Burbo Bank

Round 2 development on Burbo Flats, Liverpool Bay, Irish Sea.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2001’02’03’04’05’06’07’08’09’10’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26Crown Estate Round 1 — awarded to DONG Energy (now Ørsted)Crown Estate Round 1 Apr 2001 · auction recordView the source for Consent grantedConsent granted 9 Jul 2003 View the source for Onshore constructionOnshore construction 2007 View the source for First powerFirst power Jul 2007 View the source for Commercial operationCommercial operation Oct 2007 Crown Estate Round 1 — awarded to DONG Energy (now Ørsted) 2001-04 ORIGINATIONTODAYØrsted — 100% today · operator Ørsted Ørsted 100%Crown Estate Round 1 — awarded to DONG Energy (now Ørsted)
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake the regime the project was built under

Offtake regime: ROC 1.5 ROCs/MWh
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing2525 turbines + 0 platforms expected · every expected structure seen
Surveyed2026-09-01from 119 satellite passes
Built2007-10offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-07Copernicus Sentinel-1 radar satellite, southbound pass
Farm covered100%the whole farm lies inside the image
Structures ringed25 confirmed · 0 not yet confirmedas counted on 2026-09-01 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortPort of Mostyn assembly marshalling
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (25)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Burbo Bank, 2026-09-07

Sources & verification

10/18 fields verified · rests on 11 sources (5 primary) · ◆ 6 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[1]
DESNZ2024-04-08◆ Burbo Bank - Section 36C Consent Variati…
"the consent granted by the Secretary of State under section 36 of the Electricity Act 1989 on 9 July 2003 ("the Section 36 Consent") to construct and operate a 90MW offshore wind farm generating stat…
supportsConsentConsent granted
[11]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2487: Site Name "Burbo Bank", Development Status "Operational", Installed Capacity 90 MWelec, Operator "Orsted (formerly Dong Energy)"”
supportsRegister entry
Operator3
[2]
Ørsted (DONG Energy)2007-10-18◆ Inauguration of DONG Energy's Burbo Bank…
“The wind farm consists of 25 3.6 MW Siemens wind turbines, with a total production capacity of 90 MW. The 25 wind turbines will be able to produce 315 million kWh annually, which is equivalent to the …”
supportsTurbinesUnit capacityTotal capacityMechanismDetail
[5]
Ørsted A/S2016-11-21◆ First power from DONG Energys Burbo Bank…
“Its Burbo Bank Offshore Wind Farm was inaugurated in 2007 and was the first to use the 3.6MW wind turbines now used widely across the industry. DONG Energy has been operating out of Liverpool Bay for …”
supportsBackground
[12]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-001298: "Burbo Bank Offshore Wind Farm", Status "Built", MW Connected 90, Effective From n/a, Customer "ORSTED BURBO (UK) LIMITED"”
supportsRegister entry
Trade press5
[3]
Power Magazine2007◆ Burbo Bank Offshore Wind Farm, Liverpool…
"25 3.6-MW Siemens Power Generation (SPG) SWT-3.6-107 turbines ... first produced power on July 21 and was commissioned on October 18 [2007] ... each tower supporting a turbine is anchored to the seab…
supportsFinal investment decisionOnshore constructionFirst powerCommercial operationTurbines+7 more
[4]
Power Technology2007
Press report — cited, not quoted; read it at the source link.
supportsDistance from shore
[8]
Global Energy Monitor2026-07-02
supportsCoordinates
[9]
GEBCO Compilation Group2020
supportsWater depth
[10]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Encyclopaedic1
[7]
Wikipedia2026
supportsoperator