Eoliennes Mediterranee Grand Large (Golfe de Fos)
AO6 Round 6 project. Second Mediterranean floating wind site under AO6. Sixth offshore wind project won by EDF in France.
Status
Advanced Developmentlifecycle stage
ExpectedHafrok completion outlook
Ownership
Location
Mediterranean Sea
Technology
Capacity
250 MW ◆
Turbines
—
Foundation
Floating ◇
Site & conditions
Site rights
Seabed rights held ∴
Origination
France Offshore Wind AO6 (Mediterranean floating) · 2024 ·
Water depth
72–125 m ≈
Distance from shore
25 km ◆
Wind speed
9.9 m/s @ 150 m ≈
Revenue & grid
Offtake
CfD · €85.9/MWh ◆
Grid
Offered · 2025-09 ◇
Connection
RTE offshore AC substation (Eiffage/Smulders EPCIC contract, … ◇
Schedule
FID
Not taken
COD · announced
2031 ◆
COD · Hafrok
2031 expected
Delivery outlook modelled by Hafrok · calibrated on delivered projects
2031
expected year of commercial operation
Chance of delivery
≈82%
estimated chance this project reaches commercial operation
Advanced Development projects complete ≈75% of the time on Hafrok's record. A secured offtake contract puts this one well above that; a market with a thinner delivery record and technical complexity weigh only slightly against it.
COD outlook
If it completes, when — Hafrok’s probability by year (teal) · the developer’s COD guidance, by date stated (ink)
| Year | Probability |
|---|---|
| 2030 | 3.9% |
| 2031 (expected) | 50.2% |
| 2032 | 29.5% |
| 2033 | 10.6% |
| 2034 | 3.8% |
| 2035 | 1.4% |
| 2036 | 0.6% |
| Stated | Announced COD |
|---|---|
| 2026-06-16 | 2031 (held since 2026-04-15, 2 statements) |
How Hafrok got this date
1
Starting point: the last dated milestone
Consent granted in
2026. From there Hafrok adds how long similar projects (floating, in developing offshore-wind markets) took to reach commercial operation, measured on projects that have delivered.2
Typical timing
Starting point plus the typical remaining time gives a middle estimate of
2032; the faster quarter of similar projects would be done by 2030, the slower quarter not until 2032 Q3.3
Result
Expected commercial operation
2031, likely range 2030–2033 (the middle half of outcomes for similar projects). The developer's announced date falls inside that likely range, so the announced date is adopted.4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Advanced Development projects that went on to complete — ≈75%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Consented projects have historically completed at very high rates, but the 2023–25 downturn showed consented-but-unfinanced projects can still fail — the estimate holds back for the offtake and financing gates still ahead. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈82%, which rates it
Expected on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2024-12
France Offshore Wind AO6 (Mediterranean floating)
- Awarded to
- EDF Renouvelables + Maple Power
- Basis
- integrated tender
Founding JV · 2024-12
EDF Renewables · Maple Power — The French government awarded the AO6 Mediterranean floating wind tender to a consortium of EDF Renewables and Maple Power (50-50 JV of Enbridge Inc. and CPP Investments) for the Golfe de Fos zone in December 2024. The project company is named Eoliennes Méditerranée Grand Large and is located approximately 25 km off Fos-sur-Mer (Bouches-du-Rhône), covering 52 km2. BW Ideol is the technology partner, providing concrete floating foundation design (Damping Pool technology) based on a collaboration agreement signed in 2022. No consideration was exchanged between parties at this stage; this was a tender consortium formation. The project is expected COD around 2031 and will supply approximately 450,000 residents.
Evidence
- offshoreWIND.biz — Consortia Led by EDF, Ocean Winds Win French Floating Wind Tender ↗ 2024-12 ◆ held
- bw-ideol.com ↗
From the auction results — the round that created the project; founding JV from Hafrok’s transactions record.
