Located 22 km off the coast of Zeeland, Netherlands. Connected via the TenneT Borssele Alpha offshore substation (66 kV to 220 kV export).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2016’17’18’19’20’21’22’23’24’25’26View the source for Consent grantedConsent granted 24 Mar 2016 Borssele Wind Farm Sites I & II — awarded to Ørsted Borssele 1 B.V. (then DONG Energy)Borssele Wind Farm Sites I & II Jul 2016 · auction recordFinal investment decision 2018 View the source for Offshore constructionOffshore construction Jan 2020 View the source for First powerFirst power Apr 2020 View the sources for Commercial operationCommercial operation Dec 2020 Borssele Wind Farm Sites I & II — awarded to Ørsted Borssele 1 B.V. (then DONG Energy) 2016-07 ORIGINATIONØrsted → NBIM — 50% · €1,375m · closed 2021-05 2021-04 FARMDOWNTODAYØrsted — 50% today · operator Ørsted Ørsted 50%Norges Bank Investment Management (NBIM) — 50% today · investor NBIM NBIM 50%Borssele Wind Farm Sites I & II — awarded to Ørsted Borssele 1 B.V. (then DONG Energy) Ørsted → NBIM — 50% · €1,375m · closed 2021-05 50%
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 202020202020-12 · 3 recorded revisions · slipped +0.5 yr (first announced 2020)

Revenue & offtake contract duration and price levels · money of the day

752 MW contracted — tender award
Tender award · Borssele Wind Farm Sites I & II
Price€72.7/MWh ·Capacity752 MWAwardedJul 2016
Term15 yrs

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite installation tracker
counted from satellite radar images · a structure standing in the sea on a given date, not a turbine producing power · a guide, not a sourced fact
Installation · counted from satellite
Foundations93 of 9499% · first seen 2020-01-09
Turbines93 of 9499% · first seen 2020-04-04
Latest count2021-12-31from 558 satellite passes · 1 substation platform left out so the counts compare with the turbine number · the count has ended: the build is complete
Hafrok counts foundations and turbines from satellite radar images (≈): a structure is counted once it is seen standing in the sea, which is not the same as producing power. A structure first seen in the last 60 days is not yet confirmed, because on a single image a freshly set foundation and a ship holding position look alike. Substation platforms are left out so the counts compare with the number of turbines. Rows marked with a dot (·) come from Hafrok’s own registers; a supplier or contract appears only where a source states it — everything else reads “not recorded”, never guessed.
Structures standing over time · count
strong line = confirmed · light line = seen in the last 60 days, not yet confirmed · the chart counts every structure (94 turbines + 1 platform); the table counts turbines only
foundationsturbines up (a substation top being set in place counts here too)
2040608095 planned (turbines and platforms)latest count 2021-12-31foundations — running total, confirmedJan 2020 — 12 this month · 12 in totalFeb 2020 — 7 this month · 19 in totalMar 2020 — 20 this month · 39 in totalApr 2020 — 21 this month · 60 in totalMay 2020 — 30 this month · 90 in totalJun 2020 — 4 this month · 94 in totalJul 2020 — 0 this month · 94 in totalAug 2020 — 0 this month · 94 in totalSep 2020 — 0 this month · 94 in totalNov 2020 — 0 this month · 94 in totalturbines up — running total, confirmedJan 2020 — 0 this month · 0 in totalFeb 2020 — 0 this month · 0 in totalMar 2020 — 0 this month · 0 in totalApr 2020 — 3 this month · 3 in totalMay 2020 — 13 this month · 16 in totalJun 2020 — 18 this month · 34 in totalJul 2020 — 25 this month · 59 in totalAug 2020 — 22 this month · 81 in totalSep 2020 — 12 this month · 93 in totalNov 2020 — 1 this month · 94 in total94 foundations94 turbines upJan 2020Mar 2020May 2020Jul 2020Sep 2020
Satellite image
Image taken2026-09-07Copernicus Sentinel-1 radar satellite, northbound pass
Farm covered100%the whole farm lies inside the image
Structures ringed94 confirmed · 0 not yet confirmedas counted on 2021-12-31 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortVlissingen Buitenhaven (O&M base) ·operations · quay 1740 m · crane 1200 t
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (94)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Borssele 1 & 2, 2026-09-07
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationBorssele Alpha·66/220 kV · in service 2020 · owner TenneT (Dutch TSO — client of the EPCIC contract)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
20202021developer’s stated start 2020-Q4nowBorssele AlphaBorssele Alphain service 2020in service 2020

Sources & verification

17/18 fields verified · rests on 14 sources (7 primary) · ◆ 13 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[2]
RVO (Netherlands Enterprise Agency)2015-09◆ Borssele Wind Farm Zone Sites I and II -…
“The BWFZ … is located 22.2 km from shore (12 nautical miles) and will be sub-divided into four BWFS. Water depth is approximately 16-38 m.”
supportsStatusConnection pointDistance from shore
[3]
RVO (Netherlands Enterprise Agency)2016-07-05◆ RVO Borssele I & II results
“On 5 July 2016 the subsidy and permits for the Borssele Wind Farm Sites I and II were awarded to Ørsted Borssele 1 B.V. … With 94 turbines type Siemens Gamesa 8,0 MW-167 DD this wind farm will get a t…”
supportsTurbinesModelUnit capacityTotal capacityMechanism+1 more
Operator5
[1]
Ministerie van Economische Zaken (Netherlands)2016-03-24◆ Kavelbesluit I windenergiegebied Borssel…
“'s-Gravenhage, 24 maart 2016 — De Minister van Economische Zaken, H.G.J. Kamp”
supportsConsentConsent granted
[4]
Ørsted A/S2017-07◆ Orsted signs agreement with Siemens Game…
“Ørsted has signed a contract with Siemens Gamesa for its Borssele 1 and 2 offshore wind farm in the Netherlands. ... The wind farm will be located 22km off the coast of the Dutch province of Zeeland w…”
supportsTurbinesModelUnit capacityTotal capacityWater depth+2 more
[5]
Ørsted A/S2017-08◆ Orsted chooses Vlissingen Buitenhaven fo…
“Ørsted and Zeeland Seaports have signed a Letter of Intent for developing an O&M base in Vlissingen Buitenhaven for the operation and maintenance of the offshore wind farm Borssele 1&2.”
supportsoperations
[6]
Ørsted A/S2021-02◆ Ørsted Annual Report 2020
“In December, we commissioned the 752 MW Dutch wind farm Borssele 1 & 2 on schedule and within budget. The wind farm deploys 94 Siemens Gamesa 8 MW wind turbines, making it the largest-ever built in th…”
supportsCommercial operationCOD history
[7]
Ørsted A/S2022-02◆ Ørsted Annual Report 2021
“Norges Bank Investment Management (NBIM) became a 50 % shareholder in our 752 MW Borssele 1 & 2 project. The total value of the transaction amounted to DKK ~10.2 billion and marks NBIM's first investm…”
supportsoperator
Auction results1
[14]
Overheid.nl (wetten.overheid.nl)2015◆ nl-regeling-borssele-1-2
Regeling windenergie op zee 2015 — the tender rulebook (rung-2 allocation regulation) for Borssele I & II. SDE+ subsidised round; text references the award of "subsidies" under the SDE+ scheme. Auctio…
supportsTender award · Borssele Wind Farm Sites I & II
Trade press6
[8]
offshoreWIND.biz2020-04-29◆ Borssele 1 & 2 Generates First Power | O…
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[9]
offshoreWIND.biz2020-11-27◆ Borssele 1&2 Fully Commissioned | Offsho…
Press report — cited, not quoted; read it at the source link.
supportsCommercial operation
[10]
offshoreWIND.biz2021-05-31◆ Ørsted Divests Half of Borssele 1 & 2 OW…
Press report — cited, not quoted; read it at the source link.
supportsinvestor
[11]
WindpowerNL2020-01-13◆ Start foundation construction at Borssel…
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionFoundation
[12]
offshoreWIND.biz2016-07-05◆ DONG Energy Winner of Dutch Borssele I &…
Press report — cited, not quoted; read it at the source link.
supportsMechanismStrike / priceDetail
[13]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed