EFGL Golfe du Lion
Status
Operationallifecycle stage
Ownership
Ocean Winds — 80% ◆
Banque des Territoires — 20% ◆Location
Mediterranean Sea
Technology
Capacity
30 MW ◇
Turbines
3 × 10 MW ◇
Model
Vestas V164 10-0 ◇
Foundation
Floating ◇
Site & conditions
Site rights
Seabed rights held ∴
Origination
France floating wind pilot tenders (ADEME) · 2016 ·
Water depth
70–100 m ◇
Distance from shore
16 km ◇
Wind speed
10.3 m/s @ 150 m ≈
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Taken · date not recorded ∴
COD
2025 ◇
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2016-07
France floating wind pilot tenders (ADEME)
- Awarded to
- Ocean Winds (Engie + EDPR) + Caisse des Dépôts
- Basis
- integrated tender
From the auction results — the round that created the project.
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Revenue & offtake the regime the project was built under
Offtake regime not on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2025
Sources & verification
2/14 fields verified · rests on 7 sources (3 primary) · ◆ 3 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator4
[1]
[5]
EFGL project (info-efgl.fr)2020-12-15◆ Ocean Winds devient actionnaire du proje…
“Ocean Winds reprend désormais l'intégralité de l'actionnariat détenu par Engie et d'EDPR dans la société de projet Les Eoliennes Flottantes du golfe du Lion (LEFGL), à hauteur de 80%. La Banque des Te…”
supportsoperatorowner
[6]
DGEC — Ministère de la Transition écologique (eoliennesenmer.fr)2026-08-25◆ French Eoliennes en mer register (DGEC),…
“Register node 862 (node--type-project) at /facades-maritimes-en-france/facade-mediterranee/leucate — title 'Leucate-Le Barcarès'; page text 1639 chars, hash 6b2084825a501e3e…. Identifying text: La fer…”
supportsRegister entry
[7]
Ocean Winds2025-07-31◆ Eoliennes flottantes du golfe du lion ef…
“Le remorquage et l'installation de cette première éolienne en mer au large marque la poursuite des travaux d'installation débutés fin 2023, par la pose des 9 ancres et lignes d'ancrage (chaînes d'envi…”
supportsConstruction start
Trade press3
[2]
[3]
The Wind Power2026
Press report — cited, not quoted; read it at the source link.
supportsCoordinates
[4]