JV entry · 2025-11
EDF Renewables → BW Ideol 15%
- Stake
- 15%
- Consideration
- not disclosed
- Announced
- 2025-11
- Project stage
- early development
BW Ideol Projects Company (a subsidiary of BW Ideol, itself part of BW Group) became a shareholder in Eoliennes Méditerranée Grand Large in November 2025, acquiring a 15% equity stake from EDF Renewables. BW Ideol's investment reflects its dual role as both technology licensor (providing the Damping Pool concrete floating foundation design) and equity co-investor. No consideration was publicly disclosed; the entry of a technology partner as equity co-investor is unusual and suggests a technology-in-kind or discounted equity arrangement rather than a cash transaction. Post-entry ownership: EDF Renewables + Maple Power (combined 85% split between them), BW Ideol 15% (exact EDF/Maple split not publicly confirmed). The project remains in the development phase (COD ~2031).
Evidence
- offshoreWIND.biz — BW Ideol Acquires Stake in 250 MW French Floating Wind Project ↗ 2025-11 ◆ held
- bw-group.com — BW Ideol Projects Company becomes a shareholder in the Méditerranée Grand Large floating offshore wind farm ↗ 2025-11 ◆ held
From Hafrok’s transactions record
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced COD: held (announced 2031, unchanged) · the full guidance history is in the delivery chart above
Revenue & offtake contract duration and price levels · money of the day
250 MW contracted — tender award
● Tender award · France Offshore Wind AO6 (Mediterranean floating)
Price€85.9/MWh ·Capacity250 MWAwardedDec 2024Term20 yrs
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageAdvanced Development
Offshore constructionnot started
Expected start of operation2031
Construction ports
PortFos-sur-Mer ◇·fabrication · quay 1000 m · draft 14.5 m
Sources & verification
7/15 fields verified · rests on 10 sources (5 primary) · ◆ 4 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator5
[1]
Ministère de l'Économie et des Finances (French Government)2024-12-27◆ Construction et l’exploitation de deux p…
“les deux lauréats ... Eoliennes Méditerranée Grand Large, composée de EDF Renouvelables et Maple Power ... plus de 25 km des côtes, au large de Fos-sur-Mer (Bouches-du-Rhône) ... capacité de 250 MW ..…”
supportsConsentCommercial operationCOD historyTotal capacityMechanism+3 more
[2]
EDF Renewables2024-12-27◆ EDF Renouvelables et Maple Power remport…
“EDF Renouvelables and Maple Power have been selected by the Ministry of Industry and Energy to design, build and operate the Méditerranée Grand Large floating offshore wind farm of approximately 250 M…”
supportsTotal capacityDistance from shore
[3]
BW Ideol2024-12-27
“BW Ideol has been the consortium's technology partner since 2022, designing and manufacturing concrete floating foundations for the project.”
supportsFoundation
[6]
EDF Power Solutions2025-11
“BW Ideol Projects Company, a subsidiary of BW Ideol and ADEME Investissement dedicated to the development of floating offshore wind projects, has taken a minority equity stake ... 15% equity investmen…”
supportsoperatorowner
[10]
DGEC — Ministère de la Transition écologique (eoliennesenmer.fr)2026-08-25◆ French Eoliennes en mer register (DGEC),…
“Register node 809 (node--type-project) at /facades-maritimes-en-france/facade-mediterranee/projets-en-mediterranee/Golfe-Fos/Golfe-fos-1 — title 'Golfe de Fos 1'; page text 13540 chars, hash 06b6f2ea1…”
supportsRegister entry
Auction results1
[11]
CRE (Commission de regulation de l'energie) / DGEC2024◆ fr-ao6-cahier-des-charges
AO6 cahier des charges ("FLOTTANTES DE MEDITERRANEE") - two floating farms in the Golfe du Lion.
supportsTender award · France Offshore Wind AO6 (Mediterranean floating)
Trade press4
[5]
offshoreWIND.biz2025-09-30
Press report — cited, not quoted; read it at the source link.
supportsStatusConnection pointfabrication
[7]
[8]
[9]