Burbo Bank
Round 2 development on Burbo Flats, Liverpool Bay, Irish Sea.
Technology
Capacity
90 MW ◆
Turbines
25 × 3.6 MW ◆
Model
Siemens Swt 3-6-107 ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Origination
Crown Estate Round 1 · 2001 ·
Water depth
1–6 m ≈
Distance from shore
6.5 km ◆
Wind speed
8.9 m/s @ 100 m ≈
Revenue & grid
Offtake
Other ◇
Grid
Secured · 2007 ◆
Connection
33 kV inter-array to shore, stepped up to 132 kV at onshore … ◆
Schedule
FID
Taken · date not recorded ∴
COD
Oct 2007 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2001-04
Crown Estate Round 1
- Awarded to
- DONG Energy (now Ørsted)
- Basis
- seabed award
From the auction results — the round that created the project.
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Revenue & offtake the regime the project was built under
Offtake regime: ROC 1.5 ROCs/MWh
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing25≈25 turbines + 0 platforms expected · every expected structure seen
Surveyed2026-09-01≈from 119 satellite passes
Built2007-10offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-07≈Copernicus Sentinel-1 radar satellite, southbound pass
Farm covered100%≈the whole farm lies inside the image
Structures ringed25 confirmed · 0 not yet confirmed≈as counted on 2026-09-01 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortPort of Mostyn ◆assembly marshalling
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (25)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary

Sources & verification
10/18 fields verified · rests on 11 sources (5 primary) · ◆ 6 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[1]
DESNZ2024-04-08◆ Burbo Bank - Section 36C Consent Variati…
"the consent granted by the Secretary of State under section 36 of the Electricity Act 1989 on 9 July 2003 ("the Section 36 Consent") to construct and operate a 90MW offshore wind farm generating stat…
supportsConsentConsent granted
[11]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2487: Site Name "Burbo Bank", Development Status "Operational", Installed Capacity 90 MWelec, Operator "Orsted (formerly Dong Energy)"”
supportsRegister entry
Operator3
[2]
Ørsted (DONG Energy)2007-10-18◆ Inauguration of DONG Energy's Burbo Bank…
“The wind farm consists of 25 3.6 MW Siemens wind turbines, with a total production capacity of 90 MW. The 25 wind turbines will be able to produce 315 million kWh annually, which is equivalent to the …”
supportsTurbinesUnit capacityTotal capacityMechanismDetail
[5]
Ørsted A/S2016-11-21◆ First power from DONG Energys Burbo Bank…
“Its Burbo Bank Offshore Wind Farm was inaugurated in 2007 and was the first to use the 3.6MW wind turbines now used widely across the industry. DONG Energy has been operating out of Liverpool Bay for …”
supportsBackground
[12]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-001298: "Burbo Bank Offshore Wind Farm", Status "Built", MW Connected 90, Effective From n/a, Customer "ORSTED BURBO (UK) LIMITED"”
supportsRegister entry
Trade press5
[3]
Power Magazine2007◆ Burbo Bank Offshore Wind Farm, Liverpool…
"25 3.6-MW Siemens Power Generation (SPG) SWT-3.6-107 turbines ... first produced power on July 21 and was commissioned on October 18 [2007] ... each tower supporting a turbine is anchored to the seab…
supportsFinal investment decisionOnshore constructionFirst powerCommercial operationTurbines+7 more