Kriegers Flak
Two sections: western Kriegers Flak A (KFA, ~200 MW) and eastern Kriegers Flak B (KFB, ~400 MW), each with its own offshore substation platform.
Technology
Capacity
604 MW ◆
Turbines
72 × 8.4 MW ◆
Model
Siemens Gamesa SG 8-0-167 DD ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Origination
Kriegers Flak offshore wind tender · 2016 ·
Water depth
18–31 m ≈
Distance from shore
15 km ◆
Wind speed
9.6 m/s @ 100 m ≈
Revenue & grid
Offtake
CfD ◆
Grid
Secured · 2020-12 ◆
Connection
Energinet 220 kV HVAC cables to Danish onshore grid; Combined … ◆
Schedule
FID
20 Dec 2018 ◆
COD
6 Sep 2021 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2016-11
Kriegers Flak offshore wind tender
- Awarded to
- Vattenfall Vindkraft A/S
- Basis
- integrated tender
From the auction results — the round that created the project.
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2021→2021→2021→2021→2021→2021-09 · 6 recorded revisions · held (announced 2021, unchanged)
Revenue & offtake contract duration and price levels · money of the day
600 MW contracted — tender award
● Tender award · Kriegers Flak offshore wind tender
Price37.2 DKK_ore/kWh ·Capacity600 MWAwardedNov 2016Installation how the build is going · from satellite counts and Hafrok’s registers
Satellite installation tracker
counted from satellite radar images · a structure standing in the sea on a given date, not a turbine producing power · a guide, not a sourced fact
Installation · counted from satellite
Foundations72 of 72≈100% · first seen 2017-10-10
Turbines72 of 72≈100% · first seen 2017-10-01
Latest count2022-12-29from 1268 satellite passes · 2 substation platforms left out so the counts compare with the turbine number · the count has ended: the build is complete
Hafrok counts foundations and turbines from satellite radar images (≈): a structure is counted once it is seen standing in the sea, which is not the same as producing power. A structure first seen in the last 60 days is not yet confirmed, because on a single image a freshly set foundation and a ship holding position look alike. Substation platforms are left out so the counts compare with the number of turbines. Rows marked with a dot (·) come from Hafrok’s own registers; a supplier or contract appears only where a source states it — everything else reads “not recorded”, never guessed.
Structures standing over time · count
strong line = confirmed · light line = seen in the last 60 days, not yet confirmed · the chart counts every structure (72 turbines + 2 platforms); the table counts turbines only
foundationsturbines up (a substation top being set in place counts here too)
Satellite image
Image taken2026-09-07≈Copernicus Sentinel-1 radar satellite, northbound pass · 1 newer pass skipped because the satellite’s track only caught part of the farm (the best of them 51%)
Farm covered100%≈the whole farm lies inside the image
Structures ringed74 confirmed · 0 not yet confirmed≈as counted on 2022-12-29 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortPort of Rønne (Bornholm) ◆turbine assembly
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (74)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary

Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 2
Offshore substationKriegers Flak A (KFA)·220 kV · in service 2018 · owner Energinet (Danish TSO)
Offshore substationKriegers Flak B (KFB)·220 kV · in service 2018 · owner Energinet (Danish TSO)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
Sources & verification
15/18 fields verified · rests on 13 sources (9 primary) · ◆ 11 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator3
[1]
Danish Energy Agency (Energistyrelsen)2020-02-03◆ VVM-tilladelse og godkendelse af detailp…
"Energistyrelsen meddeler hermed VVM-tilladelse til elproduktionsanlægget Kriegers Flak samt internt ledningsnet … Vattenfall Vindkraft Kriegers Flak P/S har med nærværende afgørelse den endelige godk…
supportsConsentDistance from shoreConsent granted
[2]
Danish Energy Agency (Energistyrelsen)2021-01◆ Elproduktionstilladelse - Kriegers Flak
“Vattenfall igangsatte den 3. marts 2020 anlægsarbejdet for Kriegers Flak Havvindmøllepark. … Koncessionshaver kan opføre en havmøllepark med levering af en maksimal effekt på 600 MW målt i tilslutning…”
supportsOnshore constructionOffshore construction
[3]
Danish Energy Agency (Energistyrelsen)2016-11◆ DEA Kriegers Flak result
“The lowest bid came from Vattenfall Vindkraft A/S, who will establish 600 MW in the Baltic Sea at a tender price of 37.2 øre/kWh.”
supportsMechanismDetail
Operator5
[4]
Vattenfall2018-12-20◆ Vattenfall gives go-ahead for Kriegers F…
“Vattenfall has made the final investment decisions for the offshore wind farm Kriegers Flak in Denmark ... Kriegers Flak will have 72 turbines of 8.4 MW each and a total capacity of 604.8 MW. ... Krie…”
supportsFinal investment decision
[5]
Vattenfall2019-05◆ Construction of Kriegers Flak Offshore W…
“The first of 72 so-called monopile foundations are currently being welded together to form the basis for one of Vattenfall's largest offshore wind farms.”
supportsFoundation
[6]
Vattenfall2021-01-30◆ First turbine at Kriegers Flak offshore …
“The first of 72 Siemens Gamesa 8 MW wind turbines was installed on January 27, 2021. The wind farm will comprise 72 turbines total with a production capacity of approximately 600 MW.”
supportsTurbinesModelUnit capacity
[10]
Vattenfall2021◆ Power plants: Kriegers Flak - Vattenfall
“Capacity: 605 MWe … Ownership: Vattenfall 100% … Notable Feature: 'Combined Grid Solution project' connecting to German Baltic 2 wind farm … Port of Rønne on the island of Bornholm mentioned for turbi…”
supportsoperatorStatusConnection pointCoordinatesturbine assembly
[14]
Vattenfall2021-09-06◆ Scandinavia's largest offshore wind farm…
“His Royal Highness the Crown Prince of Denmark, together with Danish Minister for Industry, Business and Financial Affairs, Simon Kollerup, has inaugurated Vattenfall's new offshore wind farm Kriegers…”
supportsCommercial operationCOD history
Auction results1
[19]
AURES II / DTU2026-06-22◆ dk-kriegers-flak-aures
AURES II Denmark case study: two-sided sliding-premium CfD vs day-ahead spot, FLH cap, DKK 100m guarantee, support-volume clawback
supportsTender award · Kriegers Flak offshore wind tender
Trade press4
[7]
offshoreWIND.biz2021-02-02◆ First electricity flows from Kriegers Fl…
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[9]
offshoreWIND.biz2021-09-06◆ Vattenfall officially opens Kriegers Fla…
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityTotal capacity
[13]
[15]