Avedore Holme
Located immediately off the coast of Avedøre Holme industrial area, south of Copenhagen, Oresund strait.
Status
Operationallifecycle stage
Ownership
Ørsted — 66.67% ◆HVHvidovre Vindmøllelaug — 33.33% ◇
Location
Øresund
Technology
Capacity
10.8 MW ◆
Turbines
3 × 3.6 MW ◆
Model
Siemens Swt 3-6-120 ◆
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Water depth
2–4 m ◇
Distance from shore
0.5 km ◆
Wind speed
8.4 m/s @ 100 m ≈
Revenue & grid
Offtake
Other ◆
Grid
Not recorded ∅
Connection
Avedore power station local grid ∅
Schedule
FID
Taken · date not recorded ∴
COD
2011 ◆
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (9 Sep 2026).
Announced-COD history: 2009-Q4→2011 · 2 recorded revisions · slipped +1.6 yr (first announced 2009-Q4)
Revenue & offtake the regime the project was built under
Offtake regime: PSO tariff (demonstrator project)
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing3≈3 turbines + 0 platforms expected · every expected structure seen
Surveyed2026-09-02≈from 107 satellite passes
Built2009 → 2011offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-08≈Copernicus Sentinel-1 radar satellite, southbound pass
Farm covered100%≈the whole farm lies inside the image
Structures ringed3 confirmed · 0 not yet confirmed≈as counted on 2026-09-02 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortCopenhagen Nordhavn ~8km ∅
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-08
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (3)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary

Sources & verification
10/17 fields verified · rests on 10 sources (5 primary) · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator3
[1]
Energistyrelsen2008-11◆ Download
“(Scanned image PDF - no machine-readable text layer; held for document existence and date evidence only. The consent sentence is carried verbatim by the ens.dk established-parks page source on this re…”
supportsConsentTurbinesConsent granted
[2]
Energistyrelsen◆ Elproduktionstilladelse - Avedoere Holme
“Elproduktionstilladelse for Avedøre Holme havvindmøllepark udstedt af Energistyrelsen. (Scanned document — text not extractable; cited for existence and regulatory authority.)”
supportsMechanismDetail
[3]
Energistyrelsen2024◆ Eksisterende havvindmølleparker
“Avedøre Holme (2009/2010) — 10.8 MW, 3 turbines. Energistyrelsen gav den 18. november 2008 Ørsted tilladelse til opstilling af 3 store demonstrationsvindmøller i havet umiddelbart syd for diget på den…”
supportsConsentFinal investment decisionOnshore constructionOffshore constructionFirst power+8 more
Operator2
[4]
Ørsted A/S2022-02◆ Ørsted Annual Report 2021
“In 2021, we started construction work at our demonstration project H2RES, which will produce renewable hydrogen for road transport powered by our two 3.6 MW offshore wind turbines at Avedøre Holme, De…”
supportsoperatorTurbinesUnit capacity
[5]
Trade press3
[6]
[7]
Maritimedanmark.dk (trade publication)2008-11
“Three new turbines were planned with a combined capacity of 10-15 MW, positioned between 20 and 100 meters out in the water at Avedøreværket on Avedøre Holme in Hvidovre. As part of the project, 13 ex…”
supportsDistance from shore
[10]
Encyclopaedic2
[8]
[9]