not quoted; read it at the source link.
supportsCommercial operation
[15]
Dudgeon Offshore Wind2025
“Dudgeon Offshore Wind Limited, which holds the licences and consents to enable it to construct the Dudgeon Offshore Wind Farm, is owned by Norwegian company Equinor, China Resources (Holdings) Co. Ltd…”
supportsoperatorowner
[16]