Haixia

Status
Cancelledlifecycle stage
Ownership
LELeaLea Group 
Location
Taiwan
Taiwan Strait
Technology
Capacity 300 MW 
Turbines
Foundation
Site & conditions
Site rights Seabed rights held 
Origination Taiwan Round 3 Zonal Development — Block 3.1 (區塊開發 3-1) · 2022 ·
Water depth 28–35 m  Wind speed 10.1 m/s @ 150 m 
Revenue & grid
Offtake
Grid
Schedule
COD

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageCancelled
Offshore constructionnot started
Expected start of operationnot stated

Sources & verification

1/9 fields verified · rests on 7 sources · ◆ 2 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press7
[1]
Norton Rose Fulbright2024
supportsTotal capacity
[2]
Global Energy Monitor2026
supportsCoordinates
[3]
GEBCO Compilation Group2020
supportsWater depth
[4]
offshoreWIND.biz2022-12-14
Press report — cited, not quoted; read it at the source link.
supportsowner
[5]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[6]
Central News Agency (中央社)2026-07-02◆ 離岸風電3-3期調整 經部:解約場址將納擴充容量範圍
Press report — cited, not quoted; read it at the source link.
supportsBackground
[8]
Central News Agency (CNA) Taiwan2026-04-20◆ CNA: EDF terminates Wei Lan Hai Changhua…
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity