Hai Long 2
Located 45-70 km off Changhua County. Part of 1,022 MW Hai Long project (Hai Long 2 + Hai Long 3). SG 14-222 DD turbines (14 MW, upgradeable to 15 MW).
Status
Under Constructionlifecycle stage
DeliveringHafrok completion outlook
Ownership
Northland Power — 30.6% ◆GIGentari International Renewables — 29.4% ◆
YUYushan Energy — 20% ◆
MIMitsui — 20% ◆
Location
Taiwan Strait
Technology
Capacity
518 MW ◆
Turbines
37 × 14 MW ◇
Model
Siemens Gamesa SG 14-222 DD ◇
Foundation
Jacket ◇
Site & conditions
Site rights
Seabed rights held ∴
Water depth
32–66 m ≈
Wind speed
10.9 m/s @ 150 m ≈
Revenue & grid
Offtake
PPA ◆
Grid
Not recorded ◇
Connection
Changhua County onshore substation (Taipower grid 161 kV) ◇
Schedule
FID
2023 ◆
COD · announced
2027 ◆
COD · Hafrok
2027 expected
Delivery outlook modelled by Hafrok · calibrated on delivered projects
2027
expected year of commercial operation
Chance of delivery
≈98%
estimated chance this project reaches commercial operation
Under Construction projects complete ≈97% of the time on Hafrok's record. A secured offtake contract lifts this one slightly; its size and technical complexity pull a little the other way.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
| Year | Probability |
|---|---|
| 2027 (expected) | 86.7% |
| 2028 | 13.3% |
How Hafrok got this date
1
Starting point: the last dated milestone
Construction start in
2024. From there Hafrok adds how long similar projects (in established offshore-wind markets) took to reach commercial operation, measured on projects that have delivered.2
Typical timing
Starting point plus the typical remaining time gives a middle estimate of
2026; the faster quarter of similar projects would be done by 2025, the slower quarter not until 2027.3
Result
Expected commercial operation
2027, likely range 2025–2027 (the middle half of outcomes for similar projects). The developer's announced date falls inside that likely range, so the announced date is adopted.4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Under Construction projects that went on to complete — ≈97%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Based on the measured record — all 257 construction starts with a final outcome reached operation — adjusted down for projects still mid-build and for legal-challenge risk. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈98%, which rates it
Delivering on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
JV entry · 2018-08
Yushan Energy → Mitsui & Co. stake not disclosed
- Stake
- not disclosed
- Consideration
- not disclosed
- Announced
- 2018-08
- Project stage
- early development
In August 2018, Mitsui & Co. (Japan) acquired a 50% stake in Yushan Energy Taiwan Co., the Taiwanese subsidiary of Singapore-based Yushan Energy, which holds 40% of the Hai Long offshore wind project (both Hai Long 2 and Hai Long 3). The effective result was that Mitsui acquired a 20% indirect interest in the combined Hai Long project (50% × 40% = 20%). Post-transaction ownership of the Hai Long project: Northland Power 60%, Yushan Energy 40% (of which Mitsui holds 50% of Yushan Energy Taiwan, = 20% effective; Enterprize Energy holds 50% of Yushan Energy Singapore). The Mitsui entry covered the combined 1,022 MW Hai Long project (both phases). Transaction value not publicly disclosed. This record covers Hai Long 2 (518 MW per FK). The Mitsui entry represents Japan's first investment in a Taiwan offshore wind project. Data confidence: MEDIUM — effective stake and structure confirmed; deal value undisclosed.
Evidence
- renewablesnow.com — Mitsui signs deal for 20% of 1-GW offshore wind project in Taiwan - Offshore Wind News ↗ 2018-08 ◆ held
- evwind.es — Mitsui & Co. invests in Taiwanese offshore wind energy developer Yushan Energy Taiwan | REVE News of the wind sector in Spain and in the world ↗ 2018-08 ◆ held
From Hafrok’s transactions record
Farmdown · 2022-12
Northland Power → Gentari International Renewables stake not disclosed
- Stake
- not disclosed
- Consideration
- €280m
- Announced
- 2022-12
- Closed
- 2023-12
- Project stage
- pre-FID
On 14 December 2022, Northland Power announced a strategic partnership with Gentari International Renewables Pte. Ltd. (a Petronas subsidiary focused on clean energy) under which Gentari would acquire 49% of Northland's ownership interest in the Hai Long offshore wind project (both Hai Long 2 and Hai Long 3, combined 1,022 MW). The transaction closed on 28 December 2023. Consideration: approximately NT$18 billion (CAD 0.8 billion = approximately EUR 552 million at CAD/EUR 0.69 for 2023). Post-transaction ownership: Northland Power ~30.6% (60% × 51%), Gentari ~29.4% (60% × 49%), Yushan Energy (Mitsui/Enterprize) 40%. The proceeds were used to repay CAD 500 million of Northland's short-term corporate credit facility and fund remaining equity in the project. Hai Long's total project cost was approximately CAD 9 billion, with CAD 5 billion project finance debt signed in September 2023. COMBINED DEAL: CAD 800m = EUR 552m total for both Hai Long 2 + Hai Long 3. Capacity-weighted allocation: Hai Long 2 (518 MW) / 1,022 MW = 50.7% → EUR 280m for this record. Hai Long 3 companion record shows EUR 272m (49.3%). These are notional allocations — Northland's disclosure does not disaggregate. Data confidence: HIGH — deal value confirmed by Northland press release.
Evidence
- northlandpower.com — Northland Power Announces Strategic Partnership in Hai Long With Gentari ↗ 2022-12 ◆ held
- northlandpower.com — Northland Power and Gentari Renewables Announce Closing of Hai Long Partnership ↗ 2022-12 ◆ held
- globenewswire.com — Northland Power and Gentari Renewables Announce Closing of ↗ 2022-12 ◆ held
From Hafrok’s transactions record
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Revenue & offtake contract duration and price levels · money of the day
532 MW contracted — feed-in tariff
● Feed-in tariff · Taiwan 2018 Offshore Wind Capacity Allocation — Selection (遴選)
Priceprice undisclosed ·Capacity300 MWAwardedApr 2018Term20 yrs
● Feed-in tariff · Taiwan 2018 Offshore Wind Capacity Allocation — Competitive Auction (競標)
Price2.2245 TWD/kWh ·Capacity232 MWAwardedJun 2018Term20 yrs
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation under way
no satellite count yet: this farm is outside the tracker’s coverage so far
Installation · on record
StageUnder Construction
Offshore constructionstarted 2024-04
Expected start of operation2027
Sources & verification
6/17 fields verified · rests on 14 sources (6 primary) · ◆ 4 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator3
[9]
Hai Long Offshore Wind2023
“Jan 2019 Hai Long 2A obtained the Establishment Permit from the Ministry of Economic Affairs. ... Dec 2019 Hai Long 2B and Hai Long 3 obtained the Establishment Permit from the Ministry of Economic Af…”
supportsConsentConsent granted
[11]
Northland Power2026-04◆ Northland power signs long term corporat…
“the 294-megawatt (MW) Hai Long 2A, the 224 MW Hai Long 2B, and the 504 MW Hai Long 3 with a combined gross capacity of 1,022 MW. ... The new 30-year agreement builds on the existing long-term partners…”
supportsTotal capacityMechanismDetail
[12]
Northland Power2025-06-12◆ Northland Power Achieves First Power on …
“Northland Power Inc. (TSX: NPI) today announced first power from its Hai Long Offshore Wind Project in Taiwan, marking successful energization of the project and connection to Taipower’s grid.”
supportsFirst power
Auction results2
[14]
Conventus Law2026-06-22◆ tw-selection-2018-tw-2018-bond
Taiwan 2018 grid allocation: Stage-1 NT$4m/MW + Stage-2 NT$2m/MW performance bond; establishment permit before end-2019
supportsFeed-in tariff · Taiwan 2018 Offshore Wind Capacity Allocation — Selection (遴選)
[15]
Conventus Law2026-06-22◆ tw-auction-2018-tw-2018-bond
Taiwan 2018 grid allocation: Stage-1 NT$4m/MW + Stage-2 NT$2m/MW performance bond; establishment permit before end-2019
supportsFeed-in tariff · Taiwan 2018 Offshore Wind Capacity Allocation — Competitive Auction (競標)
Trade press8
[2]
Power Technology2025
Press report — cited, not quoted; read it at the source link.
supportsoperatorowner
[3]
offshoreWIND.biz2025
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityTotal capacityFoundation
[4]
[5]
[6]
Power Technology2023
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decision
[7]
offshoreWIND.biz2024-04-12
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionSite rights
[8]
Northland Power (GlobeNewswire)2026-05
“51 out of 73 turbines now installed and 32 turbines generating power ... The project is on track for commercial operations in 2027, with overall costs aligned with original expectations.”
supportsCommercial operation
[10]
Unverified import1
[1]
Northland Power2025-06-12
“Northland Power Inc. (TSX: NPI) today announced first power from its Hai Long Offshore Wind Project in Taiwan”
supportsFirst powerTurbinesModelUnit capacityTotal capacity+3 more