Celtic Sea - Ocean Winds Project

Crown Estate Round 5. Completes 4.5GW Round 5 capacity with Equinor and Gwynt Glas. Off South Wales/SW England coast.

Status
Early Developmentlifecycle stage
ProspectiveHafrok completion outlook
Ownership
Ocean Winds — 100% 
Location
United Kingdom
Celtic Sea
Technology
Capacity 1,500 MW 
Turbines
Foundation Floating 
Site & conditions
Site rights Seabed rights held 
Origination Crown Estate Round 5 · 2025 ·
Water depth 71–88 m  Wind speed 10.1 m/s @ 150 m 
Revenue & grid
Offtake
Grid No agreement  Connection Not in TEC register. No grid connection agreement. 
Schedule
FID Not taken
COD · announced 2035 
COD · Hafrok 2035 expected

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2035
expected year of commercial operation
Chance of delivery
≈52% estimated chance this project reaches commercial operation
Early Development projects complete ≈61% of the time on Hafrok's record. This one sits well below that: a very large build and technical complexity. A secured offtake contract helps only slightly.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2034: 14.1% (conditional on completion) 2035: 28.0% (conditional on completion) 2036: 22.7% (conditional on completion) 2037: 14.6% (conditional on completion) 2038: 8.7% (conditional on completion) 2039: 5.1% (conditional on completion) 2040: 3.1% (conditional on completion) 2041: 1.8% (conditional on completion) 2042: 1.1% (conditional on completion) 2043: 0.7% (conditional on completion)2026now2028203020322034203528%2036203820402042 Developer-announced COD: 2035 — in line with Hafrok’s expected year ANNOUNCED = EXPECTED 2035
COD probability by year, conditional on completion
YearProbability
203414.1%
2035 (expected)28.0%
203622.7%
203714.6%
20388.7%
20395.1%
20403.1%
20411.8%
20421.1%
20430.7%
How Hafrok got this date
1
No dated milestone yet
Nothing is consented or financed with a date, so the estimate starts from today (2026), adds the time similar projects (floating, in established offshore-wind markets) took from consent to operation, plus an allowance for obtaining consent.
2
Earliest credible date
Typical consent-to-operation time plus allowances means commercial operation before 2034 is not credible.
3
Still needs an offtake award: UK-CFD-AR8
The project has no offtake contract yet. The next visible auction is around 2026 Q4; winners typically reach final investment decision about 2 years after an award (2028 Q4), then build time on top gives 2032 Q4. The milestone timing is already later than that, so it stands.
4
Result
Expected commercial operation 2035, likely range 2035–2041 (the middle half of outcomes for similar projects). With no milestone to build from, the earliest credible date is the estimate, with a deliberately wide range.
5
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
6
Chance of delivery — separate from timing
Start from the share of Early Development projects that went on to complete — ≈61%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). About three in four early-stage projects with a final outcome went on to operate — a record from an easier era. Most of today's early pipeline is still unresolved, so the estimate discounts it. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈52%, which rates it Prospective on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2026’27’28’29’30’31’32’33’34’35Developer-announced COD: 2035 announced COD 2035Crown Estate Round 5 — awarded to Ocean Winds — EDPR + ENGIE joint ventureCrown Estate Round 5 Jun 2025 · auction recordCommercial operation 2035 ·Hafrok expectedCrown Estate Round 5 — awarded to Ocean Winds — EDPR + ENGIE joint venture 2025-06 ORIGINATIONTODAYOcean Winds — 100% today Ocean Winds Ocean Winds 100%Crown Estate Round 5 — awarded to Ocean Winds — EDPR + ENGIE joint venture
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake route to market — open

No offtake secured — route to market open
The routes describe what exists in this market — not a prediction of which the project will take. Timing math for the auction gate lives in the delivery outlook above.
CfD allocation round
The UK's principal route — a 15-year, CPI-indexed, two-sided CfD awarded in annual competitive rounds.
Next visible round · from the auction calendar
CfD Allocation Round 8
expected H2 2026 · scheduled · the round’s published documents do not name this project
AR8 confirmed (gov update, Mar 2026) to OPEN July 2026 — brought forward from the earlier mid/late-2026 expectation
Corporate PPA
Bilateral long-term offtake with corporate buyers; can cover part of output alongside or ahead of a CfD.
Merchant
Uncontracted sale into the wholesale market — no price floor, full exposure to power prices.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageEarly Development
Offshore constructionnot started
Expected start of operation2035

Sources & verification

8/11 fields verified · rests on 6 sources (3 primary) · ◆ 4 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator3
[1]
The Crown Estate2025-11-19◆ Celtic Sea Round 5 - third site direct a…
“Ocean Winds, the 50-50 joint venture between EDPR and ENGIE, is set to be awarded the rights for a third floating offshore wind site in the Celtic Sea by The Crown Estate. The capacity of each PDA is …”
supportsConsentTotal capacityStatusConnection point
[2]
Ocean Winds2025-11-19◆ Ocean Winds to Develop Third Floating Of…
“The 358 km2 site will allow the development of a floating offshore wind project located in water depths of 71 – 88 metres. The project could be delivered in phases, with a final capacity of up to 1.5 …”
supportsFoundationWater depth
[3]
Ocean Winds2026-03-03◆ Ocean Winds Signs Agreement for Lease fo…
“Ocean Winds (OW), the 50-50 joint venture between EDPR and ENGIE, has signed an Agreement for Lease with The Crown Estate for a floating offshore wind project site in the Celtic Sea. The project will …”
supportsCommercial operation
Auction pipeline1
[6]
DESNZ (gov.uk)2026◆ govuk-cfd-ar8
gov.uk AR8 collection — Allocation Framework, statutory framework and CIB documents published ahead of the round.
supportsCfD Allocation Round 8
Trade press2
[4]
offshoreWIND.biz2026-03
Press report — cited, not quoted; read it at the source link.
supportsowner
[5]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed