Hai Long 3
Located 45-70 km off Changhua County, Taiwan Strait. Water depth 35-55 m. Jacket foundations. Mitsui also holds a stake via Gentari partnership.
Status
Under Constructionlifecycle stage
DeliveringHafrok completion outlook
Ownership
Northland Power — 30.6% ◆GIGentari International Renewables — 29.4% ◆
YUYushan Energy — 20% ◆
MIMitsui — 20% ◆
Location
Taiwan Strait
Technology
Capacity
504 MW ◆
Turbines
— ◆
Model
Siemens Gamesa SG 14-222 DD ◆
Foundation
Jacket ◆
Site & conditions
Site rights
Seabed rights held ∴
Water depth
39–65 m ≈
Wind speed
11.1 m/s @ 150 m ≈
Revenue & grid
Offtake
PPA ◆
Grid
—
Schedule
FID
2023 ◆
COD · announced
2027 ◆
COD · Hafrok
2027 expected
Delivery outlook modelled by Hafrok · calibrated on delivered projects
2027
expected year of commercial operation
Chance of delivery
≈98%
estimated chance this project reaches commercial operation
Under Construction projects complete ≈97% of the time on Hafrok's record. A secured offtake contract lifts this one slightly; its size and technical complexity pull a little the other way.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
| Year | Probability |
|---|---|
| 2027 (expected) | 86.7% |
| 2028 | 13.3% |
How Hafrok got this date
1
Starting point: the last dated milestone
Construction start in
2024. From there Hafrok adds how long similar projects (in established offshore-wind markets) took to reach commercial operation, measured on projects that have delivered.2
Typical timing
Starting point plus the typical remaining time gives a middle estimate of
2026; the faster quarter of similar projects would be done by 2025, the slower quarter not until 2027.3
Result
Expected commercial operation
2027, likely range 2025–2027 (the middle half of outcomes for similar projects). The developer's announced date falls inside that likely range, so the announced date is adopted.4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Under Construction projects that went on to complete — ≈97%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Based on the measured record — all 257 construction starts with a final outcome reached operation — adjusted down for projects still mid-build and for legal-challenge risk. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈98%, which rates it
Delivering on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
JV entry · 2018-08
Yushan Energy → Mitsui & Co. stake not disclosed
- Stake
- not disclosed
- Consideration
- not disclosed
- Announced
- 2018-08
- Project stage
- early development
Mitsui & Co. acquired a 50% stake in Yushan Energy Taiwan in August 2018, giving Mitsui a 20% effective interest in the combined Hai Long project (both Hai Long 2 and Hai Long 3). This record covers Hai Long 3 (512 MW). The JV structure, deal terms, and ownership percentages are identical to the Hai Long 2 companion record. See Hai Long 2 for full transaction context. Transaction value not publicly disclosed. Data confidence: MEDIUM — effective stake and structure confirmed; deal value undisclosed.
Evidence
- renewablesnow.com — Mitsui signs deal for 20% of 1-GW offshore wind project in Taiwan - Offshore Wind News ↗ 2018-08 ◆ held
- evwind.es — Mitsui & Co. invests in Taiwanese offshore wind energy developer Yushan Energy Taiwan | REVE News of the wind sector in Spain and in the world ↗ 2018-08 ◆ held
From Hafrok’s transactions record
Farmdown · 2022-12
Northland Power → Gentari International Renewables stake not disclosed
- Stake
- not disclosed
- Consideration
- €272m
- Announced
- 2022-12
- Closed
- 2023-12
- Project stage
- pre-FID
Gentari acquired 49% of Northland Power's ownership in the combined Hai Long project (Hai Long 2 + Hai Long 3, 1,022 MW) for approximately NT$18 billion (CAD 800 million = EUR 552 million at 2023 CAD/EUR 0.69). This record covers the Hai Long 3 (504 MW) portion of the deal. See Hai Long 2 companion record for full deal context. COMBINED DEAL: CAD 800m = EUR 552m total for both Hai Long 2 + Hai Long 3. Capacity-weighted allocation: Hai Long 3 (504 MW) / 1,022 MW = 49.3% → EUR 272m for this record. Hai Long 2 companion record shows EUR 280m (50.7%). These are notional allocations — Northland's disclosure does not disaggregate. Post-transaction: Northland ~30.6%, Gentari ~29.4%, Yushan Energy (Mitsui/Enterprize) 40%. Data confidence: HIGH — deal value confirmed by Northland press release.
Evidence
- northlandpower.com — Northland Power Announces Strategic Partnership in Hai Long With Gentari ↗ 2022-12 ◆ held
- northlandpower.com — Northland Power and Gentari Renewables Announce Closing of Hai Long Partnership ↗ 2022-12 ◆ held
- globenewswire.com — Northland Power and Gentari Renewables Announce Closing of ↗ 2022-12 ◆ held
From Hafrok’s transactions record
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Revenue & offtake contract duration and price levels · money of the day
512 MW contracted — feed-in tariff
● Feed-in tariff · Taiwan 2018 Offshore Wind Capacity Allocation — Competitive Auction (競標)
Price2.5025 TWD/kWh ·Capacity512 MWAwardedJun 2018Term20 yrs
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation under way
no satellite count yet: this farm is outside the tracker’s coverage so far
Installation · on record
StageUnder Construction
Offshore constructionstarted 2024-04
Expected start of operation2027
Sources & verification
9/15 fields verified · rests on 11 sources (4 primary) · ◆ 4 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator3
[6]
Hai Long Offshore Wind
“Hai Long 2B and Hai Long 3 obtained the Establishment Permit from the Ministry of Economic Affairs (December 2019)”
supportsConsentConsent granted
[10]
Northland Power2025-06-12◆ Northland power achieves first power on …
“The milestone also includes the commissioning of both onshore and offshore substations, further demonstrating the project’s progress toward full commercial operations, anticipated in 2027.”
supportsCommercial operation
[11]
Northland Power2026-04-30◆ Northland power signs long term corporat…
“The new 30-year agreement builds on the existing long-term partnership with TSMC, established in 2022, which already covers Hai Long 2B and Hai Long 3. Subject to completion of necessary administrativ…”
supportsTotal capacityMechanismDetail
OEM1
[9]
Siemens Gamesa Renewable Energy2022-10-19◆ Siemens Gamesa and Hai Long light the wa…
“73 SG 14-222 DD offshore wind turbines intended to be deployed. 15-year service contract included for all three projects: Hai Long 2A (300 MW), Hai Long 2B (232 MW) and Hai Long 3 (512 MW).”
supportsModelUnit capacity
Auction results1
[12]
Conventus Law2026-06-22◆ tw-auction-2018-tw-2018-bond
Taiwan 2018 grid allocation: Stage-1 NT$4m/MW + Stage-2 NT$2m/MW performance bond; establishment permit before end-2019
supportsFeed-in tariff · Taiwan 2018 Offshore Wind Capacity Allocation — Competitive Auction (競標)
Trade press5
[2]
offshoreWIND.biz2023-12
Press report — cited, not quoted; read it at the source link.
supportsoperatorownerFinal investment decision
[3]
[4]
[7]
offshoreWIND.biz2024-04
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionSite rightsFoundation
[8]
Unverified import1
[1]