Located off the coast of Loire-Atlantique in the Bay of Biscay. Ten years from tender to commissioning.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2012’13’14’15’16’17’18’19’20’21’22’23’24’25’26France Offshore Wind Round 1 (AO1) — awarded to Eolien Maritime France (EDF Renouvelables + Enbridge)France Offshore Wind Round 1 (AO1) Apr 2012 · auction recordView the source for Consent grantedConsent granted Jun 2019 View the source for Onshore constructionOnshore construction Sep 2019 View the source for Final investment decisionFinal investment decision Oct 2019 View the source for Offshore constructionOffshore construction May 2021 View the source for First powerFirst power Jun 2022 View the source for Commercial operationCommercial operation Nov 2022 France Offshore Wind Round 1 (AO1) — awarded to Eolien Maritime France (EDF Renouvelables + Enbridge) 2012-04 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDEDF Renewables → Enbridge — 50.0% 2016-05 JV ENTRYEnbridge → CPP Investments — 24.5% · €80m · closed 2020-Q4 2020-05 FARMDOWN — stake not disclosed 2023-02 Transfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYEolien Maritime France (EDF Renouvelables + Enbridge) Eolien Maritime France Eolien Maritime France not among today’s recorded owners — no sale recordedEDF Renewables — 50% today EDF Renewables EDF Renewables 50%Enbridge Enbridge Enbridge exited 2020-05CPP Investments CPP Investments CPP Investments exited 2020-05EIH S.a r.l. — 50% today EIH S.a r.l. EIH S.a r.l. 50%France Offshore Wind Round 1 (AO1) — awarded to Eolien Maritime France (EDF Renouvelables + Enbridge) Transfer(s) not in Hafrok's record — shown as a gap, never guessed. EDF Renewables → Enbridge — 50.0% 50%Enbridge → CPP Investments — 24.5% · €80m · closed 2020-Q4 24.5%Transfer(s) not in Hafrok's record — shown as a gap, never guessed.
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 20222022-11 · 2 recorded revisions · held (announced 2022, unchanged)

Revenue & offtake contract duration and price levels · money of the day

480 MW contracted — tender award
Tender award · France Offshore Wind Round 1 (AO1)
Price€143.6/MWh ·Capacity480 MWAwardedApr 2012
Term20 yrs

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite installation tracker
counted from satellite radar images · a structure standing in the sea on a given date, not a turbine producing power · a guide, not a sourced fact
Installation · counted from satellite
Foundations80 of 80100% · first seen 2021-05-08
Turbines80 of 80100% · first seen 2021-08-18
Latest count2023-12-28from 442 satellite passes · 1 substation platform left out so the counts compare with the turbine number · the count has ended: the build is complete
Hafrok counts foundations and turbines from satellite radar images (≈): a structure is counted once it is seen standing in the sea, which is not the same as producing power. A structure first seen in the last 60 days is not yet confirmed, because on a single image a freshly set foundation and a ship holding position look alike. Substation platforms are left out so the counts compare with the number of turbines. Rows marked with a dot (·) come from Hafrok’s own registers; a supplier or contract appears only where a source states it — everything else reads “not recorded”, never guessed.
Structures standing over time · count
strong line = confirmed · light line = seen in the last 60 days, not yet confirmed · the chart counts every structure (80 turbines + 1 platform); the table counts turbines only
foundationsturbines up (a substation top being set in place counts here too)
2040608081 planned (turbines and platforms)latest count 2023-12-28foundations — running total, confirmedMay 2021 — 2 this month · 2 in totalJun 2021 — 6 this month · 8 in totalJul 2021 — 8 this month · 16 in totalAug 2021 — 5 this month · 21 in totalSep 2021 — 9 this month · 30 in totalOct 2021 — 6 this month · 36 in totalNov 2021 — 8 this month · 44 in totalDec 2021 — 2 this month · 46 in totalJan 2022 — 6 this month · 52 in totalFeb 2022 — 2 this month · 54 in totalMar 2022 — 6 this month · 60 in totalApr 2022 — 8 this month · 68 in totalMay 2022 — 10 this month · 78 in totalJun 2022 — 0 this month · 78 in totalJul 2022 — 1 this month · 79 in totalAug 2022 — 0 this month · 79 in totalSep 2022 — 0 this month · 79 in totalNov 2022 — 1 this month · 80 in totalDec 2022 — 0 this month · 80 in totalJan 2023 — 0 this month · 80 in totalSep 2023 — 1 this month · 81 in totalturbines up — running total, confirmedMay 2021 — 0 this month · 0 in totalJun 2021 — 0 this month · 0 in totalJul 2021 — 0 this month · 0 in totalAug 2021 — 2 this month · 2 in totalSep 2021 — 0 this month · 2 in totalOct 2021 — 0 this month · 2 in totalNov 2021 — 0 this month · 2 in totalDec 2021 — 0 this month · 2 in totalJan 2022 — 0 this month · 2 in totalFeb 2022 — 0 this month · 2 in totalMar 2022 — 0 this month · 2 in totalApr 2022 — 4 this month · 6 in totalMay 2022 — 15 this month · 21 in totalJun 2022 — 10 this month · 31 in totalJul 2022 — 20 this month · 51 in totalAug 2022 — 19 this month · 70 in totalSep 2022 — 8 this month · 78 in totalNov 2022 — 0 this month · 78 in totalDec 2022 — 1 this month · 79 in totalJan 2023 — 1 this month · 80 in totalSep 2023 — 1 this month · 81 in total81 foundations81 turbines upMay 2021Aug 2021Nov 2021Feb 2022May 2022Aug 2022Dec 2022
Satellite image
Image taken2026-09-05Copernicus Sentinel-1 radar satellite, northbound pass
Farm covered100%the whole farm lies inside the image
Structures ringed81 confirmed · 0 not yet confirmedas counted on 2023-12-28 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortPort of La Rochelle foundation staging
PortPort of Saint-Nazaire nacelle manufacturing
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-05
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (81)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Saint-Nazaire, 2026-09-05
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationSaint-Nazaire (Banc de Guerande) Offshore Substation·in service 2022 · owner Parc du Banc de Guerande — the producer (EDF Renouvelables and partner), NOT RTE
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
20222023developer’s stated start 2022-11nowSaint-Nazaire (Banc de Guerande) Offshore SubstationSaint-Nazaire (Banc de Guerande) …in service 2022in service 2022

Sources & verification

16/18 fields verified · rests on 15 sources (6 primary) · ◆ 5 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[12]
European Commission2019-07◆ State aid: Commission approves support f…
“The sites are "Courselles-sur-Mer", "Fécamp", "Saint-Nazaire", "Iles d'Yeu / Noirmoutier", "Dieppe / Le Tréport" and "Saint-Brieuc". [...] The selected installations will receive support in the form o…”
supportsMechanismDetail
Operator3
[1]
PR Newswire (EDF Renewables / Enbridge / CPP Investments joint release)2022-11-23◆ EDF Renewables, Enbridge and CPP Investm…
“EDF Renewables and EIH S.a.r.l, a subsidiary of Enbridge Inc. and CPP Investments, have achieved the full commissioning of Saint-Nazaire offshore wind ... France's first offshore wind project, Saint-N…”
supportsOnshore constructionOffshore constructionCommercial operationCOD historyTurbines+2 more
[8]
Nantes Saint-Nazaire Port Authority2021
“Ordered in June 2018 by wind farm operator Societe Parc du Banc de Guerande, a subsidiary of EMF.”
supportsnacelle manufacturing
[17]
DGEC — Ministère de la Transition écologique (eoliennesenmer.fr)2026-08-25◆ French Eoliennes en mer register (DGEC),…
“Register node 844 (node--type-project) at /facades-maritimes-en-france/facade-nord-atlantique-manche-ouest/saint-nazaire — title 'Saint-Nazaire'; page text 2476 chars, hash f72aa7c3d560510d…. Identify…”
supportsRegister entry
Auction results1
[18]
CRE (Commission de regulation de l'energie)2011◆ fr-ao1-tender-page
AO1 (first French round, 2011) tender page on the CRE site - the appel d'offres for 4 sites (Saint-Nazaire, Fecamp, Courseulles, Saint-Brieuc), offtake = a 20-year purchase obligation (pre-CfD).
supportsTender award · France Offshore Wind Round 1 (AO1)
Trade press10
[2]
Power Technology2022-11
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityTotal capacityFoundation+1 more
[3]
Power Technology2022-11
Press report — cited, not quoted; read it at the source link.
supportsStatusConnection point
[4]
Offshore Wind (offshorewind.biz)2022-11-23
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[5]
IPP Journal2019-10
“Saint-Nazaire offshore wind farm is the first offshore wind project to reach financial close in the French market. Financial close date: October 14, 2019. EDF Renewables and Enbridge closed EUR 2 bill…”
supportsFinal investment decision
[6]
Offshore Wind (offshorewind.biz)2019-06-07
Press report — cited, not quoted; read it at the source link.
supportsConsentConsent granted
[7]
Heavy Lift News2021-05
“The first foundation was installed at Saint-Nazaire on 11 May 2021. The Innovation vessel transports, 3 by 3, the foundations stored in the port of La Rochelle, to install them at sea.”
supportsfoundation staging
[9]
Offshore Engineer (OE Digital)2020-05-07
“Eolien Maritime France SAS is a 50/50 joint venture between Enbridge and EDF, which is working to develop three wind farms offshore France, the Saint Nazaire, the Fecamp, and Courseulles. After the tr…”
supports↳ parent
[11]
The Wind Power2026-05◆ Saint-Nazaire (France) - Parcs éoliens -…
Press report — cited, not quoted; read it at the source link.
supportsCoordinates
[13]
Enbridge2022-11
supportsowner
[14]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed