CanWind
Technology
Capacity
500 MW ◇
Turbines
43 × 14 MW ◇
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Origination
Taiwan Round 3 Zonal Development — Block 3.1 (區塊開發 3-1) · 2022 ·
Revenue & grid
Offtake
—
Grid
—
Schedule
COD
—
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageCancelled
Offshore constructionnot started
Expected start of operationnot stated
Sources & verification
0/6 fields verified · rests on 2 sources
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press2
[1]
offshoreWIND.biz2022
Press report — cited, not quoted; read it at the source link.
supportsownerTotal capacity
[2]
Power Technology2025
Press report — cited, not quoted; read it at the source link.
supportsTurbinesUnit capacity