Luchterduinen
Located 23 km off Noordwijk aan Zee in North Sea block Q10. Originally developed by Eneco New Energy B.V.
Status
Operationallifecycle stage
Ownership
Eneco — 50% ◇ICINPEX Corporation — 50% ◇
Location
North Sea
Technology
Capacity
129 MW ◇
Turbines
43 × 3 MW ◆
Model
Vestas V112 3-0 ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Water depth
18–24 m ◆
Distance from shore
23 km ◆
Wind speed
9.3 m/s @ 100 m ≈
Revenue & grid
Offtake
FiT ◆
Grid
Secured ◆
Connection
Sassenheim TenneT 150 kV substation ◆
Schedule
FID
Taken · date not recorded ∴
COD
Sep 2015 ◇
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Farmdown · 2013-01
Eneco → Diamond Generating Europe (Mitsubishi) 50%
- Stake
- 50%
- Consideration
- not disclosed
- Announced
- 2013-01
- Closed
- 2013-Q2
- Project stage
- consented
Eneco agreed to sell a 50% stake in Luchterduinen (then pre-construction) to Mitsubishi Corporation's Diamond Generating Europe subsidiary in January 2013. The partnership was intended to cover development, construction and long-term operation. Wind farm commissioned September 2015 (43 x Vestas 3 MW turbines). Deal value not disclosed by either party.
Evidence
- renewablesnow.com — Mitsubishi buys 50% stake in Eneco's Dutch offshore wind farm - Renewable Energy News ↗ 2013-01 ◆ held
From Hafrok’s transactions record
Secondary trade · 2021-12
Diamond Generating Europe (Mitsubishi) → INPEX 50%
- Stake
- 50%
- Consideration
- not disclosed
- Announced
- 2021-12
- Closed
- 2022-02
- Project stage
- operational
INPEX Corporation agreed in December 2021 to acquire DGE-NL's (Mitsubishi's) 50% stake in Luchterduinen. Completed February 2022. Dual transaction — simultaneously INPEX also acquired DGE's 15% in Borssele III/IV. Post- transaction structure: Eneco 50%, INPEX 50%. Deal value not disclosed. Advised by Norton Rose Fulbright (INPEX) and Clifford Chance (DGE).
Evidence
From Hafrok’s transactions record
Dashed tick marks today (9 Sep 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Revenue & offtake contract duration and price levels · money of the day
129 MW contracted — feed-in tariff
● Feed-in tariff · Regeling windenergie op zee 2009 (SDE offshore subsidy tender)
Priceprice undisclosed ·Capacity129 MWAwardedMay 2010Term15 yrs · delivery 2011
Installation how the build is going · from satellite counts and Hafrok’s registers
Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing44≈43 turbines + 1 platform expected · every expected structure seen
Surveyed2026-08-31≈from 118 satellite passes
Built2014 → 2015-09offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-05≈Copernicus Sentinel-1 radar satellite, southbound pass · 1 newer pass skipped because the satellite’s track only caught part of the farm (the best of them 65%)
Farm covered100%≈the whole farm lies inside the image
Structures ringed44 confirmed · 0 not yet confirmed≈as counted on 2026-08-31 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortIJmuiden ∅·cable staging · quay 580 m · draft 12.5 m
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-05
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (44)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary

Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationLuchterduinen offshore transformer station (transformatorstation)·owner Eneco — our record carries Eneco 50% / INPEX Corporation 50%, and the 2013 Eneco release records a long-term partnership with Mitsubishi Corporation over the farm. No held document states the structure's ownership separately from the farm's, so it is recorded here as the farm's. The asset was not transferred to a TSO: TenneT's role stops at the onshore 150 kV switching and transformer station at Sassenheim.
Sources & verification
13/18 fields verified · rests on 10 sources (6 primary) · ◆ 8 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[1]
RVO (Rijksdienst voor Ondernemend Nederland)2019-11◆ Aansluiting wind op zee - Luchterduinen …
“Eneco bouwt een offshore windpark van maximaal 150 MW in de Noordzee, ruim 23 kilometer uit de kust van Noordwijk. Het windpark wordt aangesloten op het landelijke hoogspanningsnet via het 150 kV scha…”
supportsConsentMechanismDetailStatusConnection point+2 more
Operator4
[2]
Staatscourant (Rijkswaterstaat)2018-04-26◆ Staatscourant 2018, 22909 - Veiligheidsz…
“Wijziging bekendmaking 16 april 2018, nr. RWS-2018/13462 houdende een verbod zich te bevinden in de veiligheidszone rondom Offshore Windpark Luchterduinen (Q10). De hoekpunten van het windmolenpark be…”
supportsCoordinates
[3]
Eneco2013-01-21◆ Eneco and Mitsubishi Corporation sign pa…
“Eneco and Mitsubishi Corporation (MC) have concluded an agreement giving MC a 50% stake in the Eneco Luchterduinen offshore wind farm.”
supportsTurbinesModelUnit capacityTotal capacity
[4]
Eneco2013-10-10◆ Construction of new offshore wind farm E…
“Today marks the start of the construction of Eneco Luchterduinen Wind Farm, five years after the completion of the last Dutch offshore wind farm, the Princess Amalia Wind Farm. The project involves 43…”
supportsOnshore constructionOffshore constructionSite rights
[9]
INPEX Corporation◆ Luchterduinen Offshore Wind Farm Project…
“In February 2022, we acquired a 50 percent interest in the Luchterduinen offshore wind farm from Diamond Generating Europe B.V., a Mitsubishi Corporation subsidiary. The wind farm has operated commerc…”
supportsco-ownerTurbinesUnit capacityTotal capacity
Auction results1
[12]
Overheid.nl (Ministerie van Economische Zaken)2009-11-18◆ nl-regeling-wind-op-zee-2009
"Het subsidieplafond ... bedraagt EUR 5.384.817.810,00. De Minister verdeelt het bedrag ... op volgorde van rangschikking van de aanvragen." / "Aanvragen ... worden ontvangen in de periode van 4 janua…
supportsFeed-in tariff · Regeling windenergie op zee 2009 (SDE offshore subsidy tender)
Trade press4
[5]
Offshore Wind Biz2015-05-25◆ First Power at Eneco Luchterduinen | Off…
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[6]
Offshore Wind Biz2015-09-22◆ Eneco Luchterduinen Completed ahead of S…
Press report — cited, not quoted; read it at the source link.
supportsoperatorFinal investment decisionCommercial operationTurbinesUnit capacity+2 more
[7]
Power Technology
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityFoundationWater depth+1 more
[10]