Liivi 1 & 2

Liivi 1 & 2 is Estonia's first offshore wind development — the Gulf of Riga seabed (superficies-licence) sites won in the country's inaugural tender (Dec 2023; Liivi 1 highest bid EUR 1.16m; see auction round ee-liivi-seabed-2023).

Status
Early Developmentlifecycle stage
ProspectiveHafrok completion outlook
Ownership
CICopenhagen Infrastructure Partners 
Location
Estonia
Baltic Sea
Technology
Capacity 1,500 MW 
Turbines
Foundation
Site & conditions
Site rights Seabed rights held 
Origination Estonia Liivi 1 & 2 seabed auctions · 2023 ·
Water depth 28–38 m  Wind speed 9.6 m/s @ 150 m 
Revenue & grid
Offtake
Grid
Schedule
FID Not taken
COD · announced 2035 
COD · Hafrok 2035 expected

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2035
expected year of commercial operation
Chance of delivery
≈41% estimated chance this project reaches commercial operation
Early Development projects complete ≈61% of the time on Hafrok's record. This one sits well below that: a market with no delivery record yet, a very large build, technical complexity and no offtake contract yet.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2034: 14.1% (conditional on completion) 2035: 28.0% (conditional on completion) 2036: 22.7% (conditional on completion) 2037: 14.6% (conditional on completion) 2038: 8.7% (conditional on completion) 2039: 5.1% (conditional on completion) 2040: 3.1% (conditional on completion) 2041: 1.8% (conditional on completion) 2042: 1.1% (conditional on completion) 2043: 0.7% (conditional on completion)2026now2028203020322034203528%2036203820402042 Developer-announced COD: 2035 — in line with Hafrok’s expected year ANNOUNCED = EXPECTED 2035
COD probability by year, conditional on completion
YearProbability
203414.1%
2035 (expected)28.0%
203622.7%
203714.6%
20388.7%
20395.1%
20403.1%
20411.8%
20421.1%
20430.7%
How Hafrok got this date
1
No dated milestone yet
Nothing is consented or financed with a date, so the estimate starts from today (2026), adds the time similar projects (in new offshore-wind markets) took from consent to operation, plus an allowance for obtaining consent.
2
Earliest credible date
Typical consent-to-operation time plus allowances means commercial operation before 2033 is not credible.
3
No route to market yet — counted from 2029
The project has no offtake contract yet. No contract, auction or tariff exists in Estonia today that a project without an offtake agreement could win, and none is scheduled. Hafrok believes a first support award there is unlikely before 2029 Q3, and counts from then. This is Hafrok's judgment, not a fact on the record — what it rests on: Estonia market page. The permits are not affected; winners typically reach final investment decision about 2 years after an award (2031 Q3), then build time on top gives 2034 Q3. The milestone timing is already later than that, so it stands.
4
Result
Expected commercial operation 2035, likely range 2035–2040 (the middle half of outcomes for similar projects). With no milestone to build from, the earliest credible date is the estimate, with a deliberately wide range.
5
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
6
Chance of delivery — separate from timing
Start from the share of Early Development projects that went on to complete — ≈61%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). About three in four early-stage projects with a final outcome went on to operate — a record from an easier era. Most of today's early pipeline is still unresolved, so the estimate discounts it. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈41%, which rates it Prospective on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2024’25’26’27’28’29’30’31’32’33’34’35Developer-announced COD: 2035 announced COD 2035Estonia Liivi 1 & 2 seabed auctions — awarded to Ignitis Renewables + Copenhagen Infrastructure PartnersEstonia Liivi 1 & 2 seabed auctions Dec 2023 · auction recordCommercial operation 2035 ·Hafrok expectedEstonia Liivi 1 & 2 seabed auctions — awarded to Ignitis Renewables + Copenhagen Infrastructure Partners 2023-12 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYIgnitis Renewables · developer Ignitis Renewables Ignitis RenewablesCopenhagen Infrastructure Partners · developer CIP CIPEstonia Liivi 1 & 2 seabed auctions — awarded to Ignitis Renewables + Copenhagen Infrastructure Partners Transfer(s) not in Hafrok's record — shown as a gap, never guessed.
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake route to market — open

No offtake secured — route to market open
The routes describe what exists in this market — not a prediction of which the project will take. Timing math for the auction gate lives in the delivery outlook above.
Next visible round · from the auction calendar
ELWIND (Estonia-Latvia joint project) rights auction
expected — · planned · the round’s published documents do not name this project
indicative

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageEarly Development
Offshore constructionnot started
Expected start of operation2035

Sources & verification

1/9 fields verified · rests on 6 sources · ◆ 1 document held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Financier2
[1]
Ignitis Renewables2026
supportsCommercial operationTotal capacity
[6]
Ignitis grupė2024-01-17◆ Ignitis Renewables and Copenhagen Infras…
“Ignitis Renewables and Copenhagen Infrastructure Partners (CIP) through its Growth Markets Fund II are the winners of the auction-based competitive tender for development of an offshore wind farm in t…”
supportsdeveloper
Auction pipeline1
[7]
ELWIND (Estonia/Latvia)2026
ELWIND (EE-LV, up to 1 GW) — rights to be auctioned 2026 after studies/permits; CEF co-funded.
supportsELWIND (Estonia-Latvia joint project) rights auction
Trade press3
[3]
Global Energy Monitor2026
supportsCoordinates
[4]
GEBCO Compilation Group2020
supportsWater depth
[5]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed